2009/10/27 Riverside County Flood Control and Water Conservation District Paloma Washe Channel Stage 2 & 3124193_6 l-5 1 16 1 17 Is 19 70 21 1) 1) 23 24 25 ? 6 11 ?7 28 COOPERATIVE AGREEMENT Paloma Wash Channel, Stages 2 and 3 Paloma Wash — Haun Road Storm Drain Laterals (Project Nos. 4-0-00111-02, 4-0-00111-03 and 4-0-00097) (Parcel Map 34275) The RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, hereinafter called "DISTRICT", the CITY OF MENIFEE, I hereinafter called "CITY", STARK MENIFEE LAND LLC, a Wisconsin limited liability company, hereinafter called "STARK", DONAHUE SCHRIBER REALTY GROUP, L.P., a Delaware limited partnership, hereinafter called "DS REALTY", and DONAHUE SCHRIBER ASSET MANAGEMENT CORPORATION, a Delaware corporation, hereinafter called "DS I ASSET", hereby agree as follows: RECITALS A. STARK, DS REALTY and DS ASSET are hereinafter collectively referred to as "DEVELOPERS". DEVELOPERS have submitted for approval Parcel Map 34275 in the City of Menifee and as a condition for approval DEVELOPERS must construct certain flood control facilities in order to provide flood protection and drainage for DEVELOPERS' planned development; and B. The required flood control facilities include construction of (i) approximately 5,300 lineal feet of vegetated trapezoidal channel, hereinafter called "STAGE 2 CHANNEL", as shown in concept in red on Exhibit "A" attached hereto and made a part hereof, (ii) approximately 600 lineal feet of vegetated trapezoidal channel and approximately 290 lineal feet of rip -rapped trapezoidal channel, together hereinafter called "STAGE 3 CHANNEL", as shown in concept in purple on Exhibit "A", (iii) approximately 505 lineal feet of four -cell reinforced concrete box culvert and associated inlet, hereinafter called "CHANNEL BOX", as shown in concept in yellow on Exhibit "A", and (iv) storm drain laterals which connect to -1- 11.2 OCT 2 7 2009 124193_6 1 STAGE 2 CHANNEL, consisting of either underground storm drains greater than thirty-six 2 inches (36") in diameter or of reinforced concrete boxes, located within DISTRICT or CITY 3 held easements or rights of way, hereinafter called "LATERALS", as shown in concept in green 4 on Exhibit "A". Together, STAGE 2 CHANNEL, STAGE 3 CHANNEL, CHANNEL BOX and 5 LATERALS are hereinafter called "DISTRICT DRAINAGE FACILITIES". At its downstream 6 7 terminus, STAGE 3 CHANNEL connects to CHANNEL BOX, which then connects to STAGE 8 2 CHANNEL, which then connects to DISTRICT'S existing Paloma Wash Channel, as shown 9 in District Drawing No. 4-434; and 10 C. Associated with the construction of STAGE 2 CHANNEL is the 11 construction of (i) a box or arch culvert at the intersection of STAGE 2 CHANNEL with La 12 Piedra Road, hereinafter called "LA PIEDRA CULVERT", as shown in blue on Exhibit "A", 13 14 and (ii) the expansion and extension of an existing box culvert at the intersection of Newport 15 Road and STAGE 2 CHANNEL, hereinafter called "NEWPORT CULVERT", as shown in 16 concept in orange on Exhibit "A". Together, LA PIEDRA CULVERT and NEWPORT 17 CULVERT are hereinafter called "ROAD CULVERTS". In accordance with the existing 18 Memorandum of Understanding between CITY and DISTRICT, CITY is willing to accept 19 ownership and maintenance responsibility for the structural integrity of ROAD CULVERTS and 20 DISTRICT is willing to accept maintenance responsibility for keeping ROAD CULVERTS free 21 22 and clear of sediment and debris; and 23 D. Also associated with the construction of STAGE 2 CHANNEL is the 24 construction of certain catch basins, laterals and connector pipes located within both DISTRICT 25 and CITY held easements or rights of way, hereinafter called "APPURTENANCES". Also 26 associated with the construction of STAGE 3 CHANNEL is the construction of certain catch 27 basins, laterals and connector pipes located within both STAGE 3 CHANNEL right of way and 28 -2- 124193.6 1 CITY held easements or rights of way, hereinafter also included among "APPURTENANCES". 2 Those APPURTENANCES located within either STAGE 2 CHANNEL or STAGE 3 3 CHANNEL rights of way are included among DISTRICT DRAINAGE FACILITIES. 4 Together, ROAD CULVERTS and APPURTENANCES located within CITY held easements or 5 rights of way are hereinafter called "CITY DRAINAGE FACILITIES". Together, DISTRICT 6 7 DRAINAGE FACILITIES and CITY DRAINAGE FACILITIES are hereinafter called 8 "PROJECT"; and 9 E. Construction of PROJECT has commenced prior to execution of this 10 Agreement pursuant to the terms of two, separate Right of Entry and Inspection Agreements. 11 The first such agreement, hereinafter called "STAGE 2 INSPECTION AGREEMENT", was 12 executed January 2, 2008, between DISTRICT, DS REALTY, DS ASSET and SR 13 14 STRUCTURED LOT OPTIONS I LLC, a Delaware limited liability company and predecessor 15 in interest to STARK. The second such agreement, hereinafter called "STAGE 3 INSPECTION 16 AGREEMENT", was executed April 23, 2008, between DISTRICT, DS REALTY, DS ASSET 17 and SR STRUCTURED LOT OPTIONS I LLC; and 18 F. CITY was not officially established until October 1, 2008. Prior to that 19 date, certain responsibilities that would have been performed by CITY, had CITY been in 20 existence, were performed by either the COUNTY OF RIVERSIDE TRANSPORTATION 21 22 DEPARTMENT, hereinafter called "TRANSPORTATION", or the COUNTY OF RIVERSIDE 23 ECONOMIC DEVELOPMENT AGENCY, through its County Service Area No. 145, 24 hereinafter called "CSA 145"; and 25 G. DEVELOPERS and CITY desire DISTRICT to accept ownership and 26 responsibility for the operation and maintenance of DISTRICT DRAINAGE FACILITIES. 27 28 -3- 124193_6 1 Therefore, DISTRICT must review and approve DEVELOPERS' plans and specifications and 2 subsequently inspect the construction of DISTRICT DRAINAGE FACILITIES; and 3 H. DEVELOPERS and DISTRICT desire CITY to accept ownership and 4 responsibility for the operation and maintenance of CITY DRAINAGE FACILITIES. 