31073 BAY HORSE WAY FIRE19-0226 CANVASJacie Mumme
Subject:
FIRE19-0226 TR32277-3 SPK FINAL LOT 58
Location:
31073 BAY HORSE WAY
Start:
Thu 2/20/2020 11:00 AM
End:
Thu 2/20/2020 11:30 AM
Recurrence:
(none)
Organizer:
Menifee OFM
Rep. Name: DANIEL
Co. Name:
Phone#: 951-703-5210
Cell#:
NP MECHANICAL
CrossSt: CANVAS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Functio
Underground hydro
Duct electors/v locity
Flush
24 r. battery tes
Final
S rinkler monito ing
SPRINKLER U.G.
Fi ial
/I
Thrust block pre -pour
SPECI SUPPRESSION
Underground rough
D or fan tes
Underground hydro
A rt test
Flush
Me al 5041down
Final
r
De ctor st
FIRE SPRINKLER
D2 uge/ -action
Weld inspection
i
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
Jacie Mumme
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Rep. Name: DANIEL
FIRE19-0226 TR32277-3 O/H ROUGH/HYDRO LOT 58
31073 BAY HORSE WAY
Fri 12/6/2019 1:30 PM
Fri 12/6/2019 2:00 PM
(none)
Menifee OFM
Phone#: 951-703-5210 Cell#:
Co. Name: NP MECHANICAL
CrossSt: CANVAS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy