29584 CABALLERO CT FIRE20-0994 MAJESTIC(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JOE
Phone#: 951-595-5423
FIRE20-0994 TR31822-2 SPK FINAL LOT 66
29584 CABELLERO CT
Mon 12/14/2020 1:00 PM
Mon 12/14/2020 1:30 PM
(none)
Steven Fox
2
Cell#:
vi vJ'�A-I P-c,vA t4
1016t(7_�
Co. Name: NP MECHANICAL
CrossSt: MAJESTIC
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
LFInal
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
OF
Deluge/pre-action
Weld inspection
Final
Overhead rough piping 00,
UST/AST TANK
Overhead hydro
a
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detect oh system
Spray booths
Funo, on Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
'Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time: Finish Time:
31
Iliana Gutierrez
Subject:
FIRE20-0994 TR31822-2 O/H ROUGH/HYDRO LOT 66
Location:
29584 CABALLERO CT
Start:
Thu 10/1/2020 2:30 PM
End:
Thu 10/1/2020 3:00 PM
Recurrence:
(none)
Organizer:
Menifee OFM
Call Handling Mode 2:
2
Rep. Name: JUAN
Phone#: 951-858-7939
Cell#:
Co. Name: NP MECHANICAL
CrossSt: MAJESTIC
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rou h
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
►.
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Seconds piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
I Finish Time:
17