5 Therefore, TRANSPORTATION, acting prior to establishment of CITY, must review and 6 7 approve DEVELOPERS' plans and specifications and subsequently inspect the construction of 8 APPURTENANCES; and 9 I. DEVELOPERS wish to construct STAGE 2 CHANNEL as a "green -belt" 10 facility that will accommodate passive public recreation activities within DISTRICT'S future 11 STAGE 2 CHANNEL right of way. DISTRICT is willing to allow public access and use of said 12 right of way for non -motorized recreation purposes provided CITY is willing to (i) accept 13 14 certain maintenance responsibilities within DISTRICT'S STAGE 2 CHANNEL right of way as 15 set forth herein, and (ii) indemnify and hold DISTRICT harmless from any claims arising from 16 public's use of DISTRICT'S future STAGE 2 CHANNEL right of way; and 17 J. DEVELOPERS and DISTRICT desire CITY to accept responsibility for 18 performing "routine" day to day maintenance activities within STAGE 2 CHANNEL right of 19 way. Therefore CSA 145, acting prior to establishment of CITY, must review and approve 20 DEVELOPERS' plans and specifications for STAGE 2 CHANNEL; and 21 22 K. DISTRICT is willing to (i) review and approve DEVELOPERS' plans and 23 specifications for PROJECT, (ii) inspect the construction of DISTRICT DRAINAGE 24 FACILITIES, (iii) accept ownership and responsibility for the operation and maintenance of 25 DISTRICT DRAINAGE FACILITIES, (iv) accept responsibility for keeping ROAD 26 CULVERTS free and clear of sediment and debris, and (v) grant CITY the right to inspect, 27 operate and maintain those p portions of ROAD CULVERTS located within DISTRICT'S 28 -4- 124193_6 1 STAGE 2 CHANNEL right of way, provided DEVELOPERS (i) comply with this Agreement, 2 (ii) pay DISTRICT the amounts specified herein to cover DISTRICT'S plan review and 3 construction inspection costs, (iii) construct PROJECT in accordance with plans and 4 specifications approved by DISTRICT and CITY and/or TRANSPORTATION and CSA 145, 5 6 acting prior to establishment of CITY, (iv) obtain all necessary permits, regulatory permits, 7 licenses and rights of entry as set forth herein, (v) accept ownership and responsibility for the 8 operation and maintenance of PROJECT following completion of PROJECT construction until 9 such time as DISTRICT accepts ownership and responsibility for the operation and maintenance 10 of DISTRICT DRAINAGE FACILITIES, CITY accepts ownership and responsibility for the 11 operation and maintenance of CITY DRAINAGE FACILITIES and CITY also accepts 12 responsibility for routine day to day maintenance of STAGE 2 CHANNEL and for maintenance 13 14 of any recreational amenities located within DISTRICT'S STAGE 2 CHANNEL right of way, 15 and (vi) obtain and convey to DISTRICT the necessary rights of way for the inspection, 16 operation and maintenance of DISTRICT DRAINAGE FACILITIES as set forth herein; and 17 L. DISTRICT is further willing to accept responsibility for keeping ROAD 18 CULVERTS free and clear of sediment and debris provided CITY accepts responsibility for the 19 ownership and structural integrity of ROAD CULVERTS; and 20 21 M. CITY is willing to (i) review and approve plans and specifications prepared 22 by DEVELOPERS for PROJECT, or accept plans and specifications previously reviewed and 23 approved by TRANSPORTATION acting prior to establishment of CITY, (ii) inspect the 24 construction of CITY DRAINAGE FACILITIES, or accept TRANSPORTATION'S inspection 25 thereof acting prior to the establishment of CITY as though performed by CITY, (iii) consent to 26 TRANSPORTATION'S acceptance and holding of faithful performance and payment bonds 27 submitted by DEVELOPERS for PROJECT, (iv) grant DISTRICT the right to inspect, operate 28 -5- 124193_6 1 and maintain DISTRICT DRAINAGE FACILITIES within CITY rights of way, (v) grant 2 DISTRICT the necessary rights to remove sediment and debris from ROAD CULVERTS, (vi) 3 consent to the recordation and conveyance of Irrevocable Offer(s) of Dedication furnished by 4 DEVELOPERS as provided herein, and (vii) accept ownership and responsibility for the 5 operation and maintenance of CITY DRAINAGE FACILITIES, provided PROJECT is 6 7 constructed in accordance with plans and specifications approved by DISTRICT and CITY, 8 and/or TRANSPORTATION and CSA 145 acting prior to establishment of CITY; and 9 N. CITY is willing to (i) review and approve DEVELOPERS plans and 10 specifications for STAGE 2 CHANNEL, or accept plans and specifications previously reviewed 11 and approved by CSA 145 acting prior to establishment of CITY, (ii) accept responsibility for 12 the performance of routine maintenance of STAGE 2 CHANNEL, (iii) accept sole responsibility 13 14 for the operation and maintenance of STAGE 2 CHANNEL'S public access and recreational 15 amenities provided STAGE 2 CHANNEL is constructed in accordance with plans and 16 specifications approved by DISTRICT and CITY, and/or TRANSPORTATION and CSA 145 17 acting prior to establishment of CITY, and (iv) indemnify and hold DISTRICT harmless from 18 any claims arising from public's use of the proposed STAGE 2 CHANNEL right of way as set 19 forth herein. 20 NOW, THEREFORE, the parties hereto mutually agree as follows: 21 SECTION I 22 23 DEVELOPERS shall: 24 1. Prepare PROJECT plans and specifications, as shown on District Drawing 25 Nos. 4-967, 4-973 and 4-983, hereinafter called "IMPROVEMENT PLANS", in accordance 26 with DISTRICT and CITY, and/or TRANSPORTATION and CSA 145 acting prior to 27 establishment of CITY, standards, and submit to DISTRICT and CITY, and/or 28 -6- 124193_6 1 TRANSPORTATION and CSA 145 acting prior to establishment of CITY, for their review and 2 approval. 3 2. Continue to pay DISTRICT, within thirty (30) days after receipt of periodic 4 billings from DISTRICT, any and all such amounts as are deemed reasonably necessary by 5 DISTRICT to cover DISTRICT'S costs associated with the review of IMPROVEMENT 6 7 PLANS, review and approval of right of way and conveyance documents, and with the 8 processing and administration of this Agreement. 9 3. Deposit with DISTRICT (Attention: Business Office — Accounts 10 Receivable), at the time of providing written notice to DISTRICT of the start of DISTRICT 11 DRAINAGE FACILITIES construction as set forth in Section I.B. herein, the estimated cost of 12 providing construction inspection for DISTRICT DRAINAGE FACILITIES, in an amount as 13 determined and approved by DISTRICT in accordance with Ordinance Nos. 671 and 749 of the 14 15 County of Riverside, including any amendments thereto, based upon the bonded value of 16 DISTRICT DRAINAGE FACILITIES. 17 4. [This Section Intentionally Left Blank.] 