Loading...
31780 ABBOTT CT FIRE19-0132 CYPRESSJacie Mumme Subject: Location: Start: End: Recurrence: Organizer: Rep. Name: DENA FIRE19-0132 TR30142 SPK FINAL LOT 129 31780 ABBOTT CT Wed 1/29/2020 9:30 AM Wed 1/29/2020 10:00 AM (none) Menifee OFM Phone#: 909-906-5921 Cell#: Co Name: KPS CrossSt: CYPRESS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush , 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush f Mechanical shutdown Final i Detector test FIRE SP INKLER J Deluge/pre-action Weld inspection Final Overhead rough pipin UST/AST TANK Overhead hydro Installation UG flush / OK to connec Removal Main drain/Inspect. Test V Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final V Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: Jacie Mumme Subject: Location: Start: End: Recurrence: Organizer: Rep. Name Phone#: FIRE19-0132 TR30142 O/H ROUGH/HYDRO LOT 129 31780 ABBOTT CT Fri 11/22/2019 8:00 AM Fri 11/22/2019 8:30 AM (none) Menifee OFM DENA 909-906-5921 Cell#: Co. Name: KPS CrossSt: CYPRESS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final J Final for occupancy Start Time: Finish Time: Start Time: Finish Time: