Loading...
24543 FAIR OAKS LN FIRE21-0148 VALOR WESTSteven Fox Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 FIRE21-0148 TR36485 SPK FINAL LOT 60 24543 FAIR OAKS LN Tue 6/29/2021 4:00 PM Tue 6/29/2021 4:30 PM (none) Steven Fox 2 Cell#: Co. Name: FSS UrOSSJl: VHLUM VVtJ I HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishin Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 21 Steven Fox Subject: FIRE21-0148 TR36485 O/H ROUGH/HYDRO LOT 60 Location: 24543 FAIR OAKS LN Start: Fri 4/16/2021 12:30 PM End: Fri 4/16/2021 1:00 PM Recurrence: (none) Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: HECTOR Phone#: 951-847-2908 Cell#: Co. Name: FSS CrossSt: VALOR WEST HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping }C UST/AST TANK X Overhead hydro C Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Seconds piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time. Finish Time: 23