31542 EATON LN FIRE19-0127 PEPPERTREEJacie Mumme
Subject:
FIRE19-0127 TR30142 SPK FINAL LOT 115
Location:
31542 EATON LN
Start:
Wed 1/29/2020 8:00 AM
End.
Wed 1/29/2020 8:30 AM
Recurrence:
(none)
Organizer:
Menifee OFM
Rep. Name: DENA
Co. Name:
Phone#: 909-906-5921
Cell#:
KPS
CrossSt: PEPPERTREE
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
'
Final
Sprinkler monitoring '
SPRINKLER U.G.
Final
Thrust block pre -pour /'
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
/
Abort test.
Flush
Mechanical shutdown
Final
xADefector
test
FIRE SPRINKL ,R
Deluge/pre-action
Weld inspection
Final
Overhead rough piping!
/
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
/
Dispensers & shear valves
X Final
V
Final
KITCHEN HOOD EXTINGUISG
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
Jacie Mumme
Subject: FIRE19-0127 TR30142 O/H ROUGH/HYDRO LOT 115
Location: 31542 EATON LN
Start: Fri 11/8/2019 1:30 PM
End: Fri 11/8/2019 2:00 PM
Recurrence: (none)
Organizer: Menifee OFM
Rep. Name: DENA
Phone#: 909-906-5921
Cel I#:
Co. Name. KPS
V.WbbOL. rcrrmMir«M
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
I Finish Time:
1