Loading...
26086 REDOAK ST FIRE20-0567 CYPRESS(liana Gutierrez Subject: FIRE20-0567 TR30142 SPK FINAL LOT 154 Location: 26086 REDOAK ST Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: DENA Phone#: 909-906-5921 Tue 9/15/2020 8:00 AM Tue 9/15/2020 8:30 AM (none) Menifee OFM 2 Cell#: Co. Name: KPS LA U65iOL. 1. T rMr-JJ HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function Zest Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. 11. inal Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage V Primary piping In -rack sprinklers 9L Secondary piping Hose racks Dispensers & shear valves Final X Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test ,: Hood/duct extinguishing Gas/Electrical` shut-off High pile rack storage Nozzle mo061/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 3 (liana Gutierrez Subject: FIRE20-0567 TR30142 O/H ROUGH/HYDRO LOT 154 Location: 26086 REDOAK ST Start: Wed 7/15/2020 8:30 AM End: Wed 7/15/2020 9:00 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: DENA Co. Name: KPS Phone#: 909-906-5921 Cell#: CrossSt: CYPRESS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Under round rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: