Loading...
24509 METAL CIRCLE FIRE21-0052 VAQUERO(liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JOE Phone#: 951-595-5423 FIRE21-0052 TR36485 SPK FINAL LOT 92 24509 METAL CIRCLE Mon 6/14/2021 10:30 AM Mon 6/14/2021 11:00 AM (none) Menifee OFM 2 Cell#: Co. Name: NP MECHANICAL CrossSt: VAQUERO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/vo, I Flush 24 hr. batterylAt Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough ,door fan test Underground hydro 00 Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro X Installation UG flush / OK to connect A4 1 Removal Main drain/Inspect. Test A Emergency shut off High pile storage 00, Primary piping In -rack sprinklers 10F Secondary piping Hose racks lb Dispensers & shear valves X Final Final KITCHEN HOOD XTINGUISHING J MISC. INSPECTION Detections stem/' Spray booths Function Test _ Hood/duct extinguishing Gas/Electr. l shut-off High pile rack storage Nozzle odel/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation BuildingKnox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 27 Steven Fox Subject: FIRE21-0052 TR36485 O/H ROUGH/HYDRO LOT 92 Location: 24509 METAL CIRCLE Start: Thu 3/18/2021 4:00 PM End: Thu 3/18/2021 4:30 PM Recurrence: (none) Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: JOE Phone#: 951-595-5423 Cell#: Co. Name: NP MECHANICAL UFUSSOL VAWUMMU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect / Removal Main drain/Inspect. Test Emergenc shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extin uishin Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/vadlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 33