31768 ABBOTT CT FIRE19-0133 CYPRESSJacie Mumme Subject: FIRE19-0133 TR30142 SPK FINAL LOT 130 Location: 31768 ABBOTT CT Start: Wed 1/29/2020 9:30 AM End: Wed 1/29/2020 10:00 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: DENA Phone#: 909-906-5921 Cell#: Co. Name CrossSt: CYPRESS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final _ Sprinkler monitoring SPRINKLER U.G. Final / Thrust block pre -pour SPECIAL SUPPRESSION Underground rough 1 Do r fan test Underground hydro Abojt test Flush Me haniqdl shutdown Final tecj,dr test FIRE SPRINKLER / Del ge/pre-action Weld inspection F' al Overhead rough piping \ UST/AST TANK Overhead hydro A Installation UG flush / OK to connect Removal Main drain/Inspect. Test \ Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 1 Jacie Mumme Subject: Location: Start: End: Recurrence: Organizer: Rep. Name: DENA Phone#: 909-906-5921 FIRE19-0133 TR30142 O/H ROUGH/HYDRO LOT 130 31768 ABBOTT CT Fri 11/22/2019 8:00 AM Fri 11/22/2019 8:30 AM (none) Menifee OFM Cell#: Co. Name: KPS VI V0.7171. V. 1 r f�ILJJ HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 1