Loading...
26471 WREATH CT FIRE20-1533 CYPRESSIliana Gutierrez Subject: FIRE20-1533 TR30142 SPK FINAL LOT 7 Location: 26471 WREATH CT Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: DENA Phone#: 909-906-5921 Mon 5/3/2021 9:00 AM Mon 5/3/2021 9:30 AM (none) Menifee OFM 2 Cell#: Co. Name UFU550t: UTrMMOO HYDRANT SYSTEM PASS FAIL VRE ALARM PASS FAIL Thrust block pre -pour Rou h- i e inspection Underground rough FuncUdh test Underground hydro Duof detectors/velocit Flush hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour / SPECIAL SUPPRESSION Under round rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER lip Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Emergency shut off Main drain/Inspect. Test High pile storage Primary piping In-racksprinklers NSecondary piping Hose racks J Dispensers & shear valves X Final Final KITCHEN HOOV EXTINGUISHING MISC. INSPECTION Detection systqf4 Spray booths Function Te Hood/duct extinguishing Gas/Electr' al shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupant Start Time: Finish Time: Start Time: Finish Time: 3 Iliana Gutierrez Subject: FIRE20-1533 TR30142 O/H ROUGH/HYDRO LOT 7 Location: 26471 WREATH CT Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 Mon 3/22/2021 2:30 PM Mon 3/22/2021 3:00 PM (none) Menifee OFM 2 Cell#: Co. Name: KPS CrossSt: CYPRESS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. batte test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping i•� UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 41