31768 ABBOTT CT FIRE19-0133 CYPRESSJacie Mumme
Subject: FIRE19-0133 TR30142 SPK FINAL LOT 130
Location: 31768 ABBOTT CT
Start: Wed 1/29/2020 9:30 AM
End: Wed 1/29/2020 10:00 AM
Recurrence: (none)
Organizer: Menifee OFM
Rep. Name: DENA
Phone#: 909-906-5921
Cell#:
Co. Name
CrossSt: CYPRESS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
_
Sprinkler monitoring
SPRINKLER U.G.
Final /
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough 1
Do r fan test
Underground hydro
Abojt test
Flush
Me haniqdl shutdown
Final
tecj,dr test
FIRE SPRINKLER
/
Del ge/pre-action
Weld inspection
F' al
Overhead rough piping
\
UST/AST TANK
Overhead hydro
A
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
\
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
Start Time: Finish Time:
1
Jacie Mumme
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Rep. Name: DENA
Phone#: 909-906-5921
FIRE19-0133 TR30142 O/H ROUGH/HYDRO LOT 130
31768 ABBOTT CT
Fri 11/22/2019 8:00 AM
Fri 11/22/2019 8:30 AM
(none)
Menifee OFM
Cell#:
Co. Name: KPS
VI V0.7171. V. 1 r f�ILJJ
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
1