18 5. Secure, at their sole cost and expense, all necessary licenses, agreements, 19 permits and rights of entry as may be needed for the construction, inspection, operation and 20 maintenance of DISTRICT DRAINAGE FACILITIES. DEVELOPERS shall furnish 21 22 DISTRICT, at the time of providing written notice to DISTRICT of the start of construction as 23 set forth in Section I.B., with sufficient evidence of DEVELOPERS having secured such 24 necessary licenses, agreements, permits and rights of entry, as determined and approved by 25 DISTRICT. 26 6. Furnish DISTRICT with copies of all permits, approvals or agreements 27 required by any Federal or State resource and/or regulatory agency for the construction, 28 -7- 124193_6 1 operation and maintenance of DISTRICT DRAINAGE FACILITIES. Such documents include 2 but are not limited to those issued by the U.S. Army Corps of Engineers, California Regional 3 Water Quality Control Board, California State Department of Fish and Game and State Water 4 Resources Control Board. 5 6 7. Provide TRANSPORTATION, acting prior to establishment of CITY, at 7 the time of providing written notice to DISTRICT of the start of construction as set forth in 8 Section I.B., with faithful performance and payment bonds, each in the amount of 100% of the 9 estimated cost for construction of DISTRICT DRAINAGE FACILITIES as determined by 10 DISTRICT. The surety, amount and form of the bonds shall be subject to the approval of 11 DISTRICT and TRANSPORTATION, acting prior to establishment of CITY. The bonds shall 12 remain in full force and effect until DISTRICT DRAINAGE FACILITIES are accepted by 13 14 DISTRICT as complete; at which time the bond amount may be reduced to 10% for a period of 15 one year to guarantee against any defective work, labor or materials. 16 8. Notify DISTRICT in writing (Attention: Administrative Services Section), 17 at least twenty (20) days prior to the start of construction of DISTRICT DRAINAGE 18 FACILITIES. Construction shall not begin on any element of DISTRICT DRAINAGE 19 FACILITIES, for any reason whatsoever, until DISTRICT has issued to DEVELOPERS a 20 written Notice to Proceed authorizing DEVELOPERS to commence construction of DISTRICT 21 DRAINAGE FACILITIES. 22 23 9. Grant DISTRICT, by execution of this Agreement, the right to enter upon 24 DEVELOPERS' property where necessary and convenient for the purpose of gaining access to, 25 and performing inspection service for, the construction of DISTRICT DRAINAGE 26 FACILITIES as set forth herein. 27 28 -8- 124193_6 1 10. Obtain and provide DISTRICT, at the time of providing written notice to 2 DISTRICT of the start of construction of DISTRICT DRAINAGE FACILITIES as set forth in 3 Section 1.8., with duly executed Irrevocable Offers(s) of Dedication to the public for flood 4 control and drainage purposes, including g p � g ingress and egress, for the rights of way deemed 5 6 necessary by DISTRICT for the construction, inspection, operation and maintenance of 7 DISTRICT DRAINAGE FACILITIES, as shown in concept cross -hatched in blue, green, purple 8 or red on Exhibit "B" attached hereto and made a part hereof. The Irrevocable Offer(s) of 9 Dedication shall be in a form approved by DISTRICT and shall be executed by all legal and 10 equitable owners of the property described in the offer(s). 11 11. Furnish DISTRICT, when submitting the Irrevocable Offer(s) of 12 Dedication as set forth in Section 1.10., with Preliminary Reports on Title dated not more than 13 14 thirty (30) days prior to date of submission of all the property described in the Irrevocable 15 Offer(s) of Dedication. 16 12. Furnish DISTRICT, at the time of providing written notice to DISTRICT of 17 the start of construction as set forth in Section 1.8., with a complete list of all contractors and 18 subcontractors to be performing work on DISTRICT DRAINAGE FACILITIES, including the 19 corresponding license number and license classification of each. At such time, DEVELOPERS 20 shall further identify in writing their designated superintendent for DISTRICT DRAINAGE 21 FACILITIES construction. 22 23 13. Furnish DISTRICT, at the time of providing written notice to DISTRICT of 24 the start of construction as set forth in Section 1.8., a construction schedule which shall show the 25 order and dates in which the DEVELOPERS or DEVELOPERS' contractor proposes to carry on 26 the various parts of work, including estimated start and completion dates. As construction of 27 28 -9- 1241936 1 DISTRICT DRAINAGE FACILITIES progresses, DEVELOPERS shall update said 2 construction schedule as requested by DISTRICT. 3 14. Furnish DISTRICT with final mylar IMPROVEMENT PLANS and assign 4 their ownership to DISTRICT at the time DISTRICT approves and signs said final mylar 5 IMPROVEMENT PLANS, and prior to the start of DISTRICT DRAINAGE FACILITIES 6 construction. 7 8 15. Not permit any change to or modification of the IMPROVEMENT PLANS 9 without the prior written permission and consent of DISTRICT. 10 16. Comply with all Cal/OSHA safety regulations including regulations 11 concerning confined space and maintain a safe working environment for DEVELOPERS and 12 DISTRICT employees on the site. 13 14 17. Furnish DISTRICT, at the time of providing written notice to DISTRICT of 15 the start of construction as set forth in Section 1.8., a confined space entry procedure specific to 16 DISTRICT DRAINAGE FACILITIES. The procedure shall comply with requirements 17 contained in California Code of Regulations, Title 8 Section 5158, Other Confined Space 18 Operations, Section 5157, Permit Required Confined Space and DISTRICT Confined Space 19 procedures, SOM-18. The procedure shall be reviewed and approved by DISTRICT prior to the 20 issuance of a Notice to Proceed. 