Loading...
24383 RESERVE CT FIRE21-0203 TRIBUTE II(liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2 Rep. Name: HECTOR Phone#: 951-847-2908 FIRE21-0203 TR36485 SPK FINAL LOT 31 24383 RESERVE CT Mon 5/24/2021 9:30 AM Mon 5/24/2021 10:00 AM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: TRIBUTE II HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro DucOetectors/velocitv Flush 251,11hr. battery test Final /Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping A UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrfcal shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 9 (liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2 Rep. Name: HECTOR Phone#: 951-847-2908 FIRE21-0203 TR36485 O/H ROUGH/HYDRO LOT 31 24383 RESERVE CT Thu 3/11/2021 10:00 AM Thu 3/11/2021 10:30 AM (none) Menifee OFM 2 Cell#: Co. Name: FSS %rl uJJOl. 1 Rlou 1 C II HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping ; •,, UST/AST TANK X Overhead hvdro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 7