Loading...
2017/09/20 L.C. Paving and Sealing, Inc. PW17-02 OnCall concrete maintenance services CITY OF MENIFEE BID AND CONTRACT DOCUMENTS OWNER-CONTRACTOR AGREEMENT PW 17-02 ON-CALL CONCRETE MAINTENANCE SERVICES This Owner-Contractor Agreement ("Agreement") is made and entered into for the above referenced Project by and between the CITY OF MENIFEE ("Agency"), and L.C. PAVING 7 SEALING. INC ("Contractor"), whose principal business address is: 330 RANCHEROS DRIVE. STE. 208, SAN MARCOS. CA 92069 on the 20TH day of SEPTEMBER, 2017. In consideration of the mutual covenants and agreements set forth herein, the Agency and Contractor have mutually agreed as follows: 1. CONSTRUCTION The Contractor agrees to do all the Work and furnish all the labor, services, materials and equipment necessary to construct and complete the Project in accordance with the Contract Documents (as hereinafter defined), including all work, labor, services, materials and equipment described and reasonably inferable from documents enumerated in Exhibit "A" attached hereto and incorporated herein by reference (such construction and furnishing of labor, service, materials and equipment hereinafter referred to as the "Work") in a good worker-like and substantial manner and to the satisfaction of the Agency, in connection with the (Project No: PW 17-02 & Project Title: ON-CALL CONCRETE MAINTENANCE SERVICES ) to be constructed on (Project Location: CITYWIDE ) in the City of Menifee, California. The term Contract Documents shall mean this Agreement, and all of the items enumerated in Exhibit"A" and all change orders or addenda issued by the Agency with respect thereto. Agency must consent in writing to any changes in the scope of Work. Exhibit "A" shall be deemed revised in accordance with any revisions for which Agency's consent has been issued. Any revisions to the scope of Work for which Agency's consent has not been issued shall be null and void. 2. CONTRACT PRICE Agency hereby agrees to pay and the Contractor agrees to accept as full compensation for all Work performed in accordance with these Contract Documents the Contract Price as set forth in Exhibit "B", Contract Price, attached hereto and incorporated herein by reference. Payments to the Contractor shall be made in the manner described in the Special Provisions. 3. TIME FOR PERFORMANCE Time is of the essence in the performance of Work for this Agreement and all timing requirements shall be strictly adhered to unless otherwise modified by the Agency in accordance with these Bid and Contract Documents. The Contractor shall complete the Work in every detail to the satisfaction of the Agency, exclusive of maintenance periods, within the specified duration set forth in the Notice to Proceed. 4. DELAYS AND EXTENSIONS OF TIME See Section 6-6 of the Special Provisions. 290/031858-0008 7645681.2 a09/21/17 Page I 5. LABOR CODE REQUIREMENTS Pursuant to Labor Code Section 1771.1, the Contractor and all subcontractors shall be registered with the Department of Industrial Relations. Pursuant to Labor Code Section 1771.4, the Contractor is hereby notified that this Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. [EFFECTIVE APRIL 1, 2015.] 6. NON-DISCRIMINATION In the performance of this Agreement, the Contractor shall not refuse or fail to hire or employ any qualified person, or bar or discharge from employment any person, or discriminate against any person, with respect to such person's compensation, terms, conditions or privileges of employment because of such person's race, religious status, sex or age. 7. AUTHORIZED AGENCY REPRESENTATIVES On behalf of the Agency, the City Engineer of the City of Menifee shall be the Agency's authorized representative in the interpretation and enforcement of all Work performed in connection with this Agreement. The City Engineer may delegate authority in connection with this Agreement to his/her assigned designees. 8. WORKERS' COMPENSATION INSURANCE a) By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the Work of this Agreement. b) The Contractor shall require each subcontractor to comply with the requirements of Section 3700 of the Labor Code. Before commencing any Work, the Contractor shall cause each subcontractor to execute the following certification: "I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the Work of this Agreement." 