29693 HOLSTEINER WAY FIRE20-0234 CANVASSteven Fox
Subject: FIRE20-0234 TR32277 SPK FINAL LOT 105
Location: 29693 HOLSTEINER WAY
Start: Thu 6/18/2020 12:30 PM
End: Thu 6/18/2020 1:00 PM
Recurrence: (none)
Organizer: Steven Fox
Rep. Name. DANIEL
Phone#: 951-703-5210
Cell#:
Co. Name. NP MECHANICAL
CrossSt: CANVAS
HYDRANT SYSTEM
PASS
FAIL
FIRE &ARM
PASS
FAIL
Thrust block pre -pour
Rough -wire in ction
Underground rough
Function to
Underground hydro
Duct det ors/velocity
Flush
24 hr. ttery test
Final
Sp ' ler monitoring
SPRINKLER U.G.
VKal
Thrust block pre -pour
IF SPECIAL SUPPRESSION
Underground rough
Of
Door fo test
Underground hydro
Abort t
Flush
Mechalpal shutdown
Final
Dj"ctcaest
FIRE SPRINKLER
-action
Weld inspection
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
'
Final
KITCHEN HOOD EXTINC ISHING
MISC. INSPECTION
Detection system If
Spray booths
Function Test If
Hood/duct extinguishing
Gas/Electrical shut-9f
High pile rack storage
Nozzle modellplacpfrent
H.P. vents/access/corridors
Fire alarm conn ion
Tract access/hydrant verification
Final
Other:
S AY BOOTHS
KNOX SYSTEM
Installatio
Building Knox box
Air flow tt
Gate access Knox box/padlock
Mecha ical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
15
Bernice Rivera
Subject: FIRE20-0234 TR32277-3 O/H ROUGH/HYDRO LOT 105
Location: 29693 HOLSTEINER WAY
Start: Tue 4/7/2020 10:00 AM
End: Tue 4/7/2020 10:30 AM
Recurrence: (none)
Organizer: Menifee OFM
Rep. Name: DANIEL
Phone#: (951) 703-5210 Cell#:
Co. Name: NP MECHANICAL
uross5t: L;HNVHS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. batlery lest
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time: