Loading...
2019/04/24 COPP Contracting, Inc. Contract Change Order No. 001 - PMP 19-01 Miralago / Lakepointe Resurfacing CITY OF MENIFEE DEPARTMENT OF PUBLIC WORKS IR CONTRACT CHANGE ORDER NO.001 DATE: 4/24/2019 Page 1 of 2 PROJECT DESCRIPTION: MIRALAGO/LAKEPOINTE RESURFACING PROJECT NO: PMP 19-01 PURCHASE ORDER NO: CONTRACTOR: COPP CONTRACTING INC DESCRIPTION OF CHANGES AND/OR EXTRA WORK: The Contractor is hereby directed to make the herein described changes from the plans and specifications and/ar perform the following described work not included in the Plans and Specifications for this project. ITEM DESCRIPTION UIM QUANTITY UNIT PRICE TOTAL C01 INCREASED BID ITEM NO 8 BY THE DIFFERENCE BETWEEN THE CZ FIG TO.10 ASPHAL T AND RUBS ERIZE D ASPHALT 1,183 21.18 $24,632.34 WTOTALESTIMATED PRICE FOR THIS CHANGE ORDER: j24,832.34 rns document slfad bacwue an amendanenl to the Contrael ants ell provisions of the Contract will apply hi lo. This Change Order constitutes a complete and fatal resoluhorl of all Oalms of the Contract for addihanal time or add+tlonol compensation related to or of ocled by work Thal is the subject of this Change Order. ❑uantitres of dams[Hhar(ham Lkarnp Surll are not to exceed the amounts Indtinmdd JUSTIFICATION: (Be specific on each item. Attach supporting documents as necessary) IT WAS DETERMINED IN THE FIELD THAT THE GRINDING OF THE EXISTING ASPHALT RESULTED IN AN UNACCEPTABLE AMPLITUDE IN THE SURFACE OF THE ASPHALT WAS NOT CONDUSIVE TO THE APPLICATION AND THE INSTALLATION OF THE PAVING FABRIC AND WAS DETERMINED THAT RUBBERIZED ASPHALT WOULD BE MORE SUTABLE FOR THE CONDITIONS No aaditlonal Workln Da is vrN be re oIred to partorm this work C 1Users!hndaWppDelalLocellMicrosofDWindowsllNetcarha\iEleAZEE4RH1C0 1 xis J CITY OF MENIFEE DEPARTMENT OF PUBLIC WORKS NW CONTRACT CHANGE ORDER NO.001 I Page 2 of 2 CONTRACT VARIANCE SUMMARY CCO# Description Amount % Additional Time Date Approved REPLACE PAVING FABRIC WITH 1 RUBBERIZED ASPHALT $24,632 34 4 04% 0 Totals N3 -4=04-AM Original Contract Amount: $610,339 09 Date Started: April 22,2019 Previous Change Order Amounts: $0.00 Original Completion Date: June 4,2019 Current Change Order Amount: $24,632 34 Additional Time(Working Days) 0 (Revised Contract Amount: $634,971.43 Revised Completion Date: June 4,2019 AUTHORIZATION BY CITY: /Re-r�ornn-wndforapproval by: �Date • enior CIP Engineer Date: Don yCons .,.n anager Approve y: �Direct.r Date: d shot/SmithubfiG Works /City Engineer ACCEPTANCE BY CONTRACTOR: We,the undem4gned Contractor,have given careful consideration to the above described changes and/or extra work and hereby agree that said work is a supplement to the contract and all provisions will apply hereto. c Accepted by: Date:�JULY 10�201910�2019 Sig ure EZEKIEL A. COPP - PRESIDENT Please print name end title C 1uaer5lhnda',AppDaialLocallMicrosoalWindowsVNelCacheilEIBAZEE4RHICO 1 xis