Loading...
29681 HOLSTEINER WAY FIRE20-0233 CANVASSteven Fox Subject: Location: Start: End: Recurrence: Organizer: Rep. Name: DANIEL Phone#: 951-703-5210 FIRE20-0233 TR32277 SPK FINAL LOT 106 29681 HOLSTEINER WAY Thu 6/18/2020 12:30 PM Thu 6/18/2020 1:00 PM (none) Steven Fox Cell#: Co. Name: NP MECHANICAL CrossSt:. ,- CANVAS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire irpg'pection Underground rough Function test Underground hydro Duct defectors/velocity Flush 240. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drainllnspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical 'hut -off High pile rack storage Nozzle mod (placement H.P. vents/access/corridors Fire alarnyconnection Tract access/hydrant verification Final , I Other: SPRAY BOOTHS KNOX SYSTEM Instg1lation Building Knox box A'r flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 17 Bernice Rivera Subject: FIRE20-0233 TR32277-3 O/H ROUGH/HYDRO LOT 106 Location: 29681 HOLSTEINER WAY Start: Tue 4/7/2020 9:30 AM End: Tue 4/7/2020 10:00 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: DANIEL Phone#: (951) 703-5210 Cell#: Co. Name: NP MECHANICAL k�I UJJJ L. l0/11 V v mo HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 1