Loading...
29879 ALISAL CT FIRE20-0172 WILLOW TREE IIIliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Rep. Name: ALFREDO FIRE20-0172 TR31822 SPK FINAL LOT 60 29879 ALISAL CT Tue 6/16/2020 8:30 AM Tue 6/16/2020 9:00 AM (none) Menifee OFM Phone#: 951-206-5781 Cell#: Co. Name: ON GUARD CrossSt: WILLOW TREE II HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire ins action Underground rough Function test Underground hydro Duct dete rs/velocity Flush 24 hr..iitery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test 1 Emergency shut off High pile storage Primary piping In -rack sprinklers a49 AF Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle madellpla 'merit H.P. vents/access/corridors Fire alarm conn ion Tract access/hydrant verification Final 14F Other: SFrRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: Bernice Rivera Subject: Location: Start: End: Recurrence: Organizer: Rep. Name: ALFREDO FIRE20-0172 TR31822-1 O/H ROUGH/HYDRO LOT 60 29879 ALISAL CT Mon 4/6/2020 12:30 PM Mon 4/6/2020 1:00 PM (none) Menifee OFM Phone#: (951) 206-5781 Cell#: Co. Name: ON GUARD CrossSt: WILLOW TREE II HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro i Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: