27544 CLOUDY PEAK WAY FIRE21-0731 UNION PLACEIliana Gutierrez
Subject: FIRE21-0 1 TR36303 SPK FINAL LOT 92
Location: CLOUD��'[�Y�� PEAK WAY
Start: Mon 8/161 0�30 AM
End: Mon 8/16/2021 9:00 AM
i
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name.
u:
FSS
CrossSt: UNION PLACE
HYDRANT SYSTEM
PASS
FAIL
Z FIRE ALARM
PASS
FAIL
Thrust block pre -pour
ough-wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battwy test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
1w
Detector test
FIRE SPRINKLER
JF
Deluge/pre-action
Weld inspection Z
Final
Overhead rough eiping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drainlins ect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary pieinQ
Hose racks
Dispensers & shear valves
X Final
Final
KITCHEN HOOD EXrINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
7
Steven Fox
Subject: FIRE21-0731 TR36303 O/H ROUGH/HYDRO LOT 92
Location: 27544 CLOUDY PEAK WAY
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Fri 5/21/2021 10:30 AM
Fri 5/21/2021 11:00 AM
(none)
Steven Fox
2
Cell#:
Co. Name: FSS
Crossbt: UNION PLACE
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
BuildingKnox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
19