Loading...
30118 STARGAZER WAY FIRE20-1116 SAVANNAHSteven Fox Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 FIRE20-1116 TR36485-2 SPK FINAL LOT 121 30118 STARGAZER WAY Tue 1/19/2021 8:00 AM Tue 1/19/2021 8:30 AM (none) Steven Fox 2 Cell#: Co. Name: r ?I 114 T I FSS %il V.700 L. Qr%VP11VIVP1rl HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test _ Underround hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final x Final KITCHEN HOOD EXTINGUISHING 1 MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Buildin Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: k, (liana Gutierrez Subject: FIRE20-1116 TR36485-2 O/H ROUGH/HYDRO LOT 121 Location: 30118 STARGAZER WAY Start: End: Recurrence: Organizer: Call Handling Mode 2: Thu 10/29/2020 8:00 AM Thu 10/29/2020 8:30 AM (none) Menifee OFM 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS GrossSt: SAVANNAH HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping 0, UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 3