Loading...
29693 HOLSTEINER WAY FIRE20-0234 CANVASSteven Fox Subject: FIRE20-0234 TR32277 SPK FINAL LOT 105 Location: 29693 HOLSTEINER WAY Start: Thu 6/18/2020 12:30 PM End: Thu 6/18/2020 1:00 PM Recurrence: (none) Organizer: Steven Fox Rep. Name. DANIEL Phone#: 951-703-5210 Cell#: Co. Name. NP MECHANICAL CrossSt: CANVAS HYDRANT SYSTEM PASS FAIL FIRE &ARM PASS FAIL Thrust block pre -pour Rough -wire in ction Underground rough Function to Underground hydro Duct det ors/velocity Flush 24 hr. ttery test Final Sp ' ler monitoring SPRINKLER U.G. VKal Thrust block pre -pour IF SPECIAL SUPPRESSION Underground rough Of Door fo test Underground hydro Abort t Flush Mechalpal shutdown Final Dj"ctcaest FIRE SPRINKLER -action Weld inspection Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final ' Final KITCHEN HOOD EXTINC ISHING MISC. INSPECTION Detection system If Spray booths Function Test If Hood/duct extinguishing Gas/Electrical shut-9f High pile rack storage Nozzle modellplacpfrent H.P. vents/access/corridors Fire alarm conn ion Tract access/hydrant verification Final Other: S AY BOOTHS KNOX SYSTEM Installatio Building Knox box Air flow tt Gate access Knox box/padlock Mecha ical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 15 Bernice Rivera Subject: FIRE20-0234 TR32277-3 O/H ROUGH/HYDRO LOT 105 Location: 29693 HOLSTEINER WAY Start: Tue 4/7/2020 10:00 AM End: Tue 4/7/2020 10:30 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: DANIEL Phone#: (951) 703-5210 Cell#: Co. Name: NP MECHANICAL uross5t: L;HNVHS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. batlery lest Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: