29639 VALANCE CT FIRE21-0268 HACIENDA(liana Gutierrez
Subject:
FIRE21-0268 TR31822 SPK FINAL LOT 90
Location:
29639 VALANCE CT
Start:
Thu 5/20/2021 9:30 AM
End:
Thu 5/20/2021 10:00 AM
Recurrence:
(none)
Organizer:
Menifee OFM
Call Handling Mode 2:
2
Rep. Name: JOE
Co. Name: NP MECHANICAL
Phone#: 951-595-5423
Cell#: CrossSt: HACIENDA
HYDRANT SYSTEM
PASS
FAIL
:FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -ire inspection
Underground rough
Func' n test
Underground hydro
Du detectors/velocitv
Flush
I 2X hr. battery test
Final
./sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
/
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
JFinal
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
to
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
I
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHIIyG
MISC. INSPECTION
Detections stem
Spray booths
Function Test i
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement 6
H.P. vents/access/corridors
Fire alarm connection =
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
I
I Finish Time:
5
Iliana Gutierrez
Subject: FIRE21-0268 TR31822 O/H ROUGH/HYDRO LOT 90
Location: 29639 VALANCE CT
Start: Mon 3/15/2021 12:00 PM
End: Mon 3/15/2021 12:30 PM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: JOE
Phone#: 951-595-5423
Cell#:
Co. Name: NP MECHANICAL
lilUbbOL. rl/1lrIMIN Lim
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extingui hing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
1