21 22 18. During the construction period of DISTRICT DRAINAGE FACILITIES, 23 provide Workers' Compensation Insurance in an amount required by law. A certificate of said 24 insurance policy shall be provided to DISTRICT and CITY, and/or TRANSPORTATION and 25 CSA 145 acting prior to establishment of CITY, at the time of providing written notice pursuant 26 to Section I.B. 27 28 -10- 124193_6 1 19. Commencing on the date notice is given pursuant to Section I.B. and 2 continuing until DISTRICT accepts DISTRICT DRAINAGE FACILITIES for operation and 3 maintenance: 4 (a) Provide and maintain or cause their contractor(s) to provide and 5 maintain comprehensive liability insurance coverage which shall 6 7 protect DEVELOPERS from claim from damages for personal 8 injury, including accidental and wrongful death, as well as from 9 claims for property damage which may arise from DEVELOPERS' 10 construction of PROJECT or the performance of their obligations 11 hereunder, whether such construction or performance be by 12 DEVELOPERS, by any of their contractors, subcontractors, or by 13 14 anyone employed directly or indirectly by any of them. Such 15 insurance shall name DISTRICT, the County of Riverside and CITY 16 as additional insureds with respect to this Agreement and the 17 obligations of DEVELOPERS hereunder. Such insurance shall 18 provide for limits of not less than two million dollars ($2,000,000) 19 per occurrence. 20 (b) Cause their insurance carrier(s) or their contractor's insurance 21 22 carrier(s), who shall be authorized by the California Department of 23 Insurance to transact the business of insurance in the State of 24 California, to furnish DISTRICT and CITY, and/or 25 TRANSPORTATION and CSA 145 acting prior to establishment of 26 CITY, at the time of providing written notice to DISTRICT of the 27 start of construction as set forth in Section I.B., with certificate(s) of 28 -11- 1241936 1 insurance and applicable policy endorsements showing that such 2 insurance is in full force and effect and that DISTRICT, the County 3 of Riverside and CITY are named as additional insureds with respect 4 to this Agreement and the obligations of DEVELOPERS hereunder. 5 6 Further, said certificate(s) shall state that the issuing company shall 7 give DISTRICT and CITY, and/or TRANSPORTATION and CSA 8 145 acting prior to establishment of CITY, sixty (60) days written 9 notice in the event of any cancellation, termination, non -renewal or 10 reduction in coverage of the policies evidenced by the certificate(s). 11 In the event of any such cancellation, termination, non -renewal or 12 reduction in coverage, DEVELOPERS shall, forthwith, secure 13 14 replacement insurance meeting the provisions of this paragraph. 15 Failure to maintain the insurance required by this paragraph shall be 16 deemed a material breach of this Agreement and shall authorize and constitute authority for 17 DISTRICT, at its sole discretion, to proceed to perform the remaining work pursuant to Section 18 V.3. 19 20. Construct, or cause to be constructed, PROJECT at DEVELOPERS' sole 20 cost and expense in accordance with DISTRICT and CITY, and/or TRANSPORTATION and 21 22 CSA 145 acting prior to establishment of CITY, approved IMPROVEMENT PLANS. 23 21. Within two (2) weeks of completing PROJECT construction, provide 24 DISTRICT with written notice (Attention: Contract Administration Section) that PROJECT 25 construction is substantially complete and requesting that DISTRICT conduct a final inspection 26 of DISTRICT DRAINAGE FACILITIES. 27 28 -12- 124193_6 1 22. Upon completion of PROJECT construction, and upon acceptance by CITY 2 of all street rights of way deemed necessary by DISTRICT and CITY for the operation and 3 maintenance of PROJECT, but prior to DISTRICT acceptance of DISTRICT DRAINAGE 4 FACILITIES for ownership, operation and maintenance, convey or cause to be conveyed to 5 DISTRICT (i) flood control easement(s), including ingress and egress, in a form approved by 6 7 DISTRICT, for the rights of way as shown in concept cross -hatched in green and in red on 8 Exhibit "B", (ii) ingress and egress easement(s), in a form approved by DISTRICT, for the 9 rights of way as shown in concept cross -hatched in purple on Exhibit "B", and (iii) fee simple 10 title, in a form approved by DISTRICT, for the rights of way as shown in concept cross -hatched 11 in blue on Exhibit "B". 12 23. At the time of recordation of the conveyance document(s) as set forth in 13 14 Sections I.22.(i) and I.22.(ii), furnish DISTRICT with policies of title insurance, each in the 15 amount of not less than fifty percent (50%) of the estimated fee value, as determined by 16 DISTRICT, for each easement parcel to be conveyed to DISTRICT, guaranteeing DISTRICT'S 17 interest in said property as being free and clear of all liens, encumbrances, assessments, 18 easements, taxes and leases (recorded or unrecorded), except those which, in the sole discretion 19 of DISTRICT, are deemed acceptable. 20 24. At the time of recordation of the conveyance document(s) as set forth in 21 22 Section I.22.(iii), furnish DISTRICT with policies of title insurance, each in the amount of not 23 less than one hundred percent (100%) of the estimated fee value, as determined by DISTRICT, 24 for each fee parcel to be conveyed to DISTRICT, guaranteeing DISTRICT'S interest in said 25 property as being free and clear of all liens, encumbrances, assessments, easements, taxes and 26 leases (recorded or unrecorded), except those which, in the sole discretion of DISTRICT, are 27 deemed acceptable. 28 -13- 124193_6 1 25. Accept ownership and sole responsibility for the operation and maintenance 2 of PROJECT until such time as (i) DISTRICT accepts ownership and responsibility for 3 operation and maintenance of DISTRICT DRAINAGE FACILITIES, and (ii) CITY accepts 4 ownership and responsibility for operation and maintenance of CITY DRAINAGE 5 FACILITIES and also accepts responsibility for the operation and maintenance of STAGE 2 6 7 CHANNEL'S public access and recreational amenities. Further, it is mutually understood by the 8 parties hereto that prior to DISTRICT acceptance of ownership and responsibility for the 9 operation and maintenance of DISTRICT DRAINAGE FACILITIES, PROJECT shall be in a 10 satisfactorily maintained condition as solely determined by DISTRICT. 11 26. Pay, if suit is brought upon this Agreement or any bond guaranteeing the 12 completion of DISTRICT DRAINAGE FACILITIES, all costs and reasonable expenses and 13 14 fees, including reasonable attorneys' fees, and acknowledge that, upon entry of judgment, all 15 such costs, expenses and fees shall be computed as costs and included in any judgment 16 rendered. 17 27. Upon completion of construction of PROJECT, but prior to DISTRICT 18 acceptance of DISTRICT DRAINAGE FACILITIES for ownership, operation and maintenance, 19 DEVELOPERS' civil engineer of record or construction civil engineer of record, duly registered 20 in the State of California, shall provide DISTRICT a redlined "as -built" copy of 21 22 IMPROVEMENT PLANS. After DISTRICT approval of the redlined "as -built" drawings, 23 DEVELOPERS' engineer shall schedule with DISTRICT a time to transfer the redlined changes 24 onto DISTRICT'S original mylars at DISTRICT'S office, after which the engineer shall review, 25 stamp and sign the original IMPROVEMENT PLANS "AS -BUILT". 26 28. Ensure that all work performed pursuant to this Agreement by 27 DEVELOPERS, their agents or contractors is done in accordance with all applicable laws and 28 -14- 124193_6 1 regulations, including but not limited to all applicable provisions of the Labor Code, Business 2 and Professions Code, and Water Code. DEVELOPERS shall be solely responsible for all costs 3 associated with compliance with applicable laws and regulations. 4 SECTION II 5 DISTRICT shall: 6 7 1. Review and approve IMPROVEMENT PLANS prior to the start of 8 DISTRICT DRAINAGE FACILITIES construction. 9 2. Provide CITY, and/or TRANSPORTATION and CSA 145 acting prior to 10 establishment of CITY, an opportunity to review and approve IMPROVEMENT PLANS prior 11 to DISTRICT'S final approval. 12 3. Upon execution of this Agreement, record or cause to be recorded, a copy 13 of this Agreement in the Official Records of the Riverside County Recorder. 14 15 4. Record or cause to be recorded, the Irrevocable Offer(s) of Dedication 16 provided by DEVELOPERS pursuant to Section I.10. 17 5. Inspect DISTRICT DRAINAGE FACILITIES construction. 18 6. Keep an accurate accounting of all DISTRICT costs associated with the 19 review and approval of IMPROVEMENT PLANS, the review and approval of right of way and 20 conveyance documents and the processing and administration of this Agreement. 21 22 7. Keep an accurate accounting of all DISTRICT construction inspection 23 costs, and within forty-five (45) days after DISTRICT acceptance of DISTRICT DRAINAGE 24 FACILITIES as being complete, submit a final cost statement to DEVELOPERS. If the deposit, 25 as set forth in Section 1.3. exceeds such costs, DISTRICT shall reimburse DEVELOPERS the 26 excess amount within sixty (60) days after DISTRICT acceptance of DISTRICT DRAINAGE 27 FACILITIES as being complete. If at any time the costs exceed the deposit or are anticipated 28 -15- 1241936 1 by DISTRICT to exceed the deposit, DEVELOPERS shall pay such additional amount(s), as 2 deemed reasonably necessary by DISTRICT to complete inspection of DISTRICT DRAINAGE 3 FACILITIES, within thirty (30) days after receipt of billing from DISTRICT. 4 8. Accept ownership and sole responsibility for the operation and maintenance 5 6 of DISTRICT DRAINAGE FACILITIES upon (i) DISTRICT acceptance of PROJECT 7 construction as being complete, (ii) recordation of all conveyance documents described in 8 Section I.22., and (iii) acceptance by CITY of all necessary street rights of way as deemed 9 necessary by DISTRICT and CITY for the operation and maintenance of PROJECT. 10 9. Upon acceptance by CITY of ROAD CULVERTS for ownership, operation 11 and maintenance, accept sole responsibility for keeping ROAD CULVERTS free and clear of 12 sediment and debris. 13 14 10. Grant CITY, by execution of this Agreement, the right to construct, inspect, 15 operate and maintain structural integrity of portions of ROAD CULVERTS located within 16 DISTRICT'S STAGE 2 CHANNEL right of way. 17 11. Grant CITY, by execution of this Agreement, the necessary rights to enter 18 upon DISTRICT'S STAGE 2 CHANNEL right of way for the purpose of performing its 19 maintenance responsibilities as set forth herein. 20 12. Accept sole responsibility for maintaining STAGE 2 CHANNEL'S line, 21 22 grade and appurtenant structures such that STAGE 2 CHANNEL functions as a flood control 23 facility at its design level. 24 13. Provide CITY with reproducible duplicate copies of "as -built" 25 IMPROVEMENT PLANS upon DISTRICT acceptance of DISTRICT DRAINAGE 26 FACILITIES as being complete. 27 SECTION III 28 -16- 124193_6 1 CITY, and/or TRANSPORTATION acting prior to establishment of CITY, shall: 2 1. Review and approve IMPROVEMENT PLANS prior to the start of 3 PROJECT construction. 4 2. Accept the TRANSPORTATION, acting prior to establishment of CITY, 5 and DISTRICT approved faithful performance and payment bonds submitted by 6 7 DEVELOPERS as set forth in Section I.7., and hold said bonds as provided herein. 8 3. Inspect construction of CITY DRAINAGE FACILITIES. 9 4. Consent, by execution of this Agreement, to the recording of any 10 Irrevocable Offer(s) of Dedication furnished by DEVELOPERS pursuant to this Agreement. 11 5. As requested by DISTRICT, accept the Irrevocable Offer(s) of Dedication 12 as set forth herein, and any other outstanding offers of dedication necessary for the construction, 13 14 inspection, operation and maintenance of DISTRICT DRAINAGE FACILITIES, and convey 15 sufficient rights of way to DISTRICT to allow DISTRICT to construct, inspect, operate and 16 maintain DISTRICT DRAINAGE FACILITIES. 17 6. Grant DISTRICT, by execution of this Agreement, (i) the right to construct, 18 inspect, operate and maintain DISTRICT DRAINAGE FACILITIES within CITY rights of way, 19 and (ii) the necessary rights to keep ROAD CULVERTS free and clear of sediment and debris. 20 7. Accept ownership and sole responsibility for the operation and maintenance 21 22 of APPURTENANCES upon completion of construction and DISTRICT acceptance of 23 DISTRICT DRAINAGE FACILITIES as being complete. 24 8. Upon CITY acceptance of ROAD CULVERTS construction as being 25 complete, accept ownership and responsibility for the structural integrity of ROAD 26 CULVERTS. 27 SECTION IV 28 -17- 124193__6 1 CITY, and/or CSA 145 acting prior to establishment of CITY, shall: 2 1. Review and approve IMPROVEMENT PLANS for STAGE 2 CHANNEL 3 prior to the start of PROJECT construction. 4 2. Inspect construction of STAGE 2 CHANNEL. 5 3. Upon DISTRICT acceptance of STAGE 2 CHANNEL for ownership, 6 7 operation and maintenance, accept sole responsibility for routine day to day maintenance of 8 STAGE 2 CHANNEL including but not limited to, removal of trash and debris, performing 9 graffiti removal and vegetation control including any necessary mowing, cutting and weed 10 abatement associated therewith. 