9. ENTIRE AGREEMENT; CONFLICT The Contract Documents comprise the entire agreement between the Agency and the Contractor with respect to the Work. In the event of conflict between the terms of this Agreement and the bid of the Contractor, then this Agreement shall control and nothing herein shall be considered as an acceptance of the terms of the bid conflicting herewith. 10. MAINTENANCE OF AGREEMENT DOCUMENTATION 290/031858-0008 7645681.2 a09/21117 Page 2 Contractor shall maintain all books, documents, papers, employee time sheets, accounting records and other evidence pertaining to costs incurred and shall make such materials available at its office at all reasonable times during the term of this Agreement and for three (3) years from the date of final payment under this Agreement, for inspection by Agency and copies thereof shall be furnished to Agency if requested. 11. INDEPENDENT CONTRACTOR At all times during the term of this Agreement, Contractor shall be an independent contractor and shall not be an employee, agent, partner or joint venturer of the Agency. Agency shall have the right to control Contractor insofar as the results of Contractor's services rendered pursuant to this Agreement; however, Agency shall not have the right to control the means by which Contractor accomplishes such services. 12. LICENSES AND PERMITS Contractor represents and declares to Agency that it has all licenses, permits, qualifications and approvals of whatever nature which are legally required to practice its profession. Contractor represents and warrants to Agency that Contractor shall, at its sole cost and expense, keep in effect at all times during the term of this Agreement, any licenses, permits, qualifications or approvals which are legally required for Contractor to practice its profession. 13. GOVERNING LAW, VENUE This Agreement and the Contract Documents shall be construed under and in accordance with the laws of the State of California, and the appropriate venue for any action or proceeding arising from this Agreement and/or the Contract Documents shall be had in the Superior Court of Riverside, Temecula Branch 14. COUNTERPARTS This Agreement may be executed in any number of counterparts, each of which shall for all purposes be deemed to be an original. 15. FALSE CLAIMS Contractor acknowledges that if a false claim is submitted to the Agency, it may be considered fraud and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False Claims Act, California Government Code sections 12650, et seq., provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include within their scope false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information. In the event the Agency seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys' fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an administrative debarment proceeding wherein Contractor may be prevented from further bidding on public contracts for a period of up to five (5) years. I have read and understood all of the provisions of this Section 15, above: 290/031858-0008 7645681.2 a09/21/17 Page 3 AA (Initial) (I ) 16. AGREEMENT MODIFICATION This Agreement and the Contract Documents may not be modified orally or in any manner other than by an amendment in writing and signed by the Agency and the Contractor. IN WITNESS WHEREOF this Agreement is executed as of the date first written above. CITY: CONTRACTOR: CITY OF MENIFEE L.C. PAVING & SEALING, INC. i By: az By: Ronald E. Bradley, Interim City Manage ose A. Salinas Its: PRESIDENT,SEC,TRES,VP,MANAGER APPROVED AS TO FORM: By: _ Name: By: ar Its: J fre . Melching, City A hey ATTEST: Contractor's City Business License No. 621610 A, B. C-12 By: State Contractor License No. & Class S rah A. anwaring, City 330 RANCHEROS DRIVE, STE 208 Street Address SAN MARCOS, CA 92069 City, State, Zip Code 290/031858-0008 7645681.2 a09/21/17 Page 4 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of San Diego On before me, Marisa Haas, Notary Public (insert name and title of the officer) personally appeared Jose A. Salinas who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. MARISA ANN HAAS Commission 0 2122991 WITNESS my hand and Tfficialsb(. Notary Public-California IWMV San Diego County Comm.E ras A 15 2019 Signature (Seal) [NOTE: In the event the Contractor is a Corporation, the signatures of two separate persons holding different offices must be provided.] 