Loading...
24477 DIABLO WAY PMT17-03299 SAVANNAHSonya Rivera-Bu 0329ol Subject: 17-MENI-a-3298- TR36485-2 LOT 6 SPK FINAL Location: Start: End: Recurrence: Rep. Name: ANDREW Phone#: 24477 DIABLO WAY Tue 4/10/2018 2:00 PM Tue 4/10/2018 2:30 PM (none) Cell#: Co. Name: FSS CrossSt: SAVANNAH MODEL HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection IR151 ' Overhead rough piping UST/AST TANK Overhead hydro I A Installation UG flush / OK to connect Jw Removal Main drain/Inspect. Test A Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final tFinal for occupancy Start Time: Finish Time: Start Time: Finish Time: Sonya Rivera-Bu Subject: 17-MENI-03288 LOT 6 TR36485-2 O/H ROUGH/HYDRO Location: 24477 DIABLO WAY Start: Wed 2/21/2018 9:00 AM End: Wed 2/21/2018 9:30 AM Recurrence: (none) Rep. Name: ANDREW Phone#: 657-549-7375 Cell#: Co. Name: FSS urossbu JAV/HNNAI-I HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect / Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: J �`O� LT 'lam Start Time: Finish Time: i�C-� L0 C" lid- ��' �`�rl c►- �