11 4. Upon DISTRICT acceptance of STAGE 2 CHANNEL for ownership, 12 operation and maintenance, accept sole responsibility for maintenance of any recreational 13 14 amenities located within DISTRICT'S STAGE 2 CHANNEL right of way including, but not 15 limited to, repairing and/or replacing pathways, access roads, irrigation works, landscape 16 maintenance and the routine removal of accumulated litter, trash and debris associated with 17 public's use of STAGE 2 CHANNEL right of way. 18 5. Not cause any change to or modification within DISTRICT'S STAGE 2 19 CHANNEL right of way without obtaining the prior written permission and consent of 20 DISTRICT. 21 22 6. Cease any interfering use within DISTRICT'S STAGE 2 CHANNEL right 23 of way upon receipt of a written notification from DISTRICT in the event DISTRICT'S General 24 Manager -Chief Engineer determines that such use of DISTRICT'S STAGE 2 CHANNEL right 25 of way in any way interferes with STAGE 2 CHANNEL primary purpose and function. 26 27 28 -18- 124193_6 1 7. Recognize that STAGE 2 CHANNEL is an active watercourse and, hence, 2 DISTRICT'S STAGE 2 CHANNEL right of way will be subject to periodic flooding, flood 3 hazards and possible flood damage. 4 8. Assume all liability in conjunction with the public's use of DISTRICT'S 5 6 STAGE 2 CHANNEL right of way including claims of third persons for injury or death or 7 damage to property. Said obligation shall not include any inverse condemnation liability of 8 CITY by reason of location of STAGE 2 CHANNEL or DISTRICT'S improvements thereto 9 unless such liability is the result of public's use of the property pursuant to CITY'S actual or 10 tacit consent. 11 9. Upon DISTRICT acceptance of STAGE 2 CHANNEL for ownership, 12 operation and maintenance, accept sole responsibility for providing public security and safety in 13 14 conjunction with the public's use of DISTRICT'S STAGE 2 CHANNEL right of way. 15 10. Ensure the safety of all persons who may use DISTRICT'S STAGE 2 16 CHANNEL right of way by conducting regular safety inspections and promptly repairing any 17 damage to DISTRICT'S STAGE 2 CHANNEL right of way that may be necessary to ensure the 18 safety of the public. 19 11. Repair any damage to DISTRICT'S STAGE 2 CHANNEL right of way 20 resulting from CITY'S or the public's use thereof. 21 22 SECTION V 23 It is further mutually agreed: 24 1. All work involved with DISTRICT DRAINAGE FACILITIES shall be 25 inspected by DISTRICT and shall not be deemed complete until approved and accepted in 26 writing as complete by DISTRICT. 27 28 -19- 124193. 6 1 2. CITY, and/or TRANSPORTATION acting prior to establishment of CITY, 2 and DEVELOPERS personnel may observe and inspect all work being done on DISTRICT 3 DRAINAGE FACILITIES but shall provide any comments to DISTRICT personnel who shall 4 be solely responsible for all quality control communications with the DEVELOPERS' 5 contractor(s) during the construction of DISTRICT DRAINAGE FACILITIES. CITY, and/or 6 7 CSA 145 acting prior to the establishment of CITY, personnel may observe and inspect all work 8 being done on STAGE 2 CHANNEL, but shall provide any comments to DISTRICT personnel 9 who shall be solely responsible for all quality control communications with the DEVELOPERS' 10 contractor(s) during the construction of STAGE 2 CHANNEL. 11 3. DEVELOPERS shall complete construction of DISTRICT DRAINAGE 12 FACILITIES within twelve (12) consecutive months after execution of this Agreement and 13 14 within one hundred eighty (180) consecutive calendar days after commencing work on 15 DISTRICT DRAINAGE FACILITIES. It is expressly understood that since time is of the 16 essence in this Agreement, failure of DEVELOPERS to perform the work within the agreed 17 upon time shall constitute authority for DISTRICT to perform the remaining work and require 18 DEVELOPERS' surety to pay to CITY and/or TRANSPORTATION the penal sum of any and 19 all bonds. In which case, CITY and/or TRANSPORTATION shall subsequently reimburse 20 DISTRICT for DISTRICT costs incurred. 21 22 4. DEVELOPERS shall not request DISTRICT to accept any portion or 23 portions of DISTRICT DRAINAGE FACILITIES or CITY to accept any portion or portions of 24 CITY DRAINAGE FACILITIES or CITY to accept any portion of recreational amenities for 25 ownership, operation and maintenance prior to the completion of PROJECT construction. 26 5. DISTRICT shall endeavor to issue DEVELOPERS a Notice to Proceed 27 within twenty (20) days of receipt of DEVELOPERS' complete written notice as set forth in 28 -20- 124193 6 1 Section I.B.; however, DISTRICT'S construction inspection staff is limited and, therefore, the 2 issuance of a Notice to Proceed is subject to staff availability. 3 In the event DEVELOPERS wish to expedite issuance of a Notice to 4 Proceed, DEVELOPERS may elect to furnish an independent qualified construction inspector at 5 DEVELOPERS' sole cost and expense. DEVELOPERS shall furnish appropriate 6 7 documentation of the individual's credentials and experience to DISTRICT for review and, if 8 appropriate, approval. DISTRICT shall review the individual's qualifications and experience 9 and, upon approval thereof, said individual, hereinafter called "DEPUTY INSPECTOR", shall 10 be authorized to act on DISTRICT'S behalf on all DISTRICT DRAINAGE FACILITIES 11 construction and quality control matters. If DEVELOPERS' initial construction inspection 12 deposit furnished pursuant to Section 1.3. exceeds ten thousand dollars ($10,000.00), DISTRICT 13 14 shall refund to DEVELOPERS up to eighty percent (80%) of DEVELOPERS' initial inspection 15 deposit within forty-five (45) days of DISTRICT'S approval of DEPUTY INSPECTOR; 16 however, a minimum balance of ten thousand dollars ($10,000.00) shall be retained on account. 17 6. DISTRICT DRAINAGE FACILITIES construction work shall be on a five 18 (5) day, forty (40) hour work week with no work on Saturdays, Sundays or DISTRICT 19 designated legal holidays, unless otherwise approved in writing by DISTRICT. If 20 DEVELOPERS feel it is necessary to work more than the normal forty (40) hour work week or 21 22 on holidays, DEVELOPERS shall make a written request for permission from DISTRICT to 23 work the additional hours. The request shall be submitted to DISTRICT at least seventy-two 24 (72) hours prior to the requested additional work hours and state the reasons for the overtime 25 and the specific time frames required. The decision of granting permission for overtime work 26 shall be made by DISTRICT at its sole discretion and shall be final. If permission is granted by 27 DISTRICT, DEVELOPERS will be charged the cost incurred at the overtime rates for 28 -21- 124193_6 1 additional inspection time required in connection with the overtime work in accordance with 2 Ordinance Nos. 671 and 749, including any amendments thereto, of the County of Riverside. 