2018/08/06 L.C. Paving and Sealing, Inc. Change Order No. 1 - Newport Road/ Menifee Road Street Improvements G"ry or. MENIFEE .101 CITY OF MENIFEE Change Order Cover Sheet DATE: August 6, 2018 TO: Armando G. Villa, City Manager CC: Wendy Preece, Acting Finance Director FROM: Jonathan G. Smith, Public Works Director/City Engineer PREPARED BY: Carlos E. Geronimo, Senior Civil Engineer SUBJECT: Change Order# 1 CIP 18-06 Newport Road / Menifee Road Street Improvements Why is this Change Order Needed? This Change order is needed to cover the following additional improvements: - This change order covers city initated revisions to the traffic control plan to keep two through traffic lanes open on Newport Road, the traffic striping will be done at night to avoid traffic issues. (see attached quote) What is the total length and amount of the Change Order?: Change Order#1 will not exceed $2,985.00 and will not add any additional days to the contract duration How was the vendor/consultant/contractor decided on?: LC Paving was selected through a public bid and is the Prime Contractor for this project. Is the Change Order within the City Mana_ger's Signature Authority?: Yes, the increase of this scope is within the signature authority of the city Manager(see attached staff report). Total contingency amount: $ 17,436.00 Change Orders to date: $ (2,985.00) Available contingency amount: $ 14,451.00 Where are the funds coming from?: Measure DD What general ledger account number should be used for the purchase order? 105-4555-58063 — CIP 18-06 Additional Information to support the Agreement/Contract: Change Order# 1 Staff Report CITY OF MENIFEE 4 DEPARTMENT OF PUBLIC WORKS SNIFF CONTRACT CHANGE ORDER NO.001 Page 1 of 2 DATE: 6/6/2018 PROJECT DESCRIPTION: Newport Road/Menifee Road Street Improvements PROJECT NO: CIP 18-06 PURCHASE ORDER NO: CONTRACTOR: LC Paving DESCRIPTION OF CHANGES AND/OR EXTRA WORK: The Contractor is hereby directed to make the herein described changes from the plans and specifications and/or perform the following described work not included in the Plans and Specifications for this project. ITEM DESCRIPTION U/M QUANTITY UNIT PRICE TOTAL 1 Traffic Control revisions/additional restri ing LS 11 2.985.00 $2.985.00 TOTAL ESTIMATED PRICE FOR THIS CHANGE ORDER: $2,985.00 This document shall become an amendment to the Contract and all provisions of the Contract will apply hereto. This Change Order constitutes a complete and final resolution of all claims of the Contract for additional time or additional compensation related to or affected by work that is the subject of this Change Order Quantities of items other than Lump Sum are not to exceed the amounts indicated JUSTIFICATION: (Be specific on each item Attach supporting documents as necessary) Item 1:This change order will cover revisions to the traffic control which will keel)two through traffic lanes on Newport Road, the traffic striping will be done at night to avoid traffic issues (see attached quote) MiPublic Works Department\Public Works ProiectsVP Proiecls\1a-06 Newport Rd-Menifee Rd ImpmvemenlslC-ConstrvcboMC-8 Chanae Orders(CCO)8 Supportina Docs1C011CIP 18-06 CC01 1 CITY OF MENIFEE 4 DEPARTMENT OF PUBLIC WORKS NIFE CONTRACT CHANGE ORDER NO.001 r' a Page 2 of 2 CONTRACT VARIANCE SUMMARY CCO# Description Amount % Additional Time Date Approved 1 Traffic Control Revision $2.985.00 1.71% 0 Totals $2,985.00 1.71% 0 Original Contract Amount: $ 174,362 10 Construction start date(NTP): May 29,2018 Previous Change Order Amounts: $0.00 Contract Working days: 25 Current Change Order Amount: $ 2,985.00 Change order time awarded 0 Revised Contract Amount: $ 177,347.10 Total working days 25 City Holidays during project time 0 Contingency Amount $ 17.436,00 lCompletion Date: July 3,2018 Total Change Orders $ 2,98500 Remaining Contingency Amount $ 14,451.00 AUTHORIZATION BY CITY: Recommended for approval by: Date: <6 �� Dale: -Dort-Sharp— A-cc14r✓ `(u r' Carlos E Ge oni o,P E Senior Inspector,Construction Manage Senior Civil Engineer, oject Manager Approve by: Date:6` I g uk4 Date: nathan Smith,P E Armando G1Nlilla Director of Public Works/City Engineer City Manager ACCEPTANCE BY CONTRACTOR: We,the undersigned Contractor,have given careful consideration to the above described changes and/or extra work and hereby agree that said work is a supplement to the contr and II pro isions will apply hereto. Accepted by: Date: IK Signature / Please print name and title M:\Public Works Department\_Public Works Projects\CIP Projects\18-06 Newport Rd-Menifee Rd Improvemenls\C-Construction\C-8 Change Orders(CCO)&Supporting Docs\CO1\CIP 18-06 CC01 330 Rancheros Dr. Suite 208 San Marcos, CA 92069 760.752.1743 760.752.1674 Fax Lic. No. 621610 nicklablcwino.com Proposal Proposal Submitted To: Project: City of Menifee Menifee & Newport ATTN: Carlos Geronimo Temporary Striping Date 06/05/2018 Description QTY RATE TOTAL Temporary striping for Newport Rd. in an Effort to keep lanes open during construction. Temp striping per plan attached. 1 $2,985.00 $2,985.00 TOTAL $2,985.00 Date of Acceptance: Signature: molag aag V-V 3NIIHOiVW ■ N �- ■ m m 3 LL ■ O ■ I II ■ 00 � ■ N ■ m a II II N "p �E •E Y1 } LO m °w W LO Z : m W `U) LD W c w O 2 • o 0 o cn • C ■ U I � m II I N ■ � C r I; U I a) I I t I I o I m g° O > �* o v 0o s EI 3 _0 Q Z i a) o n QIL r F 72 CL a LOO � 0 3W 0 ) 3 q z 06 IE 1� II I II 'I I o Q to I O Z W � _ 3 O -I- Q co -C O 0— _ — — — F- 00 Y 6X of W xk 3: _ LO - - - - - --,) O LL s _ X a- H O - � CL a z � 3 __ —� I I I m - , �li • I • N C � o N ■ 3LO oa "1 ! r �... • <■ w Z LO ■ ■ o • z Z • w N ■ F m Z ■ goo anogV aag \ o V-V 3NIIHOiVW N > W4 2(L) W20-5(L) t- G20-Trl W20.1 w 7