2021/03/30 All American Asphalt, Inc. CIP 16-13, Order No. 004Page 1 of 2 DATE:3/30/2021 PROJECT DESCRIPTION: PROJECT NO:CIP 16-13 PURCHASE ORDER NO: 02807 CONTRACTOR: DESCRIPTION OF CHANGES AND/OR EXTRA WORK: The Contractor is hereby directed to make the herein described changes from the plans and specifications and/or perform the following described work not included in the Plans and Specifications for this project. ITEM DESCRIPTION U/M QUANTITY UNIT PRICE TOTAL 1 LS 1 $1,774.00 $1,774.00 2 LS 1 $264.00 $264.00 TOTAL ESTIMATED PRICE FOR THIS CHANGE ORDER:$2,038.00 JUSTIFICATION: (Be specific on each item. Attach supporting documents as necessary) Page 2 of 2 CONTRACT CHANGE ORDER NO. 004 CITY OF MENIFEE DEPARTMENT OF PUBLIC WORKS ALL AMERICAN ASPHALT ADDITIONAL COST FOR CANOPY CHANGE MISSED IN CO 3 PUBLIC WORKS MAINTENANCE AND OPERATIONS CENTER SAWCUT AND LAY OUT FOR THE WEST BUILDING NOT IN CONTRACT This document shall become an amendment to the Contract and all provisions of the Contract will apply hereto. This Change Order constitutes a complete and final resolution of all claims of the Contract for additional time or additional compensation related to or affected by work that is the subject of this Change Order. Quantities of items other than Lump Sum are not to exceed the amounts indicated. No additional Working Days will be required to perform this work. Item 1) THE CONTRACTOR WAS REQUESTED TO LAY OUT THE LOCATIONS OF THE FOOTINGS AND CUT THE CONCRETE FOR THE EQUIPMENT ENCLOSURE BUILDIING WHICH WAS NOT PART OF THIS CONTRACT AND WAS PER AGREED PRICE Item 2) ADDITIONAL COST FOR CHANGING THE CANOPY FOR THE TRASH ENCLOSURE . THIS CHANGE ORDER IS NEEDED TO BRING THE ACTUAL AMOUNT IN LINE WITH THE ACTUAL NEGOTIATED INVOICE R:\Contracts\2020-21\PW-ENG- ALL AMERICAN ASPHALT (CIP 16-13 MOC)\CIP 16-13 Change Order #4 (3.30.2021) DocuSign Envelope ID: 7ACAF288-84F7-4423-80D6-649FA8705E8F CONTRACT CHANGE ORDER NO. 004 CITY OF MENIFEE DEPARTMENT OF PUBLIC WORKS CONTRACT VARIANCE SUMMARY CCO #Amount % 4 $2,038.00 0.71% 3 $2,640.00 0.92% 2 $3,323.42 1.15% 1 $13,481.66 4.68% Totals $21,483.08 5.84% $287,806.00 October 5, 2020 $19,445.08 December 10, 2020 $2,038.00 0 $309,289.08 December 10, 2020 AUTHORIZATION BY CITY: Recommended for approval by: 4 Date: __________Date: __________ Approved by: Date: __________Date: __________ Yolanda Macalalad Armando G. Villa City Manager ACCEPTANCE BY CONTRACTOR: We, the undersigned Contractor, have given careful consideration to the above described changes and/or extra work and hereby agree that said work is a supplement to the contract and all provisions will apply hereto. Accepted by: _____________________________________________________Date: ____________________________ Signature _____________________________________________________ Please print name and title PE, Assistant City Engineer _________________________________________ ___________________________________ ________________________________________ Description PROVIDE AND INSTALL IRRIGATION BACKFLOW & ENCLOSURE 0 3/10/2021 SAWCUT & LAYOUT FOR EQUIPMENT ENCLOSURE BUILDING NOT ON CONTRACT/ADDITIONAL COST FOR CANOPY CHANGE MISSED IN CO 3 0 Original Contract Amount: Additional Time 0 0 0 Date Approved 1/11/2021 10/15/2020 REMOVE KRAIL/ INSTALL ELECTRICAL CONDUIT AND WIRE Run Chen, PE, Senior Engineer Previous Change Order Amounts: Current Change Order Amount: Revised Contract Amount: Don Sharp, Construction Manager Date Started: Original Completion Date: Additional Time (Working Days) Revised Completion Date: A NEW CANOPY DESIGN NEEDED TO BE IMPLEMENTD IN ORDER TO OMIT STRUCTUAL CONFLICT WITH TRASH CONTAINERS R:\Contracts\2020-21\PW-ENG- ALL AMERICAN ASPHALT (CIP 16-13 MOC)\CIP 16-13 Change Order #4 (3.30.2021) DocuSign Envelope ID: 7ACAF288-84F7-4423-80D6-649FA8705E8F 5/18/2021 Edward J. Carlson, Vice PresidentVice President 5/18/20215/18/2021 5/18/2021 5/20/2021