Griffith Co. - Newport Rd. Widening Job#10507.10CALIFORNIA PRELIMINARY NOTICE
IN ACCORDANCE WITH SECTIONS 8102, 8202, 9302, 9303 CALIFORNIA CIVIL CODE
THIS IS NOT A LIEN. This is not a reflection on the integrity of any contractor or subcontractor.
CONSTRUCTION LENDER
(or Reputed Construction Lender, if any)
Alliant Insurance Service, Inc.
Bond# 24051719
1301 Dove Street #200
Newport Beach, CA 92660
OWNER
(or Reputed Owner(s) I Public Entit)gity of Menifee
City of Menifee Building & Safety Dept.
29714 Haun Road
Menifee, CA 92586 AUG 15 2013
s
DIRECT CONTRACTOR Received
(or Reputed Direct Contractor, if any)
Griffith Company (SFS)
12200 Bloomfield Ave.
Santa Fe Springs, CA 90670
SUBCONTRACTOR/OTHER
(or Reputed Subcontractor / Other, if any)
An estimate of the total price of the labor,
services, equipment or materials provided
or to be provided is: $333,965.00
PROOF OF NOTICE DECLARATION
(California Civil Code Section 8118)
I, Becki Cisneros declare that I served
copies of this Preliminary Notice by:
CERTIFIED MAIL
postage prepaid, on the persons named, at the places
shown above on: August 13, 2013
Documentation of service by mail as required by
Civil Code Section 8118, is retained in our records.
If service is made by other methods, an alternate proof
of notice declaration has been utilized.
I declare under the penalty of perjury under the laws
of California that the foregoing is true and correct.
Executed on: August 13, 2013
at , California
Job No.: 4346
NAMEAND ADDRESS OF CLAIMANT GIVING NOTICE:
MSL Electric, INC.
4938 E La Palma Ave
Anaheim CA 92807-1912
has furnished or will furnish labor, service, equipment
or material of the following general description:
Electrical contracting
Description of job site sufficient for identification:
Newport Road Widening CIP 01-13 TS/Loops
Griffith Job #10507.10, MSL Job # 4346
Menifee, CA
The name of the person or firm who contracted for the
purchase of such labor, services, equipment or material
furnished is:
Griffith Company
Trust funds to which Fringe Benefits are Payable
Local 11, 12, 440, 441, 477, 652
NOTICE TO PROPERTY OWNER
EVEN THOUGH YOU HAVE PAID YOUR CONTRACTOR IN FULL,
if the person or firm that has given you this notice is not
paid in full for labor, service, equipment or material
provided or to be provided to your construction project, a
lien may be placed on your property. Foreclosure of the lien
may lead to loss of all or part of your property. You may
wish to protect yourself against this by (1) requiring your
contractor to provide a signed release by the person or firm
that has given you this notice before making payment to
your contractor, or (2) any other method that is appropriate
under the circumstances.
This notice is required by law to be served by the
undersigned as a statement of your legal rights. This notice
is not Intended to reflect upon the financial condition of the
contractor or the person employed by you on the
construction project
If you record a notice of cessation or completion of your
construction project, you must within 10 days after recording,
send a copy of the notice of completion to your contractor
and the person or firm that has given you this notice. The
notice must be sent by registered or certified mail. Failure
to send the notice will extend the deadline to record a claim
of lien. You are not required to send the notice if you are a
residential homeowner of a dwelling containing four or
fewer uni
(Signature of person making service)
Fmm No. 100 Prelimsolutions.com