Loading...
2020/11/18 Bucknam Infrastructure Group, Inc. FY 20/21 Pavement Management DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A CITY OF MENIFEE PROFESSIONAL SERVICES AGREEMENT FY 20/21 PAVEMENT MANAGEMENT PROGRAM SUPPORT SERVICES THIS PROFESSIONAL SERVICES AGREEMENT("Agreement")is made and effective this Ind day of Dec. , 2020 ("Effective Date") by and between the CITY OF MENIFEE, a California municipal corporation, ("City") and Bucknam Infrastructure Group, a California S- Corporation("Consultant"). City and Consultant may sometimes herein be referred to individually as a"Party" and collectively as the "Parties." SECTION 1. SERVICES. Subject to the terms and conditions set forth in this Agreement, Consultant shall provide to City the services described in the Scope of Services, attached hereto as Exhibit A and incorporated herein by this reference (the "Services"). Consultant will perform subsequent task orders as requested by the Contract Administrator (as defined below), in accordance with the Scope of Services. In the event of a conflict in or inconsistency between the terms of this Agreement and Exhibit A, this Agreement shall prevail. 1.1 Term of Services. The term of this Agreement shall begin on November 18, 2020 and shall end on December 31,2021 unless the term of this Agreement is otherwise terminated or extended as provided for in Section 8. The time provided to Consultant to complete the Services required by this Agreement shall not affect City's right to terminate this Agreement, as provided for in Section 8. 1.2 Standard of Performance. Consultant represents and warrants that Consultant is a provider of first class work and services and Consultant is experienced in performing the Services contemplated herein and, in light of such status and experience, Consultant shall perform the Services required pursuant to this Agreement in the manner and according to the standards observed by a competent practitioner of the profession in which Consultant is engaged in the geographical area in which Consultant practices its profession and to the sole satisfaction of the Contract Administrator. 1.3 Assignment of Personnel. Consultant shall assign only competent personnel to perform the Services pursuant to Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the reassignment of any such persons, Consultant shall, immediately upon receiving notice from City of such desire of City, reassign such person or persons. 1.4 Time. Consultant shall devote such time to the performance of the Services pursuant to this Agreement as may be reasonably necessary to satisfy Consultant's obligations hereunder. 1.5 Authorization to Perform Services. Consultant is not authorized to perform any of the Services or incur any costs whatsoever under the terms of this Agreement until receipt of authorization from the Contract Administrator. 2671/031858-0001 7630376.2 a09/14/20 DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A SECTION 2. COMPENSATION. City hereby agrees to pay Consultant a sum not to exceed SIXTY SIX THOUSAND SEVEN HUNDRED SIXTY EIGHT DOLLARS AND ZERO ($66,768.00) not withstanding any contrary indications that may be contained in Consultant's proposal, for the Services to be performed and reimbursable costs incurred under this Agreement. In the event of a conflict between this Agreement and Exhibit A, regarding the amount of compensation, this Agreement shall prevail. City shall pay Consultant for the Services rendered pursuant to this Agreement at the time and in the manner set forth herein. The payments specified below shall be the only payments from City to Consultant for the Services rendered pursuant to this Agreement. Consultant shall submit all invoices to City in the manner specified herein. Except as specifically authorized in advance by City, Consultant shall not bill City for duplicate services performed by more than one person. 2.1 Invoices. Consultant shall submit invoices monthly during the term of this Agreement, based on the cost for the Services performed and reimbursable costs incurred prior to the invoice date. Invoices shall contain the following information: a. Serial identifications of progress bills; i.e., Progress Bill No. 1 for the first invoice, etc.; b. The beginning and ending dates of the billing period; C. A "Task Summary" containing the original contract amount, the amount of prior billings,the total due this period,the balance available under this Agreement, and the percentage of completion; d. At City's option, for each item in each task, a copy of the applicable time entries or time sheets shall be submitted showing the name of the person performing the Services, the hours spent by each person, a brief description of the Services, and each reimbursable expense; e. The total number of hours of work performed under this Agreement by Consultant and each employee, agent, and subcontractor of Consultant performing the Services hereunder necessary to complete the Services described in Exhibit A; f. Receipts for expenses to be reimbursed; g. The Consultant Representative's signature. Invoices shall be submitted to: City of Menifee Attn: Accounts Payable 29844 Haun Road Menifee, CA 92586 2671/031858-0001 7630376.2 a09/14/20 -2- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A 2.2 Monthly Pam. City shall make monthly payments,based on invoices received, for the Services satisfactorily performed, and for authorized reimbursable costs incurred. City shall have thirty (30) days from the receipt of an invoice that complies with all of the requirements above to pay Consultant. 2.3 Final Payment. City shall pay the last ten percent(10%) of the total amount due pursuant to this Agreement within sixty (60) days after completion of the Services and submittal to City of a final invoice, if all of the Services required have been satisfactorily performed. 2.4 Total Pam. City shall not pay any additional sum for any expense or cost whatsoever incurred by Consultant in rendering the Services pursuant to this Agreement. City shall make no payment for any extra, further, or additional service pursuant to this Agreement. In no event shall Consultant submit any invoice for an amount in excess of the maximum amount of compensation provided above either for a task or for the entirety of the Services performed pursuant to this Agreement,unless this Agreement is modified in writing prior to the submission of such an invoice. 2.5 Hourly. Fees for the Services performed by Consultant on an hourly basis shall not exceed the amounts shown on the fee schedule included with Exhibit A. 2.6 Reimbursable Expenses. Reimbursable expenses are included within the maximum amount of this Agreement. 2.7 Payment of Taxes. Consultant is solely responsible for the payment of employment taxes incurred under this Agreement and any federal or state taxes. 2.8 Payment upon Termination. In the event that City or Consultant terminates this Agreement pursuant to Section 8, City shall compensate Consultant for all outstanding costs and reimbursable expenses incurred for Services satisfactorily completed and for reimbursable expenses as of the date of written notice of termination. Consultant shall maintain adequate logs and timesheets in order to verify costs and reimbursable expenses incurred to that date. SECTION 3. FACILITIES AND EQUIPMENT. Except as otherwise provided, Consultant shall, at its sole cost and expense, provide all facilities and equipment necessary to perform the services required by this Agreement. City shall make available to Consultant only physical facilities such as desks, filing cabinets, and conference space, as may be reasonably necessary for Consultant's use while consulting with City employees and reviewing records and the information in possession of City. The location, quantity, and time of furnishing those facilities shall be in the sole discretion of City. In no event shall City be required to furnish any facility that may involve incurring any direct expense, including but not limited to computer, long-distance telephone or other communication charges, vehicles, and reproduction facilities. 2671/031858-0001 7630376.2 a09/14/20 -3- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A SECTION 4. INSURANCE REQUIREMENTS. Before beginning any work under this Agreement, Consultant, at its own cost and expense, shall procure the types and amounts of insurance checked below and provide Certificates of Insurance, indicating that Consultant has obtained or currently maintains insurance that meets the requirements of this section and which is satisfactory, in all respects, to City. Consultant shall maintain the insurance policies required by this section throughout the term of this Agreement. The cost of such insurance shall be included in Consultant's compensation. Consultant shall not allow any subcontractor, consultant or other agent to commence work on any subcontract until Consultant has obtained all insurance required herein for the subcontractor(s) and provided evidence thereof to City. Verification of the required insurance shall be submitted and made part of this Agreement prior to execution. Consultant acknowledges the insurance policy must cover inter-insured suits between City and other Insureds. 