31663 TYME CT FIRE20-1160 PEPPERTREEe
Steven Fox
Subject:
FIRE20-1160 TR30142-2 FINAL SPK LOT 39
Location:
31663 TYME CT
Start:
Wed 4/7/2021 2:00 PM
End:
Wed 4/7/2021 2:30 PM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name: RACHEL Co. Name: KPS
Phone#: (909) 906-5921 Cell#: CrossSt: PEPPERTREE
PASS
FAIL
HYDRANT SYSTEM PASS FAIL FIRE ALARM
Thrust block pre -pour Rough -wire inspection
Underground rough Function test
Underground hydro Duct detectors/velocit
Flush 24 hr. battery test
Final Sprinkler monitoring
SPRINKLER U.G. Final
Thrust block pre -pour SPECIAL SUPPRESSION
Underground rough Door fan test
Underground hydro Abort test
Flush Mechanical shutdown
Final Detector test
FIRE SPRINKLER Deluge/pre-action
Weld inspection Final
Overhead rough piping UST/AST TANK
Overhead hydro Installation
UG flush / OK to connect Removal
Main drain/Inspect. Test Emergency shut off
High pile storage Primary piping
In -rack sprinklers Secondary pipin
Hose racks Dispensers & shear valves
X Final Final
KITCHEN HOOD EXTINGUISHING MISC. INSPECTION
Detection system Spray booths
Function Test Hood/duct extinguishing
Gas/Electrical shut-off High pile rack storage
Nozzle model/placement H.P. vents/access/corridors
Fire alarm connection Tract access/hydrant verification
Final Other:
SPRAY BOOTHS KNOX SYSTEM
Installation Building Knox box
Air flow test Gate access Knox box/padlock
Mechanical interlock BUILDING INSPECTIONS
Extinguishing system T/I final
Fire alarm connection Shell final
Final Final for occupanc
Start Time: Finish Time:
Start Time: Finish Time:
19
Iliana Gutierrez
Subject: FIRE20-1160 TR30142 O/H ROUGH/HYDRO LOT 39
Location: 31663 TYME CT
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
Thu 2/4/2021 8:30 AM
Thu 2/4/2021 9:00 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: KPS
t-AU550L. 1- cri-LM I MLL
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X Overhead rough piping
UST/AST TANK
X Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
I Finish Time:
1
Steven Fox
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2
Rep. Name: DENA
Phone#: 909-906-5921
FIRE20-1160 TR30142 O/H ROUGH/HYDRO LOT
31663 TYME CT
Mon 1/11/2021 8:00AM �{� /'�� r�c-c 7Y-7
Mon 1/11/2021 8:30 AM
(none)
Menifee OFM
2
Cell#:
Co. Name:
KPS
VIUJJJL. rarrarC1 maa
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
JC
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time: I I Finish Time:
A IV ct