Loading...
31049 BAY HORSE WAY FIRE19-0224 CANVASJacie Mumme Subject: FIRE19-0224 TR32277-3 SPK FINAL LOT 56 Location: 31049 BAY HORSE WAY Start: Thu 2/20/2020 10:30 AM End: Thu 2/20/2020 11:00 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: DANIEL Co. Name: Phone#: 951-703-5210 Cell#: NP MECHANICAL CrossSt: CANVAS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSI Underground rough Door fan test Underground hydro Abort test Flush Mechanica�utdown Final , DetecOrlest FIRE SPRINKLER D ge/pre-action Weld inspection final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect X Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final V Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: Jacie Mumme Subject: Location: Start: End: Recurrence: Organizer: Rep. Name: DANIEL FIRE19-0224 TR32277-3 O/H ROUGH/HYDRO LOT 56 31049 BAY HORSE WAY Fri 12/6/2019 1:00 PM Fri 12/6/2019 1:30 PM (none) Menifee OFM Phone#: 951-703-5210 Cell#: Co. Name NP MECHANICAL CrossSt: CANVAS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I I Finish Time: