Loading...
2010/09/07 Dennis Janda, Inc. Amendment 3 change to compensation, FY10 agreement AMENDMENT NO. 3 TO PROFESSIONAL SERVICES AGREEMENT THIS is Amendment No. 3 to that certain AGREEMENT for Professional Services Agreement ("Agreement") made on March 12, 2010, by and between the City of Menifee ("City") and Consultant: Dennis Janda Inc. ("Consultant"), which Amendment is made and entered into on September 7, 2010 to increase the compensation as indicated below: 1. Section 2, "Compensation" is amended to read as follows: Section 2. COMPENSATION. City hereby agrees to pay Consultant on fixed basis a sum not to exceed $9,000 for services to be performed and reimbursable costs incurred under this Amendment and as outlined on the attached Scope of Work, Option II. In the event of a conflict between this Agreement and the Attached Scope of Work regarding the amount of compensation, this Agreement shall prevail. City shall pay Consultant for services rendered pursuant to this Agreement at the time and in the manner set forth herein. The payments specified below shall be the only payments from City to Consultant for services rendered pursuant to this Agreement. Consultant shall submit all invoices to City in the manner specified herein. Except as specifically authorized in advance by City, Consultant shall not bill City for duplicate services performed by more than one person. The Parties have executed this Agreement as of September 7, 2010. 2. Attached to the Agreement is the attached two page document "SCOPE OF WORK — Antelope and Watson Project. This is the Safe Route to School Project for Romoland Elementary School which is being partially funded by a State of California Safe Route to School Grant. Professional Services Amendment with Dennis Janda Inc 1 of 2 CITY OF MENIFEE CONSULTANT Don Allison, P.E. City Engineer VV Stev4 Harding, ity Manager ennis Janda, Preside Dennis Janda, Inc. Attest: z'r Kathy Bennett, City Clerk Approved as to Form: Karen Feld, City Attorney Professional Services Amendment with Denis Janda Inc. 2 of 2 SCOPE OF WORK —Antelope and Watson Project Option I Survey: I. Perform horizontal and vertical control survey for Topographic mapping. 2. Perform survey and locating existing centerlines and right of ways relative to proposed sites. 3. Perform conventional ground survey locating aboveground improvements including but not limited to utilities, pavement, curb and gutter, signs, medians, etc. Also locate pavement breaks, i.e. fiowline, crowns, and change in material (concrete, pavement, etc.) Mapping: 1. Prepare engineering base map showing the centerlines and right of way together with the topography and Improvements as discussed above at an accuracy of +!- 0.1' with at 1"=20' scale. 2. Prepare "Offer of Dedication" including legal description and plat for Right of Way takes. Delivery: 1. Provide (1) Hardcopy. 2. Provide (1) Digital Pile in AutoCAD 2007 format All horizontal and vertical control to be consistent with establishment of monuments and existing City facilities. The Horizontal Datum will be Tied to California State Plane(NAD83) and the Vertical Datum to NAVD88. Estimated Hrs- Survey- 1-man crew- 8 Hrs @ $115.00 $920.00 • 2-man crew- 20 Hrs @$160.00 $3200.00 Mapping- • Assistant surveyor- 16 Hrs @$75.00 $1200.00 • Principle surveyor- 8 Hrs @$95.00 $760.00 Total Estimate delivery 10 work days at a cost of $6080.00 Option II Survey: 1. Perform horizontal and vertical control survey for Orthometric and Topographic mapping 2. Perform survey and locating existing centerlines and right of ways relative to proposed sites. 3. Perform conventional ground survey locating aboveground improvements including but not limited to utilities, pavement, curb and gutter, signs, medians, etc. Also locate pavement breaks, i.e. flowline, crowns, and change in material (concrete, pavement, etc.) 4. Perform aerial photogrammetry for 150' strip mapping using photogrammetric methods at a scale of 1" = 20' with 1' contour intervals to meet or exceed NMAS and ASPRS Class 1 accuracies. Mapping: 1. Prepare engineering base map showing the centerlines and right of way together with the topography and improvements as discussed above at an accuracy of -�/- 0.1' with at 1"=20' scale. 2. Orthometric mapping overlay at a scale of 1" = 20' with V contour intervals to meet or exceed LAMAS and ASPRS Class 1 accuracies. 3. Prepare "Offer of Dedication" including legal description and plat for Right of Way takes. Delivery: 1. Provide (1) Hardcopy. 2. Provide (1) Digital File in AutoCAD 2007 format All horizontal and vertical control to be consistent with establishment of monuments and existing City facilities. The Horizontal Datum will be Tied to California State Piane(NAD83) and the Vertical Datum to NAVD88. Estimated Hrs- Survey- • 1-man crew- 8 Hrs @ $115.00 $920.00 • 2-man crew- 16 Hrs @$160.00 $2560.00 Mapping- • Assistant surveyor- 12 Hrs @$75.00 $900.00 • Principle surveyor- 8 Hrs @$95.00 $760.00 Outside service- aerial photogrammetry- $3600.00 Total Estimate delivery 10 work days at a cost of $8740.00