29908 ALISAL CT FIRE20-0169 WILLOW TREE IIIliana Gutierrez
Subject: FIRE20-0169 TR31822 SPK FINAL LOT 13
Location: 29908 ALISAL CT
Start: Tue 6/16/2020 8:00 AM
End: Tue 6/16/2020 8:30 AM
Recurrence: (none)
Organizer: Menifee OFM
Rep. Name: ALFREDO Co. Name:
Phone#: 951-206-5781 Cell#:
ON GUARD
HYDRANT SYSTEM
PASS
FAIL
FIR LARM
PASS
FAIL
Thrust block pre -pour
Rough -wire ' pection
Underground rough
FunctiorqAt
Underground hydro
Duct ctors/velocity
Flush
. battery test
Final
rinkler monitoring
SPRINKLER U.G.
02
inal
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
10
Door fan test
Underground hydro
Ar
Abort test
Flush
Mechanical shutdown
Final
A
IF Jk
Detector test
Deluge/pre-action
FIRE SPRINKLER
OF
ft I&A
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro Ap
F
Installation
UG flush / OK to connect Ir
IL I
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
In -rack sprinklers
Primary piping
Secondary piping
Hose racks
Dispensers & shear valves
Final
X
Final
KITCHEN HOOD IEVINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test r
Hood/duct extinguishing
Gas/Electrical ut-off
High pile rack storage
Nozzle modffplacement
H.P. vents/access/corridors
Fire alar uEnnection
Tract access/hydrant verification
Final JF
Other:
SPRAY BOOTHS
KNOX SYSTEM
Ins ation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
1
Bernice Rivera
Subject: FIRE20-0169 TR31822-1 O/H ROUGH/HYDRO LOT 13
Location: 29908 ALISAL CT
Start: Mon 4/6/2020 2:00 PM
End: Mon 4/6/2020 2:30 PM
Recurrence: (none)
Organizer: Menifee OFM
Rep. Name: ALFREDO
Phone#: (951 206-5781 Cell#:
Co. Name
ON GUARD
CrossSt: WILLOW TREE II
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
A
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
I Finish Time: