27789 CALLE LOS OLIVOS FIRE21-0273 TALAVERASteven Fox
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: DANIEL
Phone#: 951-703-5210
FIRE21-0273 TR29777 SPK FINAL LOT 103
27789 CALLE LOS OLIVOS
Wed 5/26/2021 12:30 PM
Wed 5/26/2021 1:00 PM
(none)
Steven Fox
2
Cell#:
Co. Name: NP MECHANICAL
CrossSt: TALAVERA
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
d
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
29
Steven Fox
Subject: FIRE21-0273 TR29777 O/H ROUGH/HYDRO LOT 103
Location: 27789 CALLE LOS OLIVOS
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: DANIEL
Phone#: 951-703-5210
HYDRANT SYSTEM
Thrust block pre -pour
Underground rough _
Underground hydro
Wed 3/31/2021 2:00 PM
Wed 3/31/2021 2:30 PM
(none)
Steven Fox
N
Flush
Final
SPRINKLER U.G.
Thrust block pre -pour
Underground rough
Underground hydro
Flush
Final
FIRE SPRINKLER
Weld inspection
X Overhead rough piping
X Overhead hydro
UG flush / OK to connect
Main drain/Inspect. Test
High pile storage
In -rack sprinklers
Hose racks
Final
KITCHEN HOOD EXTINGUISHING
Detection system
Function Test
Gas/Electrical shut-off
Nozzle model/placement
Fire alarm connection
Final
SPRAY BOOTHS
Installation
Air flow test
Mechanical interlock
Extinguishing system
Fire alarm connection
Final
Start Time: Finish Time:
Start Time: Finish Time:
Cell#:
PASS
FAIL
Co. Name: NP MECHANICAL
CrossSt: TALAVERA
FIRE ALARM
Rou h-wire inspection
Function test
Duct detectors/velocit
24 hr. battery test
Sprinkler monitoring
Final
SPECIAL SUPPRESSION
Door fan test
Abort test
Mechanical shutdown
Detector test
Deluge/pre-action
Final
UST/AST TANK
Installation
Removal
Emergency shut off
Primary piping
Secondary piping
Dispensers & shear valves
Final
MISC. INSPECTION
Spray booths
Hood/duct extinguishing
High pile rack storage
H.P. vents/access/corridors
Tract access/hydrant verification
Other:
KNOX SYSTEM
—13WIding Knox box
Gate access Knox box/padlock
BUILDING INSPECTIONS
T/I final
Shell final
Final for occuaancv
PASS I FAIL
10