4.1 Workers' Compensation. Consultant shall, at its sole cost and expense, maintain Statutory Workers' Compensation Insurance and Employer's Liability Insurance for any and all persons employed directly or indirectly by Consultant pursuant to the provisions of the California Labor Code. Statutory Workers' Compensation Insurance and Employer's Liability Insurance shall be provided with limits of not less than ONE MILLION DOLLARS ($1,000,000.00) per accident,ONE MILLION DOLLARS ($1,000,000.00)disease per employee, and ONE MILLION DOLLARS ($1,000,000.00) disease per policy. In the alternative, Consultant may rely on a self- insurance program to meet those requirements,but only if the program of self-insurance complies fully with the provisions of the California Labor Code. Determination of whether a self-insurance program meets the standards of the California Labor Code shall be solely in the discretion of the Contract Administrator. The insurer, if insurance is provided, or Consultant, if a program of self- insurance is provided, shall waive all rights of subrogation against City and its officers, officials, employees, and authorized volunteers for loss arising from the Services performed under this Agreement. 4.2 Commercial General and Automobile Liability Insurance. a. General requirements. Consultant, at its own cost and expense, shall maintain commercial general and automobile liability insurance for the term of this Agreement in an amount not less than ONE MILLION DOLLARS ($1,000,000.00) per occurrence, combined single limit coverage,for risks associated with the Services contemplated by this Agreement,TWO MILLION DOLLARS ($2,000,000.00) general aggregate, and TWO MILLION DOLLARS ($2,000,000.00) products/completed operations aggregate. If a Commercial General Liability Insurance or an Automobile Liability Insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the Services to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit. Such coverage shall include but shall not be limited to, protection against claims arising from bodily and personal injury, including death resulting therefrom, and damage to property resulting from the Services contemplated under this Agreement, including the use of hired, owned, and non-owned automobiles. b. Minimum scope of coverage. Commercial general coverage shall be at least as broad as Insurance Services Office Commercial General Liability occurrence form CG 0001. 2671/031858-0001 7630376.2 a09/14/20 -4- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Automobile coverage shall be at least as broad as Insurance Services Office Automobile Liability form CA 0001 Code 2, 8, and 9. No endorsement shall be attached limiting the coverage. C. Additional requirements. Each of the following shall be included in the insurance coverage or added as a certified endorsement to the policy: a. The insurance shall cover on an occurrence or an accident basis, and not on a claims-made basis. b. Any failure of Consultant to comply with reporting provisions of the policy shall not affect coverage provided to City and its officers,employees,agents, and volunteers. 4.3 Professional Liability Insurance. a. General requirements. Consultant, at its own cost and expense, shall maintain for the period covered by this Agreement professional liability insurance for licensed professionals performing the Services pursuant to this Agreement in an amount not less than ONE MILLION DOLLARS ($1,000,000) covering the licensed professionals' errors and omissions. Any deductible or self-insured retention shall be shown on the Certificate. If the deductible or self-insured retention exceeds TWENTY-FIVE THOUSAND DOLLARS ($25,000), it must be approved by City. b. Claims-made limitations. The following provisions shall apply if the professional liability coverage is written on a claims-made form: a. The retroactive date of the policy must be shown and must be no later than the commencement of the Services. b. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after the expiration or termination of this Agreement or completion of the Services, so long as commercially available at reasonable rates. C. If coverage is canceled or not renewed and it is not replaced with another claims-made policy form with a retroactive date that precedes the Effective Date of this Agreement, Consultant must provide extended reporting coverage for a minimum of five (5) years after the expiration or termination of this Agreement or the completion of the Services. Such continuation coverage may be provided by one of the following: (1) renewal of the existing policy; (2) an extended reporting period endorsement; or (3)replacement insurance with a retroactive date no later than the commencement of the Services under this Agreement. City shall have the right to exercise, at Consultant's sole cost and expense, any extended reporting provisions of the policy, if Consultant cancels or does not renew the coverage. d. A copy of the claim reporting requirements must be submitted to City prior to the commencement of the Services under this Agreement. 2671/031858-0001 7630376.2 a09/14/20 -5- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A 4.4 All Policies Requirements. a. Acceptability of insurers. All insurance required by this Section is to be placed with insurers with a Bests' rating of no less than A:VII and admitted in California. b. Verification of coverage. Prior to beginning the Services under this Agreement, Consultant shall furnish City with Certificates of Insurance, additional insured endorsement or policy language granting additional insured status complete certified copies of all policies, including complete certified copies of all endorsements. All copies of policies and certified endorsements shall show the signature of a person authorized by that insurer to bind coverage on its behalf. The Certificate of Insurance must include the following reference: FY 20/21 PAVEMENT MANAGEMENT PROGRAM SUPPORT SERVICES. The name and address for Additional Insured endorsements, Certificates of Insurance and Notice of Cancellation is: City of Menifee, 29844 Haun Road, Menifee, CA 92586. City must be endorsed as an additional insured for liability arising out of ongoing and completed operations by or on behalf of Consultant. C. Notice of Reduction in or Cancellation of Coveraize. Consultant shall provide written notice to City within ten (10) working days if. (1) any of the required insurance policies is terminated; (2) the limits of any of the required polices are reduced; or(3)the deductible or self-insured retention is increased. d. Additional insured; primary insurance. City and its officers, employees, agents, and authorized volunteers shall be covered as additional insureds with respect to each of the following: liability arising out of the Services performed by or on behalf of Consultant, including the insured's general supervision of Consultant; products and completed operations of Consultant, as applicable; premises owned, occupied, or used by Consultant; and automobiles owned, leased, or used by Consultant in the course of providing the Services pursuant to this Agreement. The coverage shall contain no special limitations on the scope of protection afforded to City or its officers, employees, agents,or authorized volunteers. The insurance provided to City as an additional insured must apply on a primary and non-contributory basis with respect to any insurance or self-insurance program maintained by City. Additional insured status shall continue for one (1) year after the expiration or termination of this Agreement or completion of the Services. A certified endorsement must be attached to all policies stating that coverage is primary insurance with respect to City and its officers, officials, employees, and volunteers, and that no insurance or self-insurance maintained by City shall be called upon to contribute to a loss under the coverage. e. Deductibles and Self-insured Retentions. Consultant shall obtain the written approval of City for the self-insured retentions and deductibles before beginning any of the Services. During the term of this Agreement, only upon the prior express written authorization of the Contract Administrator, Consultant may increase such deductibles or self- insured retentions with respect to City, its officers, employees, agents, and volunteers. The Contract Administrator may condition approval of an increase in deductible or self-insured 2671/031858-0001 7630376.2 a09/14/20 -6- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A retention levels with a requirement that Consultant procure a bond guaranteeing payment of losses and related investigations, claim administration, and defense expenses that is satisfactory in all respects to each of them. f. Subcontractors. Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and certified endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein. g. Variation. The Contract Administrator may,but is not required to, approve in writing a variation in the foregoing insurance requirements, upon a determination that the coverage, scope, limits, and forms of such insurance are either not commercially available, or that City's interests are otherwise fully protected. 4.5 Remedies. In addition to any other remedies at law or equity City may have if Consultant fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City may, at its sole option, exercise any of the following remedies,which are alternatives to other remedies City may have and are not the exclusive remedy for Consultant's breach: a. Obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under this Agreement; b. Order Consultant to stop work under this Agreement or withhold any payment that becomes due to Consultant hereunder, or both stop work and withhold any payment,until Consultant demonstrates compliance with the requirements hereof; and/or C. Terminate this Agreement. SECTION 5. INDEMNIFICATION. 