31689 BUCKEYE WY FIRE21-0438 CYPRESS(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
FIRE21-0438 TR30142 O/H ROUGH/HYDRO LOT 4
31689 BUCKEYE WAY
Thu 6/17/2021 4:00 PM
Thu 6/17/2021 4:30 PM
(none)
Steven Fox
2
Cell#:
Co. Name: KPS
CrossSt: CYPRESS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancv
Start
Time:
Finish Time:
Start Time:
Finish Time:
5
X
(liana Gutierrez
Subject: FIRE21-0438 TR30142 SPK FINAL LOT 4
Location: 31689 BUCKEYE WAY
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
Tue 8/17/2021 2:30 PM
Tue 8/17/2021 3:00 PM
(none)
Steven Fox
K
Cell#:
Co. Name
KPS
1dru55o1: U T r Mr-00 NUM I rl
HYDRANT SYSTEM
PASS
FAIL
..FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-wfre inspection
Underground rough
Function test
Underground hydro
Ductydetectors/velocity
Flush
2 r. battery test
Final
Zprinkler monitoring
SPRINKLER U.G.
j'
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
MechaWcal shutdown
Final
,Detector test
FIRE SPRINKLER
4
QOcr e/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
�1
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Seconda piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/ lacemen
H.P. vents/access/corridors
Fire alarm connection-
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
Start Time: Finish Time:
1