2021/01/12 All American Asphalt, Inc. Change of Order No. 003, CIP 16-13, Public Works Maintenance and Operations CenterCITY OF MENIFEE DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. 003 Pere 1 of 2 DATE: ti1212021 PROJECT DESCRIPTION: PUBL:C WORKS MAINTENANCE AND OPERATIONS CENTER PROJECT NO: CIP 16.13 PURCHASE ORDER NO: CONTRACTOR: ALL AMERICAN ASPHALT DESCRIPTION OF CHANGES ANWOR EXTRA WORK: The Contractor is hereby directed to make the herein described cnanges from the plans and specifications and/or perform the fokowing described work not Included In the Plans and Specifications for this project PROVIDE NEW ENCLOSURE DESIGN WHICH ELIMINATES THE MIDDLE COLUMN THUS OPENING UP THE FRONT OF THE TRASH 1 ENCLOSURE AND REMOVING CONFLICTS WITH TRASH BINS 1 $2,640 DO This document shall became an amendment to the Contract and all provisions of the Contract will apply hereto This Charge Order ccratitules s complete and Final resolution of all claims of ea Contract for additional time or additional compensation related tow allecled by work that Is the %object of Ibis Change Order Ouerailies of Items other den Lump Sum are not to exceed the amouna iricksted JUSTIFICATION: (Be specific on each item. Attach supporting documents as necessary) THE ORIGINAL DESIGN OF THE TRASH ENCLOSURE CANOPY HAD THE FRONT AREA DEVIDED BY A COLUMN WHICH MADE IT IMPOSSIBLE TO ACCESS TWO OF THE TRASH CONTAINERS. AN ALTERNA"E OEStGN NEEDED TO Be WSTAi.LEG TO A_LEVIATE THIS 13311E NoaWW11W Warkala Days *9 be requited to perfoms the WorlL Pape 2 of 2 M:Wubk Works Deperlmenft PubeC Wwss PrgedslCIP Prajm1 1S FW Yere IMOCI Phase 2_1 endsW,rig 3 Steel BuIldiNslF Fi-r-hCHANGE ORDERS=3 UNSIGNED CITY OF MENIFEE DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. 003 CONTRACT VARIANCE SUMMARY CCO 0 Description Amount % Additional Time Dale Approved 3 A NEW CANOPY DESIGN NEEDED TO BE IMPLEMENTD IN ORDER TO OMIT STRUCTUAL CONFLICT WITH TRASH CONTAINERS .640.00 0 g2% 2 PROVIDE AND INSTALL IRRIGATION BACKFLOW & ENCLOSURE AND $3.323 d2 115% 0 111V2021 1 REMOVE KRAILI INSTALL ELECTRICAL CONDUIT AND WIRE 111dill 66 4 8% 0 10115l2020 'Totele $16.80508 58d % 0 Original Contract Ameum: $287,008 00 Previous Change Order Amounts: $16.005 08 Curenl Change Order Amount: $2,640 00 IRevleed Contract Amount: 1307,251.08 AUTHORIZATION BY CITY: Recommended for approval by: Date Crest, pE. Snnfar Engineer Approvedb Dale: Yulandd alalad PE. Asp nt City Engineer ACCEPVANCE BY CONTRACTOR: Date Slarled: October 5, 202 Original Completion Dale. December 10, 2020 Additional Time (Working Days) 0 Revised Completion Dale: December 10, 2020 Dale G31fl/optl Oon Sna .n,�,s>i Manager We, the undersigned Contractor, have given careful consideration to the above described changes and/or extra work and hereby agree that amid work is a supplement to the contract and all provisions will apply hereto Accopled by: / Dale: iq S+gnuuxa sea print name and fille M Wubilc Warta Dapadmanl\_Pubac Wwka PrcjadNCUP ProlacW16-? 3 PW Yard (MOCi 3, um 2 Lmd—ping A Sao] eulldingNF - Fhen—WHANGE ORIptl 3 tuhi CO