Loading...
31773 ABBOTT CT FIRE19-0134 CYPRESSJacie Mumme Subject: FIRE19-0134 TR30142 SPK FINAL LOT 131 Location: 31773 ABBOTT CT Start: Wed 1/29/2020 10:00 AM End: Wed 1/29/2020 10:30 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: DENA Co. Name: Phone#: 909-906-5921 Cell#: KPS CrossSt: CYPRESS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. FiQ Thrust block pre -pour 'SPECIAL SUPPRESSION Underground rough Door f n test Underground hydro JAbort t st / Flush echa ical shutdown Final D ec r t t / FIRE SPRINKLER ❑elu [pre -action. -- Weld inspection Finial / Overhead rough piping �-USVAST TANK Overhead hydro / Instal anon UG flush / OK to connect R oval Main drain/Inspect. Test _mergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: Jacie Mumme Subject: FIRE19-0134 TR30142 O/H ROUGH/HYDRO LOT 131 Location: 31773 ABBOTT CT Start: Fri 11/22/2019 8:30 AM End: Fri 11/22/2019 9:00 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: DENA Phone#: 909-906-5921 Cell#: Co. Name: KPS CrossSt: CYPRESS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 1