31097 BAY HORSE WAY FIRE19-0228 CANVASJacie Mumme
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Rep. Name: DANIEL
Phone#: 951-703-5210
FIRE19-0228 TR32277-3 SPK FINAL LOT 60
31097 BAY HORSE WAY
Thu 2/20/2020 11:30 AM
Thu 2/20/2020 12:00 PM
(none)
Menifee OFM
Cell#:
Co. Name: NP MECHANICAL
CrossSt: CANVAS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
rinkler monitoring
SPRINKLER U.G.
Fi
ial
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Dc
or fan test
Underground hydro
A
o test
Flush
M
�chanical shutdo
Final
D
.tector test
FIRE SPRINKLER
-00uge/Pr&4ctjon
Weld inspection
Fina
Overhead rough piping
UST/AST TANK
Overhead hydro"Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
1
Jacie Mumme
Subject: FIRE19-0228 TR32277-3 O/H ROUGH/HYDRO LOT 60
Location: 31080 BAY HORSE WAY
Start: Fri 12/6/2019 2:00 PM
End: Fri 12/6/2019 2:30 PM
Recurrence: (none)
Organizer: Menifee OFM
Rep. Name: DANIEL
Phone#: 951-703-5210 Cell#:
Co. Name: NP MECHANICAL
CrossSt: CANVAS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Y
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time: