Loading...
30893 PRIMROSE DR FIRE21-0407 PARK RIDGEIliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 FIRE21-0407 TR36303 SPK FINAL LOT 153 30893 PRIMROSE DR Mon 6/28/2021 1:30 PM Mon 6/28/2021 2:00 PM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: PARK RIDGE HYDRANT SYSTEM PASS FAIL g FIRE ALARM PASS FAIL Thrust block pre -pour Rou - Nire inspection Underground rough F action test Underground hydro I Act detectors/velocity Flush 24 hr. batte test Final % Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour ; SPECIAL SUPPRESSION Underground rough r' Door fan test Underground hydro ;' Abort test Flush /, Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Ins ect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTfNGUISHING MISC. INSPECTION Detection system Spray booths Function Test f Hood/duct extinguishing Gas/Electricals t-off High pile rack storage Nozzle niodelloTacement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 37 Steven Fox Subject: FIRE21-0407 TR36303 O/H ROUGH/HYDRO LOT 153 Location: 30893 PRIMROSE DRIVE Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 Wed 4/14/2021 11:30 AM Wed 4/14/2021 12:00 PM (none) Steven Fox 2 Cell#: Co. Name FSS GrossSt: PARK RIDGE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro /`Q Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Seconds ipin Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation BuildingKnox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 15