Loading...
24928 BENSON DR FIRE20-1364 HACIENDAIliana Gutierrez Subject: FIRE20-1364 TR31822 SPK FINAL LOT 32 Location: 24928 BENSON DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JOE Phone#: 951-595-5423 Tue 2/9/2021 8:30 AM Tue 2/9/2021 9:00 AM (none) Steven Fox 2 Cell#: Co. Name: NP MECHANICAL GrOSSSt: HACIENDA HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour I Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/veloc' Flush 24 hr. battwy tes ' Final Sprinkler mon' 'rin SPRINKLER U.G. Final Thrust block re -pour SPIECIAL SUPPRESSION Underground rough Doo0an test Underground hydro Abort test Flush 'Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect 19 Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dis ensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shu6gff High pile rack storage Nozzle model/pgement H.P. vents/access/corridors Fire alarm cooffiection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extingui hing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 1 Iliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JOE Phone#: 951-595-5423 FIRE20-1364 TR31822 O/H ROUGH/HYDRO LOT 32 24928 BENSON DR Tue 12/1/2020 11:00 AM Tue 12/1/2020 11:30 AM (none) Menifee OFM 2 Cell#: Co. Name: NP MECHANICAL %_01 JL. nrlliI CIN V/1 HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rouqh-wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Sprav booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 21