Loading...
2021/04/07 CIP 16-07 Traffic Signal Communication (WEST) Project Change Order, Federal Agreement No. HSIPL-5483-(003), Lucas RatheCity of Menifee Memorandum To: Carlos Geronimo, P.E., City of Menifee Engineer Page: 1 of 2 From: Lucas Rathe, P.E., Resident Engineer — AnserAdvisory Date: April 7, 2021 RE: CIP 16-07 Traffic Signal Communication (WEST) Project Federal Agreement No. HSIPL-5483-(003) Subject: Transmittal for CCO #3 — Relocate Type 7 & 3 Radios and Signal Reconfigurations. Background & Scope This Change Order provides compensation to the contractor to relocate previously installed radios to establish a complete communication link for the system. CCO 2 directed the contractor to procure and install (2) Type 7 radios to the La Piedra/Evans Intersection. Once the CCO 2 work was installed, it was noticed by the team that the La Piedra/Evans Intersection link still could not be established due to a line -of -sight issue back to Tower #2. The Project Designer then directed that (3) Type 7 radios and (2) Type 3 be relocated. These radios were already installed on the project. This change order compensates the contractor for removal, relocation of 5 radios, installation, additional conductor wire, and reconfiguring radio signals to establish a working system. In addition, the existing CISCO switch needed to be reconfigured to communicate with the wireless, fiber and copper signal transmission system. Compensation The contractor will be compensated a lump sum amount of $32,464.42 that includes all labor, equipment and materials required for the scope of this change. The Engineer performed an independent cost analysis (ICE) for CCO #3 and backup calculations which can be found in the CIP 16-07 Citywide Traffic Signal Communication (WEST) project files. Time Consideration CCO#3 work is not a controlling item therefore, no additional time is warranted. No Adjustment CCO recommendation, concurrence, and approval: �_ J Resident Engineer Lucas Rathe, PE Date: April 7 2021 City of Menifee Engineer Carlos Geronimo, PE Date: 7 ',27• 2 C�' V Attached: CCO #3 Transmittal Memo CCO 3 Date 41712021 Page 2 of 2 ONCUMOrrrroo 70" cuavia 01-90-zdl H - 30err do wo 0 aW l CITY OF MENIFEE DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. 003 DATE: 4/7/2021 PROJECT DESCRIPTION: Citywide Traffic Signal Communication (WEST) PROJECT NO: CIP#16-07 Federal 1. D HSIPL-5493{003) CONTRACTOR: Belco Elecoor Group DESCRIPTION OF CHANGES AND/OR EXTRA WORK: The Contractor is hereby directed to make the herein described changes from the plans and specifications and/or perform the following described work not included in the Plans and Specifications for this project Oty % Page 1 of 2 CCO 3 As directed by the Engineer, relocate Type #7 and #3 Radios along Newport Road to Berea, Bradley end Town Center and establish communication links to Tower #2 LS % $32,464 42 NA TOTAL ESTIMATED PRICE FOR THIS CHANGE ORDER: 132.464.42 This document shall become an amendment to the Contract and all provisions of the Contract will apply hereto This Change Order consiitutas a complete and final resolution of all claims ofthe Contract for additional time or additional compensation related te or affected bywork that is the subject of this Change Onden C-milies of items other than Lump Sum are not to exceed the amounts indicated JUSTIFICATION: ITEM CCO 3 - In accordance with Section 3-3 "Extra Work," as directed by the Engineer the contractor is to remove and relocate Type 7 and Type 3 radios, add cable to establish a complete communication link back to Tower #2. The previously installed Type 7 radios (CCO 2) continued to have line- of- sight issues, which forced the Type 7 8 3 radios to be relocatedlexchanged from other intersections in order to establish a complete communication link The following relocations to be completed: Relocate Type 7 Radios: From: La PiedralEvans To: NewporUBradley From: La Pidra/Evons To: Newport/Berea From: La Pi:dra/Evans To: Newport/Town Center Relocate Type 3 Radios: From: Newport/Berea To: Newport/Serea NW From: Newport/Berea To: Newport/Murrieta Contractor will be compensated a lump sum amount of $32,464.42 which includes all labor, material, equipment, tools, incidentals and all markups by reason of this change order. Time Adjustment- CCO 3 Additional Radio relocations and signal reconfigurations are not a controlling Items, therefore 0 days of additional time is warranted. CITY OF MENIFEE DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO- 003 CONTRACT VARIANCE SUMMARY prq.ul CwYrscl AmplW $412,700 00 Pmv— Change Order Amounts: $38,712 B2 Cefnem Chang OrderAmeuel $32.46442 Revised Contract Amount: $4831877124 AUTHORIZATION BY CRY: Recommwld by: ^�// 7 Date: 7,2 21 E. 1 Ergin4ur loppc4 eger o..1L�`z 1 Director of Public Works / City Engineer ACCEPTANCE BY CONTRACTOR: Expected Date Started: January 3, 2021 Original Completion Dale: December 24, 2020 Additional Time (Working Days) p Revised Completion Date: December 24, 2020 Computed Completion Date to Date: December 24, 2020 Lucas Re he Resident Engineer / Construction Manager Armando Villa City Manager We, the undersigned Contractor, have given careful consideration to the above described changes and/or extra work and hereby agree [hat said work is a supplement to the contract and all previsions will apply hereto 1— Accepted Agi _ Dale: 4/9/21 Signature Alberto Garcia, President/CEO Please print name and title nma Apra r zn2t 713�Z/ Dale: