26116 ABBEY LN FIRE19-0212 CYPRESSJacie Mumme
Subject:
FIRE19-0212 TR30142 SPK FINAL LOT 134
Location:
26116 ABBEY LN
Start:
Wed 1/29/2020 8:30 AM
End:
Wed 1/29/2020 9:00 AM
Recurrence:
(none)
Organizer:
Menifee OFM
Rep. Name: DENA
Co. Name:
Phone#: 909-906-5921
Cell#:
KPS
CrossSt: CYPRESS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydra
Abort test /
Flush
Mechanical sh tdown
Final
Detector tesf
FIRE SPRIN
ER
Delugplpre-action
Weld inspection
Fi al
Overhead rough piping
UST/AST TANK
Overhead hydro ti
Installation
UG flush / OK to connect t
Removal
Main drain/Inspect. Test /
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers A
Secondary piping
Hose racks j
Dispensers & shear valves
X Final
v
Final
KITCHEN HOOD'EXTINGUI HING
MISC. INSPECTION
Detection system
Spray booths
Function Test }
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
Jade Mumme
Subject: FIRE19-0212 TR30142 O/H ROUGH/HYDRO LOT 134
Location: 26116 ABBEY LN
Start: Mon 12/2/2019 8:00 AM
End: Mon 12/2/2019 8:30 AM
Recurrence: (none)
Organizer: Menifee OFM
Rep. Name: DENA
Phone#: 909-906-5921
Cell#:
Co. Name: KPS
CrossSt: CYPRESS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
X
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time: