29681 HOLSTEINER WAY FIRE20-0233 CANVASSteven Fox
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Rep. Name: DANIEL
Phone#: 951-703-5210
FIRE20-0233 TR32277 SPK FINAL LOT 106
29681 HOLSTEINER WAY
Thu 6/18/2020 12:30 PM
Thu 6/18/2020 1:00 PM
(none)
Steven Fox
Cell#:
Co. Name: NP MECHANICAL
CrossSt:. ,- CANVAS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire irpg'pection
Underground rough
Function test
Underground hydro
Duct defectors/velocity
Flush
240. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drainllnspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical 'hut -off
High pile rack storage
Nozzle mod (placement
H.P. vents/access/corridors
Fire alarnyconnection
Tract access/hydrant verification
Final ,
I
Other:
SPRAY BOOTHS
KNOX SYSTEM
Instg1lation
Building Knox box
A'r flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
17
Bernice Rivera
Subject:
FIRE20-0233 TR32277-3 O/H ROUGH/HYDRO LOT 106
Location:
29681 HOLSTEINER WAY
Start:
Tue 4/7/2020 9:30 AM
End:
Tue 4/7/2020 10:00 AM
Recurrence:
(none)
Organizer:
Menifee OFM
Rep. Name: DANIEL
Phone#: (951) 703-5210
Cell#:
Co. Name:
NP MECHANICAL
k�I UJJJ L. l0/11 V v mo
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
1