5.1 Indemnification for Professional Liability. Where the law establishes a professional standard of care for performance of the Services, to the fullest extent permitted by law,Consultant shall indemnify,protect,defend(with counsel selected by City),and hold harmless City and any and all of its officers, employees, officials, volunteers, and agents from and against any and all claims, losses, costs, damages, expenses, liabilities, liens, actions, causes of action (whether in tort, contract, under statute, at law, in equity, or otherwise) charges, awards, assessments, fines, or penalties of any kind (including reasonable consultant and expert fees and expenses of investigation, costs of whatever kind and nature and, if Consultant fails to provide a defense for City, the legal costs of counsel retained by City) and any judgment (collectively, "Claims")to the extent same are caused in whole or in part by any negligent or wrongful act, error, or omission of Consultant, its officers, agents, employees, or subcontractors (or any entity or individual that Consultant shall bear the legal liability thereof) in the performance of professional services under this Agreement. 5.2 Indemnification for Other than Professional Liability. Other than in the performance of professional services and to the full extent permitted by law, Consultant shall indemnify, protect, defend (with counsel selected by City), and hold harmless City, and any and 2671/031858-0001 7630376.2 a09/14/20 -7- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A all of its officers, employees,officials,volunteers, and agents from and against any and all Claims, where the same arise out of, are a consequence of, or are in any way attributable to, in whole or in part, the performance of this Agreement by Consultant or by any individual or entity for which Consultant is legally liable, including but not limited to officers, agents, employees or subcontractors of Consultant. 5.3 Limitation of Indemnification for Design Professionals. Notwithstanding any provision of this Section 5 to the contrary, design professionals are required to defend and indemnify City only to the extent permitted by Civil Code Section 2782.8. The term "design professional" as defined in Section 2782.8, is limited to licensed architects, licensed landscape architects,registered professional engineers,professional land surveyors, and the business entities that offer such services in accordance with the applicable provisions of the California Business and Professions Code. 5.4 Limitation of Indemnification. The provisions of this Section 5 do not apply to claims occurring as a result of City's sole or active negligence. The provisions of this Section 5 shall not release City from liability arising from gross negligence or willful acts or omissions of City or any and all of its officers, officials, employees, and agents acting in an official capacity. SECTION 6. STATUS OF CONSULTANT. 6.1 Independent Contractor. At all times during the term of this Agreement,Consultant shall be an independent contractor and shall not be an employee of City. City shall have the right to control Consultant only insofar as the results of the Services rendered pursuant to this Agreement and assignment of personnel pursuant to Subparagraph 1.3; however, otherwise City shall not have the right to control the means by which Consultant accomplishes the Services rendered pursuant to this Agreement. The personnel performing the Services under this Agreement on behalf of Consultant shall at all times be under Consultant's exclusive direction and control. Consultant shall not at any time or in any manner represent that it or any of its officers, employees, or agents is in any manner officers, officials, employees,or agents of City. Consultant shall not incur or have the power to incur any debt, obligation, or liability whatever against City, or bind City in any manner. Except for the fees paid to Consultant as provided in this Agreement, City shall not pay salaries,wages,or other compensation to Consultant for performing the Services hereunder for City. City shall not be liable for compensation or indemnification to Consultant for injury or sickness arising out of performing the Services hereunder. Notwithstanding any other City, state,or federal policy,rule,regulation,law,or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing services under this Agreement shall not qualify for or become entitled to any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in the California Public Employees Retirement System ("PERS") as an employee of City and entitlement to any contribution to be paid by City for employer contributions and/or employee contributions for PERS benefits. SECTION 7. LEGAL REQUIREMENTS. 7.1 Governing Law. The laws of the State of California shall govern this Agreement. 2671/031858-0001 7630376.2 a09/14/20 -g' DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A 7.2 Compliance with Applicable Laws. Consultant and any subcontractor shall comply with all applicable local, state, and federal laws and regulations applicable to the performance of the work hereunder. Consultant shall not hire or employ any person to perform work within City or allow any person to perform the Services required under this Agreement unless such person is properly documented and legally entitled to be employed within the United States. Any and all work subject to prevailing wages, as determined by the Director of Industrial Relations of the State of California, will be the minimum paid to all laborers, including Consultant's employee and subcontractors. It is understood that it is the responsibility of Consultant to determine the correct scale. The State Prevailing Wage Rates may be obtained from the California Department of Industrial Relations ("DIR") pursuant to California Public Utilities Code, Sections 465, 466, and 467 by calling 415-703-4774. Appropriate records demonstrating compliance with such requirement shall be maintained in a safe and secure location at all times, and readily available at City's request. Consultant shall indemnify, defend, and hold City and its elected and appointed boards, members, officials, officers, agents, representatives, employees, and volunteers harmless from and against any liability, loss, damage, cost or expenses (including but not limited to reasonable attorneys' fees, expert witness fees, court costs, and costs incurred related to any inquiries or proceedings) arising from or related to (i) the noncompliance by Consultant or any party performing the Services of any applicable local, state, and/or federal law, including,without limitation, any applicable federal and/or state labor laws (including, without limitation, the requirement to pay state prevailing wages and hire apprentices); (ii)the implementation of Section 1781 of the Labor Code, as the same may be amended from time to time, or any other similar law; and/or (iii) failure by Consultant or any party performing the Services to provide any required disclosure or identification as required by Labor Code Section 1781, as the same may be amended from time to time, or any other similar law. It is agreed by the Parties that, in connection with performance of the Services, including, without limitation, any and all public works (as defined by applicable law), Consultant shall bear all risks of payment or non-payment of prevailing wages under California law and/or the implementation of Labor Code Section 1781, as the same may be amended from time to time, and/or any other similar law. Consultant acknowledges and agrees that it shall be independently responsible for reviewing the applicable laws and regulations and effectuating compliance with such laws. Consultant shall require the same of all subcontractors. 7.3 Licenses and Permits. Consultant represents and warrants to City that Consultant and its employees, agents, and any subcontractors have all licenses, permits, qualifications, and approvals of whatsoever nature that are legally required to practice their respective professions. Consultant represents and warrants to City that Consultant and its employees, agents, and subcontractors shall, at their sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals that are legally required to practice their respective professions. In addition to the foregoing,Consultant and any subcontractors shall obtain and maintain during the term of this Agreement valid Business Licenses from City. SECTION 8. TERMINATION AND MODIFICATION. 8.1 Termination. City may cancel this Agreement at any time and without cause upon written notification to Consultant. 8.2 Termination by Consultant. Consultant may cancel this Agreement upon 30 days' written notice to City. 2671/031858-0001 7630376.2 a09/14/20 -9- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A 8.3 Consequences of Termination. In the event of termination, Consultant shall be entitled to compensation for the Services performed up to the date of termination; City, however, may condition payment of such compensation upon Consultant delivering to City any or all documents, photographs, computer software, video and audio tapes, and other materials provided to Consultant or prepared by or for Consultant or City in connection with this Agreement. 