Loading...
24964 BENSON DR FIRE20-1317 HACIENDAIliana Gutierrez Subject: FIRE20-1317 TR31822 SPK FINAL LOT 29 Location: 24964 BENSON DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JOE Phone#: 951-595-5423 Fri 1/29/2021 8:00 AM Fri 1/29/2021 8:30 AM (none) Menifee OFM 2 Cell#: Co. Name: NP MECHANICAL LrosSbt: HAUIENDA HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground h dro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door -fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping .s UST/AST TANK Overhead hydro Installation UG flush / OK to connect Wf Removal Main drain/Inspect. Test s Emergency shut off High pile storage Primarypipin In-racksprinklers W, Secondary piping Hose racks Dispensers & shear valves X Final f Final KITCHEN HOOD EXTI + UISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model! â–ºcement H.P. vents/access/corridors Fire alarm c nection Tract access/h drant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Buildin Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 3 Iliana Gutierrez Subject: FIRE20-1317 TR31822 O/H ROUGH/HYDRO LOT 29 Location: 24964 BENSON DR Start: Tue 12/1/2020 10:00 AM End: Tue 12/1/2020 10:30 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: JOE Phone#: 951-595-5423 Cell#: Co. Name: NP MECHANICAL CrossSt: HACIENDA HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 15