Loading...
26476 KEEL CT PMT17-00739 PEPPERTREESonya Rivera-Bu N10 , �kD-Mtz%\,— az8 c� Subject: 17-MENI-00739 TR30142-2 LOT 138 SPK FINAL Location: Start: End: Recurrence: Rep. Name: DENA 26476 KEEL CT Thu 4/12/2018 1:00 PM Thu 4/12/2018 1:30 PM (none) Phone#: 909-906-5921 Cel I#: Co. Name: KPS CrossSt: PEPPERTREE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector tee., FIRE SPRINKLER De1ugo'pre-action Weld inspection -Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: Sonva Rivera-Bu Subject: 17-MENI-00739 TR30142-2 LOT 138 SPK FINAL Location: 26476 KEEL CT Start: Thu 4/5/2018 8:30 AM End: Thu 4/5/2018 9:00 AM Recurrence: (none) Organizer: Paul Villalobos Rep. Name: DENA Phone#: Cell#: Co. Name: KPS CrossSt: PEPPERTREE HYDRANT SYSTEM PASS AIL" FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Y�1G Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves '♦, Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: Sonya Rivera-Bu Subject: 17-MENI-00739 LOT 138 TR30142-2 O/H ROUGH/HYDRO RE -INSPECTION Location: 26476 KEEL CT Start: Fri 2/23/2018 1:30 PM End: Fri 2/23/2018 2:00 PM Recurrence: (none) Organizer: Paul Villalobos Rep. Name: DENA Phone#: 909-906-5921 Cell#: Co. Name: KPS U[UbbOL. I'CI I CK I rSCC HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 1 Sonya Rivera-Bu Subject: 17-MENI-00739 LOT 138 TR 30142-2 O/H ROUGH/HYDRO Location: 26476 KEEL CT Start: Thu 2/22/2018 9:30 AM End: Thu 2/22/2018 10:00 AM Recurrence: (none) Rep. Name: DENA Co. Name: Phone#: 909-906-5921 Cell#: KPS CrossSt: PEPPERTREE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect 1 Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: I 1 Riverside County Fire Department V"tathe Fire Marshal Riverside Office: Palm Desert Office: 2300 Market Street, Ste. 150 77-933 Las Montanas Rd., Ste 201 Riverside, CA 92501� Palm Desert CA 92211 Phone: (951) 955-4777 - Fax: (951) 955-4886 Phone: (760.] 863-8886 - Fax: 760 863-7072 PLAN REVIEW FORM CRYOF91 skeenly Building Dept. ® New ❑ Re -Submittal # ❑ As-builts ]AN t FD Permit # 17-MENI-00739 County/City Permit# Re Ceived PROJECT INFORMATION Project Name: PEPPERTREE @ HIDDEN HILLS I have read and understand that Fire Dept. fees are Deposit Based Fees and there may be additional Address: 26476 Keel Court Lot 138 Plan 5 (240.2544) money due prior to or after pro'1ect final City & Zip: Sign: Print: APPLICANT INFORMATION Company Name: KPS FIRE SPRINKLERS Applicant Name. DENA BROCATO Address: 760 S ROCHESTER SUITE B Phone: 909-906-5921 City/ Zip: ONTARIO CA 91761 Email: DBROCATO@KPSFIRE.COM BILLING INFORMATION: ❑ Same as applicant Company Name: SAME Applicant Name: Address: Phone: City/ Zip: Email: The person listed on "Billing Information" will receive ALL billing, correspondence and refunds for any work billed to this permit. Any changes in billing information must be made in writing to our office. Plan Review Type (Check appropriate items) Menifee, CA 92584 ❑Commercial ❑Residential ❑Other Construction: ❑Building ❑Tenant Improvement (New/Existing) ❑Cell Site ❑High Pile/Racks ❑HFA Systems: ®Sprinkler DTI Sprinkler ❑Sprinkler Monitoring ❑Fire Alarm ❑Hood & Duct Suppression ❑Other Suppression ❑Spray Booth DUG Water Other: Storage Tanks: ❑Dispensers Only ❑Above Ground # ❑Underground # OFFICE USE ONLY Fee Paid: Reviewed by: a� G1 Called for Pick -Up Date Paid: o lS 1 , l Date: By: PC Review Date: Picked -Up Check#: Approved ❑ Denied Date: By: Received By: Plans Stamped: 4es ❑No Shipped By / Method Letter Attached: es ❑No Receipt#(OCR) Job Card Included: ❑Yel ❑DBF ❑DBF DBF Norm I — Kevised b/ 14/2017 visit us at www.rvctire.org