290/031858-0008 7645681.2 a09/21/17 Page 5 EXHIBIT A CONTRACT DOCUMENTS Owner-Contractor Agreement Bid Schedule Special Provisions (Specifications) 290/031858-0008 7645681.2 a09/21/17 Page 6 EXHIBIT B CONTRACT PRICE PW 17-02: ON-CALL CONCRETE MAINTENANCE SERVICES The total contract amount is in the not-to-exceed amount of $45,000 (Forty Five Thousand Dollars and Zero Cents). 290/031858-0008 7645681.2 a09/21/17 Page 7 L.C.PAVING&SEALING,INC. Name of Contractor PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL OF THE CITY OF MENIFEE, CALIFORNIA The undersigned hereby proposes to perform all work for which a contract may be awarded him and to furnish any and all labor, material, equipment, transportation and other facilities required for: ON-CALL CONCRETE MAINTENANCE SERVICES PROJECT NO: PW 17-02 together with appurtenances thereto, all as set forth in the Specifications, and other Contract Documents, and he further proposes and agrees that, if his bid is accepted, he will contract in the form and manner stipulated, to perform all work called for by the Specifications and other Contract Documents, and to complete all such work in strict conformity therewith within the time limits set forth therein, and that he will accept as full payment therefore the unit prices named in the Bid Schedule(s) forming a part hereof. By signing this proposal it is understood and agreed that: 1. The undersigned has carefully examined all the Contract Documents which will form a part of the Contract; namely, Notice of Invitation to Bid, Instructions to Bidders, Contract Services Agreement, Proposal Forms, Contract Forms, Performance Bond, Payment Bond, Non-Collusion Affidavit, Specifications and Drawings, and all revisions or addenda setting forth any modifications or interpretations of any of said documents. 2. The undersigned has by investigation at the site of the work and otherwise satisfied himself as to the nature and location of the work and fully informed himself as to all conditions and matters which can in any way affect the work or the cost thereof. 3. The undersigned fully understands the scope of the work and has checked carefully all words and figures inserted in this bid and he further understands that the City will in no way be responsible for any errors or omissions in the preparation of this bid. 4. The undersigned will execute the agreement and furnish the required bonds and certificates of insurance within ten (10) working days after notice to him of acceptance of his bid by the City. Page 1 13 5. The undersigned hereby certifies that this proposal is genuine and not sham or collusive or made in the interest or on behalf of any person not herein named and the undersigned has not directly or indirectly induced or solicited any other bidder to put in a sham bid or any other person, firm or corporation to refrain from bidding, the undersigned has not in any manner sought by collusion to secure for himself an advantage over any other bidder. 6. The undersigned will accept an award and enter into a contract for all work scheduled herein on which he submits a bid. The award for such work shall be entirely at the discretion of the City after evaluation of the bids. In the event the bidder to whom the work is awarded fails to enter into a contract and furnish the required bonds therefore within the time provided, the bidder will be liable for forfeiture of ten percent (10%) of the total bid amount to the City, even though such amount may be less than the face amount of the bid security, check or bond posted with the bid. 7. The undersigned agrees that the quantities given in the Bid Schedule(s), for which unit prices are bid, are for the comparison of bids only and the City does not expressly, or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of each or to omit portions of such work, as may be deemed necessary or expedient by the City. See Article 1.10 of the Contract Services Agreement. 8. Addenda: No: NONE Received No: Received No: Received The undersigned is licensed in accordance with the laws of the State of California providing for the registration of Contractors. L.C.PAVING&SEALING,INC. By GlJ' v� Name of Firm Si nature 330 RANCHEROS DRIVE,STE.208 PRESIDENT,SEC,TREASURER,VP Address Title SAN MARCOS,CA 92069 By 760-752-1743 Signature Telephone Number Title 621610 A,B &C-12 08/30/2017 License No. Classification Date of Expiration Page 1 14 * Surety to be utilized for Contract Bonds (Performance Bond and Payment Bond). ARGONAUT INSURANCE COMPANY ROCKY QUALIN Name of Surety Local Representative PO BOX 469011 750 B STREET,STE.2400 Address Address SAN ANTONIO,TX 78246 SAN DIEGO,CA 619-920-3089 Telephone Number Telephone Number Best Key Rating A(XIH) EXCELLENT Grade Class *Note: Surety information is required as part of this proposal; failure to provide such information will cause this bid to be informal and subject to rejection. Page 1 15 � 4 • • • 0 - 1,000 3.50 / SF Demo existing concrete: Sawcut, 1,001 - 2,500 3.00 / SF remove & legally dispose existing 2,501 - 5,000 2.75 / SF concrete 5,001 + 2s0 / SF Estimated Annual Total 2,000 3.00 / SF $6,000.00 0 - 100 143.00 / LF Type 6 Curb and Gutter: 101 -250 142.00 / LF Construct new per City Detail #200 251 - 500 40.00 / LF 501 + 40.00 ! LF Estimated Annual Total 200 42.00 / LF $8400.00 Type 8 Curb and Gutter: 0 - 100 54.00 / LF Construct new per City Detail #201 101 - 250 52.00 ! LF 251 - 500 48.00 / LF 501 + 38.00 / LF Estimated Annual Total 200 52.00 / LF $1040o.00 Type 6A Curb: Construct new per 0 - 100 26.00 / LF City Detail #202 101 -250 24.00 / LF 251 - 500 22.00 / LF 501 + 18.00 / LF Estimated Annual Total 200 24.00 / LF $4,800.00 Type 8A Curb: Construct new per 0 - 100 28.00 /LF City Detail #203 101 -250 26_00 /LF 251 - 500 24.00 /LF 501 + 20.00 /LF Estimated Annual Total 200 126.00 /LF 1 $5200.00 Cross Gutter and Spandrel: 0 - 100 54.00 /Sy Construct new per City Detail #209 101 - 250 50.00 /Sy 251 - 500 48.00 /Sy 501 + 48.00 /Sy Estimated Annual Total 200 50.00 /Sy $10,000.00 0 - 100 56.00 /Sy Ribbon Gutter: Construct new per 101 - 250 55.00 /Sy City Detail # 210 251 - 500 52.00 /Sy 501 + 48.00 /Sy Estimated Annual Total 200 55.00 /Sy $11,0oo.00 0 - 100 46.00 / LF Type C Curb and Gutter: 101 - 250 42.00 / LF Construct new per City Detail #212 251 - 500 40.00 / LF 501 - 1000 138.00 / LF Estimated Annual Total 200 42.00 / LF $s,400.00 Page 1 17 Type D Curb and Gutter: 0 - 100 46.00 / LF Construct new per City Detail #213 101 - 250 44.00 / LF 251 - 500 42.00 / LF 501 — 1,000 4o.00 / LF Estimated Annual Total 200 44.00 / LF $8,800.00 4" PCC Sidewalk: Construct new 0 - 250 8.00 / SF per City Detail #400 251 - 500 7.50 /SF 501 — 1,000 5.50 / SF 1,000 + 5.50 / SF Estimated Annual Total 200 8.00 /SF $1,600.00 0 - 5 300.00 / EA Wet-set Truncated Domes (4'X3'): 6 - 15 290.00 / EA 16 - 30 290.00 / EA 31 + 280.00 / EA Estimated Annual Total 5 300.00 / EA $1,500.00 Glue Down Truncated Domes 0 - 5 550.00 / EA (4'x3'): 6 - 15 550.00 / EA 16 - 30 54o.00 / EA 31 + 530.00 / EA Estimated Annual Total 5 55o.00 / EA $2,750.00 Misc. Concrete Flatwork: 0 - 1000 5.50 / SF Construct new per City Detail #213 1,001 —2,500 5.00 /SF2,501 —5,000 4.75 / SF 5,001 + 4.75 /SF Estimated Annual Total 2000 5.00 / SF $10,000.00 TOTAL AMOUNT $88,850.00 TOTAL BID WRITTEN IN WORDS EIGHTY EIGHT THOUSAND EIGHT HUNDRED FIFTY Dollars and ZERO Cents Amount Written in Words. This bid will be awarded based upon the total amount bid as written in words. Where there is a discrepancy between words and figures, WORDS WILL GOVERN. Where there is a discrepancy between item unit price and extended total, UNIT PRICE WILL GOVERN. Page 1 18 Will Contractor mobilize and perform as-needed work for this bid that is less than $2,000.00 for any particular mobilization? Yes or No YES What is your minimum amount of work that bidder will accept for a single mobilization? $1,700.00 Mobilization shall be compensated per Appendix A - A.3. Contractor shall mobilize and complete each work order within 10 calendar days. All mobilization costs shall be considered included in the compensation for the associated bid items. Per Appendix A - B.3, Emergency Work requests will have no minimum and shall be completed within 24 hours of the request. Failure to respond may result in incurred costs, payment deductions, and/or contract termination. Bidders Name: L.C.PAVING&SEALING,INC. Bidder's Address: 330 RANCHEROS DRIVE,STE 208,SAN MARCOS,CA 92069 Date Bid Submitted: 09/13/2017 Page 1 19