8.4 Extension. City may, in its sole and exclusive discretion, extend the end date of this Agreement beyond that provided for in Subsection 1.1. Any such extension shall require a written amendment to this Agreement, as provided for herein. Consultant understands and agrees that, if City grants such an extension, City shall have no obligation to provide Consultant with compensation beyond the maximum amount provided for in this Agreement. Similarly, unless authorized by the Contract Administrator, City shall have no obligation to reimburse Consultant for any otherwise reimbursable expenses incurred during the extension period. 8.5 Amendments. The Parties may amend this Agreement only by a writing signed by all the Parties. 8.6 Assigm-nent and Subcontracting. City and Consultant recognize and agree that this Agreement contemplates personal performance by Consultant and is based upon a determination of Consultant's unique personal competence, experience, and specialized personal knowledge. Moreover, a substantial inducement to City for entering into this Agreement was and is the professional reputation and competence of Consultant. Consultant may not assign this Agreement or any interest therein without the prior written approval of the Contract Administrator. Consultant shall not subcontract any portion of the performance contemplated and provided for herein, other than to the subcontractors noted in Consultant's proposal, without prior written approval of the Contract Administrator. In the event that key personnel leave Consultant's employ, Consultant shall notify City immediately. 8.7 Survival. All obligations arising prior to the expiration or termination of this Agreement and all provisions of this Agreement allocating liability between City and Consultant shall survive the expiration or termination of this Agreement. 8.8 Options upon Breach by Consultant. If Consultant materially breaches any of the terms of this Agreement, City's remedies shall include, but not be limited to, any or all of the following: a. Immediately terminate this Agreement; b. Retain the plans, specifications, drawings, reports, design documents, and any other work product prepared by Consultant pursuant to this Agreement; C. Retain a different consultant to complete the Services described in Exhibit A; and/or d. Charge Consultant the difference between the cost to complete the Services described in Exhibit A that is unfinished at the time of breach and the amount that City would have paid Consultant pursuant to Section 2 if Consultant had completed the Services. 2671/031858-0001 7630376.2 a09/14/20 -1 0' DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A SECTION 9. KEEPING AND STATUS OF RECORDS. 9.1 Records Created as Part of Consultant's Performance. All reports, data, maps, models, charts, studies, surveys, photographs, memoranda, plans, studies, specifications, records, files, or any other documents or materials, in electronic or any other form that Consultant prepares or obtains pursuant to this Agreement and that relate to the matters covered hereunder shall be the property of City. Consultant hereby agrees to deliver those documents to City upon the expiration or termination of this Agreement. It is understood and agreed that the documents and other materials, including but not limited to those described above,prepared pursuant to this Agreement are prepared specifically for City and are not necessarily suitable for any future or other use. Any use of such documents for other projects by City shall be without liability to Consultant. City and Consultant agree that,until final approval by City, all data,plans, specifications,reports, and other documents are confidential and will not be released to third parties without prior written consent of both Parties unless required by law. 9.2 Licensing of Intellectual Property. This Agreement creates a non-exclusive and perpetual license for City to copy,use,modify,reuse,or sublicense any and all copyrights,designs, rights of reproduction, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, test data, survey results, models, renderings, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings, digital renderings, or data stored digitally,magnetically, or in any other medium,which are prepared or caused to be prepared by Consultant under this Agreement ("Documents and Data"). Consultant shall require all subcontractors to agree in writing that City is granted a non- exclusive and perpetual license for any Documents and Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents and Data. Consultant makes no such representation and warranty in regard to Documents and Data which were prepared by design professionals other than Consultant or provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. 9.3 Consultant's Books and Records. Consultant shall maintain any and all ledgers, books of account,invoices,vouchers,canceled checks, and other records or documents evidencing or relating to charges for the Services or expenditures and disbursements charged to City under this Agreement for a minimum of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records shall be maintained in accordance with generally accepted accounting principles and shall be clearly identified and readily accessible. 9.4 Inspection and Audit of Records. Any records or documents that Section 9.3 of this Agreement requires Consultant to maintain shall be made available for inspection, audit, and/or copying at any time during regular business hours, upon oral or written request of City. Under California Government Code Section 8546.7, if the amount of public funds expended under this Agreement exceeds TEN THOUSAND DOLLARS ($10,000.00), this Agreement shall be subject to the examination and audit of the State Auditor, at the request of City or as part of any audit of City, for a period of three (3)years after final payment under this Agreement. 2671/031858-0001 7630376.2 a09/14/20 -1 1- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A SECTION 10. MISCELLANEOUS PROVISIONS. 10.1 Attorneys' Fees. If either Party to this Agreement brings any action, including an action for declaratory relief,to enforce or interpret the provision of this Agreement, the prevailing Party shall be entitled to reasonable attorneys' fees and expenses including costs, in addition to any other relief to which that Party may be entitled; provided, however, that the attorneys' fees awarded pursuant to this Section shall not exceed the hourly rate paid by City for legal services multiplied by the reasonable number of hours spent by the prevailing Party in the conduct of the litigation. The court may set such fees in the same action or in a separate action brought for that purpose. 10.2 Applicable Law; Venue. The internal laws of the State of California shall govern the interpretation and enforcement of this Agreement. In the event that either Parry brings any action against the other under this Agreement, the Parties agree that trial of such action shall be vested exclusively in Riverside County. 10.3 Severability. If any provision of this Agreement is held invalid, the remainder of this Agreement shall not be affected thereby and all other parts of this Agreement shall nevertheless be in full force and effect. 10.4 Section Headings and Subheadings. The section headings and subheadings contained in this Agreement are included for convenience only and shall not limit or otherwise affect the terms of this Agreement. 10.5 No Implied Waiver of Breach. The waiver of any breach of a specific provision of this Agreement does not constitute a waiver of any other breach of that term or any other term of this Agreement. 10.6 Successors and Assigns. The provisions of this Agreement shall inure to the benefit of and shall apply to and bind the successors and assigns of the Parties. 10.7 Consultant Representative. All matters under this Agreement shall be handled for Consultant by Peter Bucknam ("Consultant's Representative"). The Consultant's Representative shall have full authority to represent and act on behalf of Consultant for all purposes under this Agreement. The Consultant's Representative shall supervise and direct the Services, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences, and procedures and for the satisfactory coordination of all portions of the Services under this Agreement. 10.8 City Contract Administration. This Agreement shall be administered by a City employee, Run Chen, Senior Engineer ("Contract Administrator"). All correspondence shall be directed to or through the Contract Administrator or his designee. The Contract Administrator shall have the power to act on behalf of City for all purposes under this Agreement. Unless otherwise provided in this Agreement, Consultant shall not accept direction or orders from any person other than the Contract Administrator or his designee. 10.9 Notices. Any written notice to Consultant shall be sent to: 2671/031858-0001 7630376.2 a09/14/20 -12- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Bucknam Infrastructure Group Attn: Peter Bucknam 3548 Seagate Way, Suite 230 Oceanside, CA 92056 Any written notice to City shall be sent to the Contract Administrator at: City of Menifee 29844 Haun Road Menifee, CA 92586 Attn: Run Chen, Senior Engineer with a copy to: City Clerk City of Menifee 29844 Haun Road Menifee, CA 92586 10.10 Professional Seal. Where applicable in the determination of the Contract Administrator,the first page of a technical report, first page of design specifications,and each page of construction drawings shall be stamped/sealed and signed by the licensed professional responsible for the report/design preparation. The stamp/seal shall be in a block entitled"Seal and Signature of Registered Professional with report/design responsibility," as in the following example. Seal and Signature of Registered Professional with report/design responsibility. 10.11 Rights and Remedies. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the Parties are cumulative and the exercise by either Party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other Party. 10.12 Integration. This Agreement, including the scope of services attached hereto and incorporated herein as Exhibit A,represents the entire and integrated agreement between City and Consultant and supersedes all prior negotiations, representations, or agreements, either written or oral. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either Party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. 10.13 Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one agreement. 2671/031858-0001 7630376.2 a09/14/20 -13- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A 10.14 Execution of Contract. The persons executing this Agreement on behalf of each of the Parties hereto represent and warrant that(i) such Party is duly organized and existing, (ii)they are duly authorized to execute and deliver this Agreement on behalf of said Party, (iii)by so executing this Agreement, such Party is formally bound to the provisions of this Agreement, and (iv)that entering into this Agreement does not violate any provision of any other Agreement to which said Party is bound. 10.15 Nondiscrimination. Consultant covenants that,by and for itself,its heirs,executors, assigns, and all persons claiming under or through them,that in the performance of this Agreement there shall be no discrimination against or segregation of, any person or group of persons on account of any impermissible classification including, but not limited to, race, color, creed, religion, sex, marital status, sexual orientation, national origin, or ancestry. 10.16 No Third Party Beneficiaries. With the exception of the specific provisions set forth in this Agreement, there are no intended third-party beneficiaries under this Agreement and no such other third parties shall have any rights or obligations hereunder. 10.17 Nonliability of City Officers and Employees. No officer, official, employee, agent, representative, or volunteer of City shall be personally liable to Consultant, or any successor in interest, in the event of any default or breach by City or for any amount which may become due to Consultant or to its successor, or for breach of any obligation of the terms of this Agreement. 10.18 No Undue Influence. Consultant declares and warrants that no undue influence or pressure is used against or in concert with any officer or employee of City in connection with the award,terms or implementation of this Agreement, including any method of coercion,confidential financial arrangement, or financial inducement. No officer or employee of City shall receive compensation, directly or indirectly, from Consultant, or from any officer, employee, or agent of Consultant,in connection with the award of this Agreement or any work to be conducted as a result of this Agreement. 10.19 No Benefit to Arise to City Employees. No member, officer, or employee of City, or their designees or agents, and no public official who exercises authority over or has responsibilities with respect to this Agreement during his/her tenure or for one (1)year thereafter, shall have any interest, direct or indirect, in any agreement or sub-agreement, or the proceeds thereof, for the Services to be performed under this Agreement. [Signatures on Following Page] 2671/031858-0001 7630376.2 a09/14/20 -14- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A IN WITNESS WHEREOF, the Parties hereto have executed and entered into this Agreement as of the Effective Date. CITY OF MENIFEE CONSULTANT DocuSigned by: n -DocuSigned by: Armando G. Villa, City Manager Peter BBucknam, President Ele'e7ASigned by: DocuSigned by: �a�c , Q. 9�t aun waviiA� putr 1l"w Sarah A. Manwaring, City Clerk Peter Buckram, Secretary 1Ad 45 to Form: F 31T Jeffrey T. Melching, City Attorney [Corporation must have two signatures] 2671/031858-0001 7630376.2 a09/14/20 -15- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A EXHIBIT A SCOPE OF SERVICES Comprehensive Pavement Management Program Support Services in the amount not to exceed SIXTY SIX THOUSAND SEVEN HUNDRED SIXTY EIGHT DOLLARS AND ZERO ($66,768.00) as further detailed in the following pages. 2671/031858-0001 7630376.2 a09/14/20 EXHIBIT A DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Approach/Scope of Work k Qette�� Project Understanding/Approach We have defined a detailed scope of work in accordance to the City's goals/RFP; 1. Project Implementation;2.Client Satisfaction;3.Project Schedule;4.Scope of Work; 1)Project Management&Administration TASK 1.1: Project Kickoff The first step in implementing a successful pavement management program (PMP)truly resides in frequent communication and timely scheduled data updates.It will be essential to assistthe City in the continued,proactive management and application of your PMPto maintain and protect the street improvements that have been applied over the past several years. To achieve this,Bucknam will assist the City by delivering on the following project tasks: • Selection of StreetSaver or MicroPAVER; • Cost effective Arterial pavement inspections(325 miles); • Proactive Arterial,Residential and Alley rehabilitation programs; • Common-sense,District zone based Slurry Seal Program;and • Annual,proactive stewardship of the PMP that will ensure its continued success. Our team will set a Project Kickoff meeting to further discuss and review in detail the expectations/goals of the project,technical approach,zone maintenance,finalization of the scope of work and the review of the budget/schedule. This effort will continue to build upon the consensus between the Public Works and Maintenance departments as well as build stronger ARTERIAL and RESIDENTIAL maintenance programs/schedules. The first key topics to be discussed will include the review and assessment of the existing PMP pavement plan/data, survey areas (based on recent maintenance work and schedules), new construction, data quality and condition, current pavement procedures, historical expenditure levels,and desired service levels. Additionally,the City wishes to evaluate the effectiveness and expansion of their PMS software to include additional infrastructure asset data collection. Due to Buckram's extensive experience with numerous PMS software's we will perform a comprehensive, pro-bono evaluation of MicroPAVER,StreetSaver and other routinely utilized software's. Our recommendation(s) will cover costs, cost implementation, expansion of street and ROW assets,maintenance&operation of the software and GIS compatibility. TASK 1.2: Project Status Meetings-Quality Control Program Status Meetings and Progress Reports • 1) Minimum of three meetings during the project (kickoff, field and status meetings); 2) Field review meetings; 3) Monthly progress status reports will be delivered to City project manager that demonstrate expended budget, budget remaining,%complete,etc.. City of Menifee 3-1 2020 Pavement Management Program Update 2671/031858-0001 7630376.2 a00/00/00 EXHIBIT A DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Approach/Scope of Work Project Management System/Quality Assurance—Quality Control(QA/QC) We will use a statistical sampling approach for measuring the quality of our field technician's work. In this manner, 10 percent(32.5 miles out of 325 miles)of the original surveys will be re- surveyed by an independent surrey crew,supervised by a field supervisor,and the results will be compared to the original surveys. Our QC process involves checking the field crews'work in a "blind study"fashion. Quality control checks will be performed at the end of each survey week,this includes PCI Variance reporting (2018 inspections vs. 2020 inspections). This will ensure that all field personnel are properly collecting distresses and pavement quantities for all street segments. Since we are collecting distress information on our field Tablets with the Menifee PMP database live, our staff will perform several quality control tests within the pavement management software using a sample set of the City of Menifee's street distress data. This will ensure that all system and analysis settings as well as City recommendations and standards are being followed. Over the past year,Bucknam has submitted twenty-one(21) METRO compliant reports for LA municipalities,they include: Los Angeles County PMP Clierds Pomona Alhambra EI Segundo ..............................._........'............................................................................i............................................................................. Duarte Cu Ive r City Lomita ..................................................................i........._..._..........................................................._i............................................................................. Rancho Palos Verdes Palmdale South Gate ._................... South Pasadena La Habra Heights Sierra Madre - -- Monterey Park Hermosa Beath South Pasadena -,... ....... -- ....... .._....................................................................... Compton Lynwood Norwalk ..........:_.........................................................................:..............................