Loading...
31871 EATON LN FIRE21-0291 CYPRESSIliana Gutierrez Subject: FIRE21-0291 TR30142 O/H ROUGH/HYDRO LOT 70 Location: 31871 EATON LN Start: Tue 5/11/2021 3:30 PM End: Tue 5/11/2021 4:00 PM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: RACHEL Phone#: 909-906-5921 Cell#: Co. Name: KPS CrossSt: CYPRESS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rou h Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test i Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 5 (liana Gutierrez Subject: FIRE21-0291 TR30142 SPK FINAL LOT 70 Location: 31871 EATON LN Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 Wed 7/21/2021 10:00 AM Wed 7/21/2021 10:30 AM (none) Menifee OFM 2 Cell#: Co. Name KPS l�f USu�L: 1. T t'KCJJ HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battely test Final 0"Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping ,�f A 10 UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model) facement H.P. vents/access/corridors Fire alarm c. ' nection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 3