31701 BUCKEYE WY FIRE21-0261 CYPRESSIliana Gutierrez
Subject: FIRE21-0261 TR30142 O/H ROUGH/HYDRO LOT 2
Location: 31701 BUCKEYE WAY
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2
Rep. Name: RACHEL
Phone#: 909-906-5921
Thu 6/17/2021 3:30 PM
Thu 6/17/2021 4:00 PM
(none)
Steven Fox
2
Cell#:
Co. Name
l.rubsJi: l.Y t'KCJJ
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hvdrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
L
Iliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name:
Phone#:
RACHEL
FIRE21-0261 TR30142 SPK FINAL LOT 2
31701 BUCKEYE WAY
Tue 8/17/2021 2:00 PM
Tue 8/17/2021 2:30 PM
(none)
Steven Fox
2
909-906-5921 Cell#:
Co. Name:
KP
Cr sSt: CYPRESS NORTH
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-wirOins ection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24. hr. battery test
Final
rinkler monitoring
SPRINKLER U.G.
j
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
_
et r test
FIRE SPRINKLER
e/ re -action
Weld inspection
Aal
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detectionsystem L.
Spry booths
Function Test Y
Hood/duct extinguishing
Gas/Electrical shut-off'
High pile rack storage
Nozzle model/pfacernent
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final 6
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
15