2012/01/03 Becker Engineering Amendment No. 2 08/17/2010 agreement AMENDMENT NO. 2 TO
PROFESSIONAL SERVICES AGREEMENT
This is Amendment No. 2 to that certain AGREEMENT for Professional Services
Agreement ("Agreement") made on August 17, 2010, by and between the City of Menifee
("City") and Contractor: BECKER ENGINEERING ("Consultant"), which Amendment is made
and entered into on January 3, 2012 to increase the scope of work and compensation as
indicated below:
Section 1.1, "Term of Services" is amended to read as follows:
Section 1.1 Term of Services. The term of this Agreement shall begin on January 3, 2012
and shall end on June 30, 2012.
Section 2, "Compensation" is amended to read as follows:
Section 2. COMPENSATION. City hereby agrees to pay Contractor a sum not to exceed
$200,000 on a time and material basis based the rates and expenses contained in Exhibits A
and B.
Section 5, Indemnification" is amended to read as follows:
Section 5. INDEMNIFICATION: Contractor shall hold harmless, defend and indemnify City
of Menifee,its officers, officials, employees and volunteers from and against all claims,
damages, losses and expenses including attorney fees which actually or allegedly arise out of
the performance of the work described herein, caused in whole or in part by any negligent act or
omission of the contractor, any subcontractor, anyone directly or indirectly employed by any of
them or anyone for whose acts any of them may be liable, except where caused by the active
negligence, sole negligence, or willful misconduct of City of Menifee, its officers, officials,
employees and volunteers.
Section 7.2, "Compliance with Applicable Laws" is amended to read as follows:
Section 7.2 Compliance with Applicable Laws. Consultant and any subcontractor shall
comply with all applicable local, state and federal laws and regulations applicable to the
performance of the work hereunder. Consultant shall not hire or employ any person to perform
work within the City of Menifee or allow any person to perform work required under this
Agreement unless such person is properly documented and legally entitled to be employed
within the United States. Consultant shall require the same of all subcontractors.
J
Amendment No 2 with Becker Engineering 2 of 2
Uyu Walter Becker, General Manager and CEO
John V. Denver, Mayor of Becker Engineering
Attest: Appr as o Form:
i�
Kathy Bennett, City Clerk Jo ep . Fletcher, Cit Attorney
Amendment No 2 with Becker Engineering 2 of 2
Table of Contents
Page 2 Table of Contents
'Page 3 Cover Letter
Page 4 Compensation Schedule
Page 5 Compensation Schedule Continued
Page 6 2011-2012 Public Works Time and Material Pricing
Page 2
BEC:KFR CONSTRUCTION SERVICES INC.
GENERAL-ENGINEERING- CONSTRUCTION
LICENSE#683396-A
E-MAIL-infQQbe kc erengineedno.org
PO BOX 990365 NEXTEL-951-712-2341
TEUECULA,CA FAX-951-926-8611
92589-0365
November 28,2011
City of Menifee
29714 Hann Road
Menifee,CA 92586
Terri Willoughby
Finance Director
i
Dear Terri Willoughby:
As per your request,we are providing you with a new amendment to our proposal and price
sheets,as previously in place and approved contract,accepted by the City of Menifee dated
August 16,2011,to increase the scope of work and compensation,with no changes for the time
period January 1,2012 thru June 30,2012.
Should you have questions or need clarification,please call me direct at any time.
Thank you in advance for your consideration,
4aj1Bec
CEO
Becker Construction Services Inc.
(951)712-2341
Becker Construction Services Inc.
City of Menifee
Estimated Quantities
July 1,2010 thru December31,2011
UNIT
No. ACTIVITY DESCRIPTION UNIT EST.# COST TOTAL EST Comments/Notes
$/Unit (Unit*Est#)
Roadway Maintenance
Pothole/Hand Patching SF 5000 $483.00 Pricing is Per Ton
R&R 4"AC•Surface<500 SF SF 1000 $6.7275 $6,727.50
R&R 4"AC Surface>500 SF SF 1000 $5.6925 $5,692.50
R&R 8"AC Surface<500 SF SF $11.4425 $0.00
R&R 8"AC Surface>500 SF SF $11.2125 $0.00
Concrete Grinding SF 100 $5.90 $590.00
Curb&Gutter R&R LF 300 $43.60 $13,080.00 Includes A.C.Slot Replacement
4"Base Installation SF 3000 $2.84 $8,520.00
Guardrail replacement LF 100 $66.80 $6,680.00 Includes Posts
Traffic Control HOURS 250 $71.50 $17,875.00 1 man with truck
Subtotal 10750 $59,165.00
Parkway Maintenance
Sidewalk R&R SF 2000 $9.65 $19,300.00
Sidewalk Placement SF 1000 $7.85 $7,850.00
Sidewalk grinding EACH 200 $0.00 Info to Vague
Weed Spraying Is Typically Billed
Weed Control/Spraying HR 200 $0.00 Per Acre
Weed Spraying Is Typically Billed
ROW Clearing HR 300 $0.00 Per Acre
Weed Spraying Is Typically Billed
Weed Removal HR 250 $0.00 Per Acre
$34.50 for each additional man
Litter/Debris Pickup HR 300 $43.70 $13,110.00 required
New sign installation EACH 50 $65.00 $3,250.00
New sign post installation EACH 60 $85.00 $4,250.00
Sign Cost+ 15% EACH 15000 $0.00 Unknown as.to what kind or size
Remove and replace signs EACH 60 $65.00 $3,900.00
Patch sidewalks with asphalt SF 100 $4.50 $450.00 One Move in
Construct AC ramps EACH 40 $0.00 Info to Vague
Curb Painting LF 2000 $0.00 Info to Vague
Tree trimming EACH 50 $0.00 Info to Vague
Tree Removal<12"Dia EACH 20 $1,250.00 $25.000.00 Includes Roots
Graffiti Removal HR 40 $85.00 $3,400.00
Saw Cutting LF $0.00 Info to Vague
Chain link fence repair LF $0.00 Info to Vague
Subtotal 21660 $80,610.00
Misc. Maintenance
Clean and Flush Culverts EA 100 $0.00 Info To Vague
Gutter cleaning LF 1000 $0.90 $900.00
Clean Catch Basins EA 500 $357.00 $178,500.00
Catch Basin Stenciling EA 100 $42.00 $4,200.00
Subtotal 1700 '$183,600.00
Note:This is an original, accepted by City Council July.1,2010 thru Page 4
December 31,,,2011
Becker Construction Services Inc.
City of Menifee
Estimated Quantities
July 1,2010 thru December 31, 2011
UNIT
CODE ACTIVITY DESCRIPTION UNIT EST.# COST TOTAL EST Comments/Notes
$/Unit (Unit*Est#)
Non-Routine Maintenance
1-person crew HR 100 $59.25 $5,925.00
2-person crew HR 250 $135.50 $33,875.00
Rates Provided on P.W.Sheet
Misc.Tractor work HR 40 $0.00 Attached
General Supervision/Forman HR 250 $76.25 $19,062.50
1-person call out HR 60 $300.00 $18,000.00
2-person call out HR 60 $600.00 $36,000.00
Pick up truck HR 500 $28.00 $14,000.00 Bare, Non Operated
Flatbed Truck HR 1000 $42.00 $42,000.00 Bare, Non Operated
Rates Provided on P.W.Sheet
Tractor/Loader HR . 40 $0.00 Attached
Field/Code Inspections HR 250 $76.25 $19,062.50
Material Cost $ $0.00
Other Equipment-Specify $0.00
Subtotal 2550 $187,925.00
Pavement Markings
4"Skip Striping SF 75000 $0.046 $3,450.00
4"Solid LF 2000 $0.069 $138.00
6"Solid LF 20000 $0.115 $2,300.00
8"Solid LF 10000 $0.115 $1,150.00
12"Solid, LF 10000 $1.150 $11,500.00
Solid Double LF 20000 $0.138 $2,760.00
Broken Double LF 10000 $0.127 $1,265.00
Turn Arrows EACH 200 $28.750 $5,750.00
8'Letters EACH 1000 $9.200 $9,200.00
Bike Lane Stencils EACH 10 $40.250 $402.50
Reflective Pavement
Markers EACH 200 $4.600 $920,00
Raised Pavement Markers EACH 200 $2.300 $460.00
Line Layout-STATE
minimum LF 1,000 $0.230 $230.00
Striping-STATE minimum EACH 1 Day 1 Day minimum$2,875,00
Marking-STATE minimum EACH 1 Day 1 Day minimum$2,875.00
Sandblast-STATE minimum EACH 1 Day 1 Day minimum$2,875.00
Fog Seal LF 200 $0.00
Subtotal 149810 $39,525.50
Note: This is an original., accepted by City Council July 1,2010 thru Page 5
December 31,2011
BECKER CONSTRUCTION SERVICES INC.
P.O.Box 890365
CA license#683396-A Temecula Ca 92589
General . Engineering . Construction
Public Works Proposal
LABOR RATES
S.T. O.T.
SUPERINTENDENT WITH 1 TON TRUCK $76.25 $114.85
FOREMAN WITH 1 TON TRUCK $71.50 $104.00
GENERAL LABORER $59.25 $ 84.75
NOTE:THESE LABOR RATES REFLECT LATEST RISES IN P.W.SCALE.
BARE EQUIPMENT
140 EXCAVATOR $ 97.15 PER HOUR
545 EXCAVATOR $ 82.84 PER HOUR
KUBOTA KX120 $ 72.30 PER HOUR
KX91 KUBOTA EXCAVATOR $ 72.30 PER HOUR
450 DOZER $ 97.15 PER HOUR
SKIPLOADER $ 54.30 PER HOUR
310 BACKHOE $ 72.30 PER HOUR
2040 MUSTANG $ 57.60 PER HOUR
2040 MUSTANG W/BREAKER $ 90.00 PER HOUR
2086 MUSTANG $ 72.30 PER HOUR
2086 MUSTANG W/BREAKER $101.05 PER HOUR
4 YARD LOADER $97.15 PER HOUR
BOBTAIL DUMP $ 72.30 PER HOUR
1 TO 3 TON ROLLER $ 37.80 PER HOUR
3 TO 5 TON ROLLER $ 54.30 PER HOUR
VIBRATORY PLATE $ 30.80 PER HOUR
WACKER TAMP $ 30.80 PER HOUR
WATER TRUCK $ 72.30 PER HOUR
D-4 DOZER $ 97.15 PER HOUR
D-5 DOZER $ 97.15 PER HOUR
D-6 DOZER $130.00 PER HOUR
D-8 DOZER $160.00 PER HOUR
12 G BLADE $138.50 PER HOUR
14 G BLADE $13850 PER HOUR
SWEEPER ATTACHMENT $ 37.80 PER HOUR
AREA MOVE INS $120.00
ALL MATERIALS AND RATES AT A.P.W.STANDARDS BOOK RATES
Page 6