-...................................-........ La Verne Rosemead Bellflower Over the past year, Bucknam has submitted seventeen (17) OCTA compliant reports for OC municipalities,they include: Orange Brea Irvine RSM - . -.........................................................................'...............-........................................................_'-..................-...-...-............................................. Costa Mesa Aliso Viejo Tustin ......................................................-...-...-...-...._'..................-........................................................i_..................-..._..._..._........................................ Laguna Hills Laguna Beach Westminster .......................................................................................................................................................I_..._...............,....,.........................................-...... Fountain Valley San Juan Capistrano La Habra .�.....................................................................�.......................................,_..._..._........._.............................................._...... Huntington Beach Newport Beach Fullerton ........_,.............................._........ ................................_,_........................................................... ............. La Palma San Clemente Bucknam is currently working with six(6)Riverside agencies,they include: Murrieta,Menifee, Lake Elsinore,Hemet La Cresta HOA and Rancho La Quinta. Our field surveys follow the accepted ASTM D6433-20 walking requirements and are proven and continue to be utilized for our So Cal clients shown above. Prior to survey,a copy of the QA/QC plan utilized by our staff during the project will be submitted along with the PMP certification documents. Our staff attends the OCTA Micro PAVER/StreetSaver PMP Distress Training Classes held each winter (FY 2011 thru 2020). In February 2020 our staff was acknowledged as "qualified City of ivieniiee 3-2 2020 Pavement Management Program Ul;. 2671/031858-0001 7630376.2 a00/00/00 '2- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Approach/Scope of Work inspectors and firm" to prepare Pavement Management Plans compliant with the OCTA Countywide Pavement Management Guidelines(this compliance runs through June 2022). Additionally, Bucknam is listed as a pre-qualified firm through MTC StreetSaver (see https://www.streetsaver.com/support/partners/consultant) Registered Engineer/Lead Engineer Mr.Steve Buckram,P.E.will supervise all operations, review all completed data and prepare and sign a final report incorporating the results of our pavement evaluation and conditions. We will provide engineered recommendations for pavement rehabilitation and replacement based upon field data and analysis. Deliverable: Monthly Project Status reports/budget reports, field review and project status meetings,QA/QC Plan 2)Client Satisfaction TASK2.1: Project Deliverables Shown throughout our Scope of Work,each Task is summarized with project deliverables. Client satisfaction will derivefrom frequent communication with the Project Managerand key staff members from the Public Services/Engineering department. Project success is created by delivering on three main factors; 1)Adherence to scope tasks and deliverables 2)Performing to the standard set by the Project Schedule;and 3) Controlling costs. Our Project Manager will follow each of these factors throughout the duration of the project 3)Project Schedule TASK3.1: Work Flow/Committed Project Schedule Our project schedule shows each major task identified in our scope of work, as well as quality control milestones and meetings. Bucknam currently has ample staff to apply to this project in orderto meet an aggressive schedule(two/three field technicians will drive the proactive schedule). Our Critical Path Method (CPM) project schedule shows each major task identified in our scope of work, as well as quality control milestones and meetings. See key milestone dates from the project schedule below: • Notice-to-Proceed,Project Kickoff—November 1,2020 • Survey Completion—mid-January,2021 • Delivery of draft PMP—mid-Jar uary,2021 • City comments returned to Consultant—late January,2021 • Delivery of City CIP Final Report—late January(prior to 1-31-21) City of Menifee 3-3 2020 Pavement Management Program Update 2671/031858-0001 7630376.2 a00/00/00 '3- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Approach/Scope of Work o Menifee CIP data/Final Report, reporting and revenue projections will be submitted by January 2021 o All necessary PMP data,reporting and revenue projections will be submitted prior to January,2021 • Implementation of PMP database-Any time after acceptance of Final PMP �. w . axk3.�-woR 9ar+l[ommhM rtNatbtlrd,M .Iw atl�.E nt xKpesilprva 3uxiles 93&tlµa+YR 1ytaM RpenM¢ JWe�v .... ........ ........... ......... ti ..... " ..... .. .... ..... .. ... .... ... alnnn�A anal civ x=.00r. R ' 4)Scope of Services TASK 4.1: Update Maintenance and Rehabilitation History The City will provide Bucknam a complete listing of all completed work (overlay, slurry, etc.) in order to update specific section work histories and PCI ratings. Bucknam will review all maintenance and rehabilitation projects completed and/or scheduled by the City since the last update in 2018;this will include work history updates on arterial,collectors and locals. Our staff will enter the necessary work history updates as mentioned above (i.e. data entry of maintenance/rehabilitation activities) into your PMS software. Once the project is completed, our staff will upload the necessary PMP database files at the City. Deliverable:Update PMP data,Work History report TASK 4.2: Pavement Condition Surveys Arterial Street Survey First and foremost, the assessment of the City's pavement segmentation is the one of the key priorities for this project. With two plus years since the City performed inspections it will be essential to verify that all Arterial/Local segmentation is up-to-date and that section SF quantities are accurate and reliable. Bucknam will audit the PMP segmentation apply necessary "splits- combines"and/or add new sections as necessary. City of Menifee 3-4 2020 Pavement Management Program Updat 2671/031858-0001 7630376.2 a00/00/00 -4- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Approach/Scope of Work Once the pavement segmentation has been assessed and verified,the necessary inspections will be performed. Our survey methodology will include one or a combination of the following approaches based on ASTM D6433-20 and the City's cost/benefit analysis: 1. 2020 PMP Survey-Walking-All sections are surveyed through walking methodologies. Distress types will be collected based upon actual surface conditions and physical characteristics of the segment. Surveying methods will be conducted by remaining consistent with ASTM D6433-20&the Army Corp of Engineers sampling guidelines while being flexible to current City requirements. All sample locations are observed through walking surveys(edge of pavement to edge of pavement); additional street factors such as unique distress areas found outside our sample areas will be recorded. According to the City previous 2018 biennial survey schedule,Buckram will continue to follow the City's"even-year"survey process with the following su rvey: • 2020 Citywide Survey-The inspection of approximately 325 miles of Arterial and Collector segments; o We have demonstrated our Optional Digital Roadway Imaging technology that will allow the City to perform the necessary PMP surveys as well as collect additional street and right-of-way assets through one survey(see Task 5.1); • Recent overlay rehabilitation/reconstruction will reduce total mileage of survey— TBD;and • No private streets will be surveyed underthis effort. For all surveys,the use of our PMP-Tablet units allows our staff to collect pavement data with the City of Menifee's PMP database live in the field. At the end of the day all electronic data is transferred to our office for quality control and management. Our MicroPAVER/StreetSaver Tablet methodology sets us apart from the competition since we are using a paper-less inventory process to enter data;this in turn generates cost savings to enhance the project schedule and other portions of the project such as CIP reporting, PMP software training,and on-call services. Roadway Verification Survey-A listing of the field attribute data that is updated/verified during the survey for the pavement managementdatabase is listed below: 1. Field Attribute Data(updated and/or verifiedl From/to,indicating the assigned limits of the section,sample test areas,street name, �3 Street ranking indicating local,alley,arterial,collector,#of lanes,surface type PCI Variance reporting for previous inspections vs.2020 PCI inspections �3 Segment quantities,indicating the length,width,and total true area of the section ADTvolumes(if available from previous reports or current City documents) 2. Conditional data will be evaluated for all street segments and will include: u¢y asp ivieFillee 3-5 2020 Pavement Management Program Updat,_ 2671/031858-0001 7630376.2 a00/00/00 'S— DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Approach./Scope of Work ASTM 20 AC&19 PCC distresses by type,severity and sample area PCI ratings(0-100),taking into account the surface condition,level of distress We welcome staff from the City to join our surveys. All pavement data will be entered o K„ into the City's current licensed PMP software. If the City has not obtained the most recent —�— version of the Micro PAVER/StreetSaver software we will assist the City in purchasing the software upgrade(see Task4.6). All items 0 e cu l xl +i I• listed above will be maintained by our staff Y11�1 F=r ei tl ^ for the duration of this project. Data management will be performed in-house at yd "" ?ILzJL'_i u our Oceanside office. A t the completion of •m': — - the project,the PMP database will be placed LEE.;. ?IFJV l within your information services network. iai❑lI 3. Section Distress and PCI Reporting - S Upon 50% and 100% completion of the required condition surveys, we will prepare draft PCI Reports and PCI GIS maps that document the conditions of all pavement segments. Bucknam will produce a "PCI Variance Report" that will demonstrate PCI variances comparing previous PCI's vs.2020 walking PCl's. This report will allow staff to identify large variances caused by inspection issues,work history impacts and other field survey factors. Additionally,this report will provide the necessary information within MicroPAVER/StreetSaver for the City to use and implement projected street rehabilitation and maintenance projects. Included in the report will be updated pavement performance curves and maintenance decision models. The City and our staff will review the PCI reports to ensure that all inventory data is correct and the project is running smoothly. Our PCI reporting will include: • PCI report-Sorted by Name (A to Z),PCI Order(0-100),Zone(1,2,3,etc.) • Pavement segment and PCI"Variance Report" • Condition Report Analysis for each segment • Work history report • GIS Maps presenting PCI finding by zone and by section Once the City has reviewed, assessed and commented on the draft report, we will address all comments made and deliver the final reports. Deliverable:Citywide PCI reports,updated PMP database. TASK 4.3: Budgetary Analysis/Pavement Improvement Report We will assist the City in developing the most cost-effective preventative maintenance,repair and rehabilitation (M & R) strategies possible. This will be accomplished by meeting with the City to discuss and strategize maintenance activities that are currently being used by the City. We will City of Menifee 3-6 2020 Pavement Management Program Update 2671/031858-0001 7630376.2 a00/00/00 '6— DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Approach/Scope of Work conduct an historical and prospective analysis on the conditional and financial impact these practices have on the pavement network. Based on our fiscal and deterioration analysis, we will present our results and recommendations to City staff. This analysis will become an essential building blockforthe biennial submittals and Public Works CIP programs. Our staff will review the Menifee database deterioration curves that have been developed based on historical pavement condition inspections,surface type,work histories and road classification. The curves will be updated based on 2020 pavement conditions. Maintenance strategies that are typically reviewed are rehabilitation and reconstruction (R&R), localized maintenance, grinding, slurry seals, chip/cape seals, AC on PCC patching and overlays, the expected improvement in pavement condition,the life-cycle extension that would result and the unit costs for maintenance. All maintenance practices/unit costs will be integrated into software and will be derived from the most recent construction bids for pavement rehabilitation. We will account for inflation rates when long-term revenues projections are made. Our staffwill also review and recommend an updateto the existing District/Zone residential cycle; this will allow us to proactively schedule localized maintenance efforts throughout the CIP. Our Project Manager and Principal will work closely with City in defining repair and rehabilitation strategies during each fiscal year(i.e.2020-2027). Once the repair/rehabilitation strategies have been defined, the identification of a seven year Forecasted Maintenance schedule will be generated. The recommended budget scenarios will be identified on the basis of several criteria: • Assessment and review of the City's Pavement CIP • Present pavement conditions; Desired levels of service and available resources • Projected/Forecasted PCI's per section • Cost benefit of individual strategies(e.g.maintain PCI in 7-years,etc.) • Scheduling with the City's major CIP projects(water,sewer,etc.) • Future routine maintenance needs based on projected deterioration rates • Renewed Measure M and AHRP objectives and improving citywide weighted PCI The primary emphasis of this task is to maximize the scheduling of street maintenance using the most cost-effective strategies available and to king into account a life-cycle cost analysis.A working "draft"Final Report will be generated for City staff to review. The report will include an executive summary,the PCI Report as well as draft budgetary findings and recommendations. TASK 4.4: Final CIP Report/Forecasted Maintenance Reports We will deliver the Final Report to the City which will be essential for staff reference and use as well as presented in away that is beneficial for elected officials/upper management. The report will be prepared in a format that uses the information delivered by the PMS software in conjunction with the information and analysis performed by our team. The report will provide the City with information on: City of iVienitce 3-7 2020 Pavement Management Program Update 2671/031858-0001 7630376.2 a00/00/00 '7- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Approach/Scope of Work • Current inventory and pavement conditions indices(PCI)for all road classes; ■ Projected seven(7)year annual rehabilitation programs for street maintenance for a 7- yr period (ARTERIAL and LOCAL Forecast Maintenance Reports)that show the largest return on investment and acceptable levels of service; • Proactive stop gap/preventive maintenance strategies' ■ Modeling and comparison of budget scenarios will include: Budget Analysis and Funding Scenarios Budget Needs Assessment Utilize Existing Budget Maintain Current Pavement Condition Index(PCI) Improve Network PC](by5 pts,if feasible) Improve Network to Regional Target PCI • Other scenarios may include: Gradual, Frontloaded, Constrained and Unlimited funding analysis' ■ Strategies and recommendations for the City's maintenance programs and procedures, including a preventative maintenance schedule;and ■ A detailed breakdown of deferred maintenance(backlog) . We will make a presentation of the results from the 2020 PMS update to City personal and/or City Council if necessary-pro Bono. Registered Engineer Mr.Steve Buckram,P.E.will supervise all operations,review all completed data and prepare and sign a final report incorporating the results of our pavement evaluation and conditions. We will provide engineered recommendations for pavement rehabilitation and replacementdesign based upon field data and analysis. Deliverable: Three (3) bound copies of the Final Pavement PMS Report (plus one original signed by our Registered Engineer, CA No. 20903), in binder form,will be sent to the City. Bucknam will provide one (1) digital copies that includes all final reporting documents, PMS database and GIS files. Task 4.5: PMP Mapping and GIS As an enhancement and proactive approach to this project, our staff will update the existing Pavement-GIS link between PIMP database and the City's GIS system. Buckram will review,with City staff, all ongoing upcoming capital projects that may impact the GIS mapping delivered for this project. The maps described below will be incorporated into the City's Final PMS report: City of Menifee 3-8 2020 Pavement Management Program Update 2671/031858-0001 7630376.2 a00/00/00 'g— DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Approach/Scope of Work QF,�e,e • PCl values for every section(24x36) City.of M en fee,cn PevemeM�ar]iiici.