Loading...
24533 METAL CIRCLE FIRE21-0051 VAQUEROIliana Gutierrez Subject: FIRE21-0051 TR36485 SPK FINAL LOT 90 Location: 24533 METAL CIRCLE Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JOE Phone#: 951-595-5423 Mon 6/14/2021 10:00 AM Mon 6/14/2021 10:30 AM (none) Menifee OFM 2 Cell#: Co. Name NP MECHANICAL kAU55JG V/AWUCKU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rou h-wire inspection Under round rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. batte test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSIEN Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detectoripff FIRE SPRINKLER Del u re -action Weld inspection F' al Overhead rough piping UST/AST TANK Overhead hydro Ilation UG flush / OK to connect emoval Main drain/Inspect. Test Emergency shut off High pile storage Prima piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUI NG MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut, -Of High pile rack storage Nozzle model) cement H.P. vents/access/corridors Fire alarm section Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 21 Steven Fox Subject: FIRE21-0051 TR36485 O/H ROUGH/HYDRO LOT 90 Location: 24533 METAL CIRCLE Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JOE Phone#: 951-595-5423 Thu 3/18/2021 3:30 PM Thu 3/18/2021 4:00 PM (none) Steven Fox 2 Cell#: Co. Name: NP MECHANICAL L;rOSSSt: VAUULKU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Under, round rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect ( Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS -Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 31