Loading...
29884 ALISAL CT FIRE20-0167 WILLOW TREE IIIliana Gutierrez Subject: FIRE20-0167 TR31822 SPK FINAL LOT 11 Location: 29884 ALISAL CT Start: Tue 6/16/2020 8:00 AM End: Tue 6/16/2020 8:30 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: ALFREDO Phone#: 951-206-5781 Cel I#: Co. Name: ON GUARD CrossSt: WILLOW TREE II HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush F24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. _ Final Thrust block pre -pour _ SPECIAL SUPPRESSION Underground rough "oor fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection I ILL Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect odeRemoval Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection sysvfi Spray booths Function Tjff Hood/duct extinguishing Gas/Elec al shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: Bernice Rivera Subject: FIRE20-0167 TR31822-1 O/H ROUGH/HYDRO LOT 11 Location: 29894 ALISAL CT Start: Mon 4/6/2020 1:00 PM End: Mon 4/6/2020 1:30 PM Recurrence: (none) Organizer: Menifee OFM Rep. Name: ALFREDO Phone#: (951) 206-5781 Cell#: Co. Name: ON GUARD UFUSSJI: VVILLVVV I Mr-r- II HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I Finish Time: