26104 REDOAK ST FIRE20-0432 CYPRESSIliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Rep. Name: DENA Phone#: 909-906-5921 FIRE20-0432 TR30142 SPK FINAL LOT 151 26104 REDOAK ST Thu 8/13/2020 9:00 AM Thu 8/13/2020 9:30 AM (none) Menifee OFM Cell#: Co. Name KPS U[UbbOL. U T r MMOO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SP§feL SUPPRESSION Underground rough Door f e-st Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect A00W Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinkleqop, IL Secondary piping Hose racks Dispensers & shear valves X Final Final KITCFiFN HOOD EXTINGUISHING MISC. INSPECTION DOction system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 1 Steven Fox Subject: FIRE20-0432 TR30142 O/H ROUGH/HYDRO LOT 151 Location: 26104 REDOAK ST Start: Wed 6/17/2020 11:00 AM End: Wed 6/17/2020 11:30 AM Recurrence: (none) Organizer: Steven Fox Rep. Name- DENA Phone#: 909-906-5921 Cel I#: Co. Name: KPS CrossSt: CYPRESS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping ,?c UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time Start Time: Finish Time: 19