Loading...
27560 CLOUDY PEAK WAY FIRE21-0730 UNION PLACEIliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: Phone#: JUAN FIRE21-0730 TR36303 SPK FINAL LOT 90 27560 CLOUDY PEAK WAY Mon 8/16/2021 8:00 AM Mon 8/16/2021 8:30 AM (none) Menifee OFM 2 951-358-9783 Cell#: Co. Name: AF oss5t: UNION PLACE HYDRANT SYSTEM PASS FAIL ` FIRE ALARM PASS FAIL Thrust block re -pour I RougtIEwire inspection Underground rough I FqKtion test Underground h dro I l6ct detectors/velocity Flush 4r24 hr. ba tte test Final JOr Sprinkler monitoring SPRINKLER U.G. Z Final Thrust block pre -pour Z SPECIAL SUPPRESSION Underground rough If Door fan test Underground hydro Abort test Flush Mechanical shutdown Final ► Detector test FIRE SPRINKLER Deluge/pre-action Final Weld inspection Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect q Removal Main drain/inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EX GUISHING MISC. INSPECTION Detections stem Spray booths Function Test If Hood/duct extinguishing Gas/Electrical s -off High pile rack storage Nozzle model/oracement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: Steven Fox Subject: FIRE21-0730 TR36303 O/H ROUGH/HYDRO LOT 90 Location: 27560 CLOUDY PEAK WAY Start: Fri 5/21/2021 10:00 AM End: Fri 5/21/2021 10:30 AM Recurrence: (none) Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name FSS CrossSt: UNION PLACE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping K UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I Finish Time: 15