3 7. DEVELOPERS shall indemnify and hold harmless DISTRICT, the County 4 of Riverside and CITY (including their agencies, districts, special districts and departments, 5 their respective directors, officers, Board of Supervisors, elected and appointed officials, 6 7 employees, agents and representatives) from any liability, claim, damage, proceeding or action, 8 present or future, based upon, arising out of or in any way relating to DEVELOPERS' 9 (including their officers, employees, subcontractors and agents) actual or alleged acts or 10 omissions related to this Agreement, performance under this Agreement, or failure to comply 11 with the requirements of this Agreement, including but not limited to: (a) property damage; (b) 12 bodily injury or death; (c) liability or damage pursuant to Article I, Section 19 of the California 13 Constitution, the Fifth Amendment of the United States Constitution or any other law, ordinance 14 15 or regulation caused by the diversion of waters from the natural drainage patterns or the 16 discharge of drainage within or from PROJECT; or (d) any other element of any kind or nature 17 whatsoever. 18 DEVELOPERS shall defend, at their sole expense, including all costs and 19 fees (including but not limited to attorney fees, cost of investigation, defense and settlements or 20 awards), DISTRICT, the County of Riverside and CITY (including their agencies, districts, 21 22 special districts and departments, their respective directors, officers, Board of Supervisors, 23 elected and appointed officials, employees, agents and representatives) in any claim, proceeding 24 or action for which indemnification is required. 25 With respect to any of DEVELOPERS' indemnification requirements, 26 DEVELOPERS shall, at their sole cost, have the right to use counsel of their own choice and 27 shall have the right to adjust, settle, or compromise any such claim, proceeding or action 28 -22- 124193_6 1 without the prior consent of DISTRICT or the County of Riverside or CITY; provided, 2 however, that any such adjustment, settlement or compromise in no manner whatsoever limits or 3 circumscribes DEVELOPERS' indemnification obligations to DISTRICT or the County of 4 Riverside or CITY. 5 DEVELOPERS' indemnification obligations shall be satisfied when 6 7 DEVELOPERS have provided to DISTRICT or the County of Riverside or CITY the 8 appropriate form of dismissal (or equivalent document) relieving DISTRICT or the County of 9 Riverside or CITY from any liability for the claim, proceeding or action involved. 10 The specified insurance limits required in this Agreement shall in no way 11 limit or circumscribe DEVELOPERS' obligations to indemnify and hold harmless DISTRICT or 12 the County of Riverside or CITY from third party claims. 13 In the event there is conflict between this section and California Civil Code 14 15 Section 2782, this section shall be interpreted to comply with Civil Code Section 2782. Such 16 interpretation shall not relieve the DEVELOPERS from indemnifying DISTRICT or the County 17 of Riverside or CITY to the fullest extent allowed by law. 18 8. Any waiver by DISTRICT or CITY of any breach of any one or more of 19 the terms of this Agreement shall not be construed to be a waiver of any subsequent or other 20 breach of the same or of any other term hereof. Failure on the part of DISTRICT or CITY to 21 22 require exact, full and complete compliance with any terms of this Agreement shall not be 23 construed as in any manner changing the terms hereof, or estopping DISTRICT or CITY from 24 enforcement hereof. 25 9. DISTRICT and CITY each pledge to cooperate in regard to the operation 26 and maintenance of their respective facilities as set forth herein and to discharge their respective 27 28 -23- 124193_6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 maintenance responsibilities in an expeditious fashion so as to avoid the creation of any nuisance condition or undue maintenance impact upon the others' facilities. 10. This Agreement is to be construed in accordance with the laws of the State of California. 11. Any and all notices sent or required to be sent to the parties of this Agreement will be mailed by first class mail, postage prepaid, to the following addresses: RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT 1995 Market Street Riverside, CA 92501 DONAHUE SCHRIBER ASSET MANAGEMENT CORPORATION 200 E. Baker Street, Suite 100 Costa Mesa, CA 92626 STARK MENIFEE LAND LLC c/o Regent Properties 11990 San Vicente Blvd., Suite 200 Los Angeles, CA 90049 Attn: Matthew Levy CITY OF MENIFEE 29714 Haun Drive Menifee, CA 92117 Attn: City Manager DONAHUE SCHRIBER REALTY GROUP, L.P. 200 E. Baker Street, Suite 100 Costa Mesa, CA 92626 12. Any action at law or in equity brought by any of the parties hereto for the purpose of enforcing a right or rights provided for by the Agreement, shall be tried in a court of competent jurisdiction in the County of Riverside, State of California, and the parties hereto waive all provisions of law providing for a change of venue in such proceedings to any other county. 13. This Agreement is the result of negotiations between the parties hereto, and the advice and assistance of their respective counsel. The fact that this Agreement was prepared as a matter of convenience by DISTRICT shall have no import or significance. Any uncertainty or ambiguity in this Agreement shall not be construed against DISTRICT because DISTRICT prepared this Agreement in its final form. -24- 124193_6 1 14. The rights and obligations of DEVELOPERS shall inure to and be binding 2 upon all heirs, successors and assignees. 3 15. DEVELOPERS shall not assign or otherwise transfer any of their rights, 4 duties or obligations hereunder to any person or entity without the written consent of the other 5 parties hereto being first obtained. In the event of any such transfer or assignment, 6 7 DEVELOPERS expressly understand and agree that they shall remain liable with respect to any 8 and all of the obligations and duties contained in this Agreement. 