Loading...
27552 CLOUDY PEAK WAY FIRE21-0728 UNION PLACEIliana Gutierrez Subject: FIRE21-0728 TR36303 SPK FINAL LOT 91 Location: 27SS2 CLOUDY PEAK WAY Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Mon 8/16/2021 8:30 AM Mon 8/16/2021 9:00 AM (none) Menifee OFM 2 Cel I#: Co. Name" FSS CrossSt: UNION PLACE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re- our Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Z Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers If Secondary piping Hose racks Z Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test:; Hood/duct extinguishing Gas/Electri2l shut-off High pile rack storage Nozzle madel/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Buildinq Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extin ui hing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 9 Steven Fox Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-0728 TR36303 O/H ROUGH/HYDRO LOT 91 27552 CLOUDY PEAK WAY Fri 5/21/2021 10:00 AM Fri 5/21/2021 10:30 AM (none) Steven Fox 2 Cell#: Co. Name: FSS I-AUbbOL. UINIU N r-LMUE: HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocitv Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 17