�ll F• • Work History identifications(2436) ;I `, • 7-yr Arterial / Local Rehabilitation ands. Slurry Seal Programs(2406) • Functional classification maps(2436) =. Once the City has approved the Pavement Condition Report, we will update the necessary Micro PAVER/StreetSaver-GIS linkages (street names will be shown on all maps). By using the unique ID's within the PMS and the City's ESRI street shapefile ID's,we will create a one-to-one match for each pavement section in the GIS. Our staff will coordinate all project deliveries with the Public Works and the GIS division to ensure that the most current and accurate PMS-GIS e maps are represented within the City's GIS enterprise. IYk We can also provide this data to the City's web-based GIS Enterprise. Deliverable: Complete GIS files/themes based on list above(shapefiles). Task 4.6: Purchase of PMS Software/Training/On-call Support Pending the City's decision on Micro PAVER or StreetSaver, the City has elected to purchase their own licensed copy of PMS software. When this occurs,Buckram will assist the City in purchasing the software from Colorado State University(Micro PAVER)or MTC(StreetSaver). The new license will be issued in the City's name and all future mailings regarding maintenance fees will be directed to the City's main contact. In the case of StreetSaver being purchased,the City states within their RFP that the potential purchase and use of GIS Toolbox will be needed. The goal is to train City staff to perform PMP updates in-house. Our training and support will cover the following key elements of PMP management: • Data entry, report generation,work history data entry, use of GISToolbox(StreetSaver); • Performing PCI calculations,budget analysis; • Response to on-call support for one year(T&M) basis for estimated 100 hours; • Provision of training materials and conduct a one-day Distress Condition training workshop with the morning section presenting an overview of pavement distresses followed by afternoon field review/survey. City of Menifee 3-9 2020 Pavement Management Program Update 2671/031858-0001 7630376.2 a00/00/00 -9- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Approach/Scope of Work Project Deliverables At the completion of the project and City approval of all reporting, Bucknam will deliver the following items: Project Deliverables Easily understood,organized,worded and illustrated project documentation Cover sheets associated with all submittals Documents will be organzied for easy review Project graphics in color,associated with black/white materials for easy reproduction Two(2)hardcopy draft reports and three(3)hardcopy Final reports-MS Word 2013 format Four(4)full size maps of the City's Final PCI Maps(24x36) All final documents in Adobe.pdf format Complete GIS files(project&shapefile)compatible with Menifee GIS Enterprise Final PMP database 5)Optional Services Task 5.1: Automated Digital Roadway Imaging As an alternative survey method,our staff will implement a pavement survey methodology that will support Task 4 efforts as well as implement a proactive and cost efficient GPS survey methodology that will allowfor the collection of numerous GPS asset locations using"one"set of digital imagery(e.g.five citywide infrastructure surreys forthe cost of one). Beyond the pavement survey capabilities,the City will be able to collect other infrastructure assets in the future such as signs, catch basins, street lights, manhole/water covers, guardrails, pavement markings and other ROW features; a tremendous costs savings that reaches r I $300,000 over the next 3 years. Pending the amount of ROW assets to III . be collected vs. the PMP budget Bucknam will assist the City in prioritizing which ROW assets can be collected under this project(see Proposed Fee). With verification of street segmentation,the inspection of approximately 325 Arterial miles will be surveyed. Micro PAVER/StreetSaver-Army Corp of Engineers AC and PCC distress types will be collected based upon actual surface conditions and physical characteristics of the segment while being flexible to current City practices. Our automated digital imaging allows technician to collect the following: • Continuous pavement imaging (images taken every 5 meters, competition typically surveys at every 8 meters/25 feet intervals) • Army Corps AC and PCC distresses —ASTM D6433-20 (e.g. linear/transverse cracking, alligator,patching,bleeding,block cracking,etc. • Surface roughness ratings(IRI); rutting depth(full width of lane or street) • Imaging captures 100%of each pavement segment(not just one lane) City of iVienitce 3-10 2020 Pavement Management Program Ul;. 2671/031858-0001 7630376.2 a00/00/00 DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Approach/Scope of Work • Data transfers seamlessly to MicroPAVER/StreetSaver • 2mm pixel images allows for centimeter horizontal and vertical accuracy The first survey process will involve the mobile GPS vehicle taking approximately three-week's time to survey the Menifee's street network; additionally,the vehicles drive the posted speed limits. The images that are collected are taken by using Sony digital stereographic cameras(4 to 6 cameras) positioned on the vehicle. The images have a resolution of 2450 x 2050 and are geo- referenced by means of inertial GPS equipment contained within the van;images are taken every 4 to 6 meters,15 ft.intervals. The quality of the imagery and its GIS/record collecting capabilities within the software provided allows the technician to accurately identify the required pavement distresses defined by the pavement software and the project (distresses are collected in-house). All pavement GIS data associated with each pavement section will be entered into the City's working software. Surrey vehicles are equipped with digital measuring instrumentation (DMI)that will be used to verify all pavement section lengths and widths. Ourvehicles can be equipped with road roughness rating equipment,strip mapping cameras and are set to record 360 degree street imaging. The survey will be performed by the Buckram team that is experienced and trained in pavement condition assessment using LambdaTech's"Feature Extraction"software. Bucknam will measure specific distress types from the digital image set. A listing of the field attributes that will be collected during the survey is listed above in Task 4.2. Bucknam has performed this service forthe following SoCal local agencies: RoadwayDigital Lake Elsinore Rancho Palos Verdes Lomita Aliso Viejo Culver City Rancho Santa Margarita Bellflower Cypress Tustin Beverly Hills Fountain Valley Palm Desert Compton La Habra Heights Palmdale City of Menifee 3-11 2020 Pavement Management Program Update 2671/031858-0001 7630376.2 a00/00/00 DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Fee Proposal E) - Fee Proposal Bucknam Inc Infrastructure Group,.has included a time&materials,not-to-exceed proposed fee for the City's consideration (separate envelope). Our fee follows the described tasks shown within the Scope of Work; Hourly Rate Schedule enclosed as well. Bucknam is willing to"lock-in"our demonstrated hourly rate schedule for the next three years in regard to the City's PMP contract term. These hourly rates have been utilized for Menifee since 2015. As indicated within ourfee,all tasks are neeotiable. City of Menifee 6.1 2020 Pavement Management Program Update 2671/031858-0001 7630376.2 a00/00/00 -12- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A CITY OFMVVIFEE,CA 2020 Pavement Condition Evaluation Pavement Management Program Update Proposed Fee-Sep mm6er 10,21220 Description Principal Project GIS Manager 7echniCian Field Admin Total by Task _ Marta er s Base Fee $250/hr $175/hr $13S/hr $8fi/hr $7S/hr Task 1 Nick-off Meeting PMP Services Task 1.1 Project Kirk off 2 2 $522 Pro-bona PMP Software Evaluation-Recommendation it $0 Task 1.2 Project Status Meetings-41:al ity Cc ntro l Program 3 2 38 $4,063 Task 2 Clio at SAtlsfactton Task 2.1 Project Deliverables 1 2 2 2 $1,020 Task 3 Project Schedule Task 3.1 Work Plow/Project Schedule 2 2 $S22 Task 4 Scope of Work Task 4.1 Update Maintenance and Rehabilitation History _ Pavemc nt Work History Data Entry 2 1 12 $1,517 Task 4.2 pavement Condition Surveys CNywlde Street Survey-Walking Z020Survey(approx.325 miles) 12 6 433 $40.149 Task 4.3 Budgetary Analysis/Pavement Improvement Report 5 1 $1,135 Task 4.4 Final LIP Report/Forecasted Maintenance Reports 2020 B ien n i al Re porti ng 11 32 8 21 1 $7,177 Task 4.5 PMP Mapping and GIS PMP-GIS Layer Update Cost 2 16 4 $2,854 Task 4.6 Purchase of StreetSaver-Training Purchase of MicroPAVER annual support $800 PMP Training/On-cal ISupport 3 3 14 $2.134 Reim b ursables(mileage,pri rai ng,materia Is) $4,875 All deliverables will become property of the City of Menifee All Tasks are negotia ble Total Hours per Staff 2 66 38 so 3 Total Base Fee $ soe $ 11,sso $ s,d30 $ 43,6g6 $ 225 66,758 O ptlo na I Se rvices Task 4.2 Base Digital Roadway Imaging will allow for. Using Digital Rw dway Imagi ng al lows Bockna m to Cc l lea additional asset$u nderone su rvey: Sin Invento LocalSigns,a pprox.5,50os n sJ TSD Traffic Signals TBD Street lights TBD Guardrails(a pprox.200 TBD PCC C&G.PCC sidewa Its.ADA c urb ra mps.AC berm(Iocatian/d igitxati on o n ly-loca I51 TB❑ a pprox.sidewalk miles a uals 183 miles-considers 8036sidewalk,C&G both sides) =no distress fond ition dais eollemd B ucknam pp.rFo rmed these services do ri ng the 2018 pmip It for Arterials an Total Base Fee+Optic)nal 18i7 AddiLin naI uptiunal services and/ur services nulsiiie of this contr aCL wil l be negr:lin led with the Ci ly where we will use the Stdndard Hourly Rate schedule •Notes/Assumptions: Task 4.1 Bucknam provide PRO BONO PMS Software evaluation&recommendation report Task 4.6 If City moms a wa V from Mir.roPAVE R,Bu rk nam will assist the.City in purchasing Iirensud copy of StreetSaver and install w/I MTC Cloud server ' 6.2 2671/031858-0001 7630376.2 a00/00/00 -13- DocuSign Envelope ID: F90BA16A-E9AO-43EC-AEEO-3EFA7C8FDB8A Standard Hourly Rate Schedule Category Rate Principal $250 Senior Project Manager 215 Senior Engineer/Planner 195 Construction Manager 185 Pavement Management Project Manager 175 ManagementAnalyst 165 Project Engineer/Planner 155 Senior Engineer/Senior Technician/GIS Planner/Senior inspector 135 A=Engineer/Asst.Technician/GISAnalyst/Inspector 125 C400 Operator 110 Adm in istra rive Assisto nt 105 Field Technician 86 Lierical/Word Processing 75 Forensic Services Quote Reimhursohks Mileage $0.67/mile Suhconsultant Services Cost-r 15% Reproduction Cost-r 15% Travel&Subsistence Cost-r 15% Fees&Permits Cost-r 15% Computer Services(External) Cost t 15% Standard Hourly Rates shown will not be changed and/or 35aa Seagate Way,Suite 230 increased during the B U C K N A M Oceanside,CA 92056 INFRASTRUCTURE GROUP.INC T:{kna 216-fi5 rn contrail period www.6u�knarrrinceam 6-3 2671/031858-0001 7630376.2 a00/00/00 -1 4-