Loading...
31878 EATON LN FIRE21-0060 CYPRESS(liana Gutierrez Subject: FIRE21-0060 TR30142 SPK FINAL LOT 9 Location: 31878 EATON LN Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 Thu 5/13/2021 10:30 AM Thu 5/13/2021 11:00 AM (none) Menifee OFM 2 Cell#: Co. Name: KPS Cross&: CYPRESS HYDRANT SYSTEM PASS FAIL IRE ALARM PASS FAIL Thrust block re -pour Rou ire inspection Under round rough Fu ion test Underground hydro Rgct detectors/velocity Flush lF24 hr-battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect v VN, Removal Main drain/inspect. Test Emergency shut off High pile storage OF Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD TINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electric shut-off High pile rack storage Nozzle m ell Iacement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 21 Steven Fox Subject: FIRE21-0060 TR30142 O/H ROUGH/HYDRO LOT 9 Location: 31878 EATON LN Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: (909) 906-5921 Fri 4/2/2021 8:00 AM Fri 4/2/2021 8:30 AM (none) Steven Fox 2 Cell#: Co. Name KPS CrossSt: CYPRESS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro r`. Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle modellplacement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 1