9 16. The individual(s) executing this Agreement on behalf of DEVELOPERS 10 hereby certify that they have the authority within their respective company(ies) to enter into and 11 execute this Agreement, and have been authorized to do so by any and all boards of directors, 12 legal counsel, and or any other board, committee or other entity within their respective 13 company(ies) which have the authority to authorize or deny entering this Agreement. 14 15 17. This Agreement is intended by the parties hereto as a final expression of 16 their understanding with respect to the subject matter hereof and as a complete and exclusive 17 statement of the terms and conditions thereof and supersedes any and all prior and 18 contemporaneous agreements and understandings, oral or written, in connection therewith. This 19 Agreement may be changed or modified only upon the written consent of the parties hereto. 20 H 21 H 22 23 24 25 26 27 28 - 25 - 124193_6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on OCT 2 7 2009 (to be filled in by Clerk of the Board) RECOMMENDED FOR APPROVAL: By L5L OG"L, --- WARREN D. WILLIAMS General Manager -Chief Engineer APPROVED AS TO FORM: PAMELA J. WAL S County nuns By NPIAL KIPN Deputy County Vounsel Cooperative Agreement: PM 34275 6/08/09 JPS:blj RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT B ARI N ASHLEY, Ch irman Riverside County Flood Control an Water Conservation District Board of Supervisors ATTEST: KECIA HARPER-IHEM Clerk of the Board B,LL,Oe Deputy (SEAL) -26- d1,2 OCT272009 124193_16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RECO ENDED aPP VAL: CITY OF MjjENIFEE By By 0 GEO E ft. WE T WALLACE . EDGERTON City Manager Mayor APPROVED AS TO FORM: By &4 C04-�1 cGc i. ELIZ BETH MARTYN City Attorney Cooperative Agreement: PM 34275 6/08/09 JPS:blj ATTEST: KATHY BENNETT City Clerk By (SEAL) -27- 124193_6 1 STARK MENIFEE LAND LLC, a Wisconsin limited liability company 2 By: STARK OFFSHORE MANAGEMENT LLC, 3 a Wisconsin limited liability company, Its Manager 4 5 By j� Aw"O—bl Print NameIV V d - ,,& 7 Print Titlek"6rl ssfoo/'l 8 9 (ATTACH NOTARY WITH CAPACITY STATEMENT) 10 11 12 13 14 15 (SIGNATURES CONTINUED ON FOLLOWING PAGE) 16 17 Cooperative Agreement: PM 34275 18 6/04/09 JPS: 19 20 21 22 23 24 25 26 27 28 -28- STATE OF Wisconsin COUNTY OF Milwaukee On , beforeze,Notary Public, 1•sonally appeared personally known to me ( be the person} whose name( isl;4 subscribed to the within instrument and acknowledged to me that KelshelthQ*.executed the same in hWherlthoiLauthorized capacity(iQ6), and that by #i-Aher/+ke4 signature( on the instrument the personA-) or the entity upon behalf of which their person) acted, executed the instrument. WITNESS my hand and official seal. • • •,„' OtIYA NOS . —i ,• A '�� i . Signature (Seal) 000 + My Commission Expires; February 14, 2010 •�� .Wl$ ����. * •� ' 124193_6 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Cooperative Agreement: PM 34275 6/04/09 JPS: DONAHUE SCHRIBER REALTY GROUP, L.P., a Delaware limited partnership By: DONAHUE SCHRIBER REALTY GROUP, INC., a Maryland corporation, Its General Partner By "k L 0 "1 Print Name Mark L. Whitfield Executive Vice President Print Title (ATTACH NOTARY WITH CAPACITY STATEMENT) By L - 0;i�� Print ame Janet L. Petersen DFaVelopmen—t Si Print Title (ATTACH NOTARY WITH CAPACITY STATEMENT) DONAHUE SCHRIBER ASSET MANAGEMENT CORPORATION, a Delaware corporation By G Print Name Mark L. Whitifield Executive Vice President Print Title (ATTACH NOTARY WITH CAPACITY STATEMENT) By �rijntameJanet L. Petersen rrp- res ran eve, ❑pm-ers rservic es Print Title (ATTACH NOTARY WITH CAPACITY STATEMENT) -29- ACKNOWLEDGMENT STATE OF CALIFORNIA ) ) ss. COUNTY OF ORANGE ) On July 8, 2009, before me, Wendy MacAulay, Notary Public, personally appeared Mark L. Whitfield and Janet L. Petersen, who proved to me on the basis of satisfactory evidence to be the persons whose names are subscribed to the within instrument and acknowledged to me that they executed the same in their authorized capacity, and that by their signatures on the instrument the persons, or the entity upon behalf of which the persons acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. IL...., ., STATE OF CALIFORNIA COUNTY OF ORANGE Wendy MacA lay Notary Public in and for said County and State My Commission No. 1599091 My Commission Expires 08/30/2009 ACKNOWLEDGMENT ss. On July 8, 2009, before me, Wendy MacAulay, Notary Public, personally appeared Mark L. Whitfield and Janet L. Petersen, who proved to me on the basis of satisfactory evidence to be the persons whose names are subscribed to the within instrument and acknowledged to me that they executed the same in their authorized capacity, and that by their signatures on the instrument the persons, or the entity upon behalf of which the persons acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. E rxnrM* 1~ 1oy f- Cftroo!argi COuyM EWMAg3,2 04 Wendy MacAulay Notary Public in and for said County and State My Commission No. 1599091 My Commission Expires 08/30/2009 Exhibit A VICINITY MAP SECTION 3 TOWNSHIP 6 SOUTH RANGE 3 WEST Cooperative Agreement Parcel Map 34275 1/4 Exhibit A ORANGE vow f � RED ' 9 w BLUE i � I i fi RED I I. i { cooperative Agreement Parcel Map 34275 2/4 Exhibit RED 'G T 1 � g YELLOW w YELLOW 1 g , w 0 8 a ~ YELLOW / 1 I PURPLE I F+ ca Looperative Agreement Parcel Map 34275 3/4 Exhibit A I - GREEN ti avow 1wodM3H II I � : I I 11 GREEN � I I 11 I � ! }---- GREEN x a � avow VU031d Y1 d IN I — GREEN o IQ oc I III II � W � I I I II f1 I !. II I I I 11 GYM QNV-11o" II I lyl I rr I i► i i c ooperative Agreement Parcel Map"34275 4/4 Exhibit B NEWPORT ROAD PARCEL 1 i PARCEL PARCEL 2 !!PARCEL II PARCEL MAP !! NO. 9504 PARCEL 3 ! I PARCEL 7 11 P . M . B 61/5--6 PARCEL 4 i! PARCEL 8 LA PIEDRA 1f ROAD II ! + PARCEL 9 I ! PARCEL 10 M! ! I PARCEL 11 cn l I PARCEL 12 PARCEL 14 ! PARCEL 15 HOLLAND ROAD Cooperative Agreement Parcel Map 34275 115 D GREEN PURPLE GREEN BLUE BLUE Exhibit B Cooperative Agreement Parcel Map 34275 2/5 Exhibit B Cooperative Agreement Parcel Map 34275 3/5 Exhibit B Cooperative Agreement Parcel Map 34275 4/5 Exhibit B Cooperative Agreement Parcel Map 34275 5/5