Loading...
31506 EATON LN FIRE19-0131 PEPPERTREEJacie Mumme Subject: FIRE19-0131 TR30142 SPK FINAL LOT 112 Location: 31506 EATON LN Start: Thu 1/16/2020 9:00 AM End: Thu 1/16/2020 9:30 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: DENA Co. Name: Phone#: 909-906-5921 Cell#: am CrossSt: PEPPERTREE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPUME SUPPRESSION Underground rough Door est Underground hydro test Flush a al shutdown Final to test FIRE SPRINKLER I 1,0V ORemoval -action Weld inspection Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Main drain/Inspect. Test Wr Emergency shut off High pile storage dePrimary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOO XTINGUISHING MISC. INSPECTION Detection sys VESpray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: Jade Mumme Subject: Location: Start: End: Recurrence: Organizer: Rep. Name Phone#: FIRE19-0131 TR30142 O/H ROUGH/HYDRO LOT 112 31506 EATON LN Wed 11/13/2019 11:00 AM Wed 11/13/2019 11:30 AM (none) Menifee OFM DENA 909-906-5921 Cell#: Co. Name: KPS CrossSt: PEPPERTREE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final 1. Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro ' Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: