Loading...
IE General Engineering Inc 06-03-2019CALIFORNIA PRELIMINARY NOTICE IN ACCORDANCE WITH SECTION 3097 AND 3098, CALIFORNIA CIVIL CODE THIS IS NOT A LIEN, THIS IS NOT A REFLECTION ON THE INTEGRITY OF ANY CONTRACTOR OR SUBCONTRACTOR CONSTRUCTION LENDER or S.C. Siclns & Suoplies, ILLC Reputed Construction Lender, if any (name of person or firm furnishing labor, services, equipment or material) None Available city of Meniree 2411 E. Winston Road City Clerk Anaheim, CA 92806 UUN0 3 201 (address of person or firm furnishing labor, services, equipment or material) has furnished or will furnish labor, services, equipment or Received materials of the following general description: SIGNS POSTS and other related materials (general description of the labor, services, equipment or material furnished or to be furnished) OWNER or PUBLIC AGENCY or Reputed Owner (on public work for the building, structure or other work of improvement or private work) located at: ADAMS AVE. STREET IMPROVEMENTS CITY OF MENIFEE 29844 HAUN RD. (address or description of Job site sufficient for identification) MENIFEE, CA 92586 7018 1830 0001 2743 0597 The name of the person or firm who contracted for the purchase of such labor, services, equipment or material is: SUPERIOR PAVEMENT MARKINGS 5312 CYPRESS STREET CYPRESS, CA 90630 An estimate of the total price of the labor, services equipment or materials furnished or to be furnished is: ORIGINAL CONTRACTOR or $ 2,900.00 but not limited to Reputed Contractor, if any IE GENERAL ENGINEERING INC. P.O. BOX 734 CALIMESA, CA 92320 Attention: Subcontractors Section 3097 requires that if you give this notice and you have failed to 7018 1830 0001 2743 0603 pay all compensation due to your laborers on the job, this notice shall also contain the identity and address of any laborer and any express trust fund to whom employer payments are due. NOTICE TO PROPERTY OWNER If bills are not paid in full for the labor, services, equipment, or materials furnished or to be furnished, a mechanic's lien leading to the loss, through court foreclosure SUBCONTRACTOR with whom claimant proceedings, of all or part of your property being so Improved may be placed against has contracted the property even though you have paid your contractor In full. You may wish to SUPERIOR PAVEMENT MARKINGS protect yourself against this consequence by (1) requiring your contractor to furnish 5312 CYPRESS STREET 6519 a signed release by the person or firm giving you this notice before making payment CYPRESS, CA 90630 to your contractor or (2) any other method or device that Is appropriate under the circumstances. Other than residential homeowners of dwellings containing fewer than 7018 1830 0001 2743 0610 five units, private projects owners must notify the original contactor and any lien claimant who has provided the owner with a preliminary 20-day lien notice in accordance with Section 3097 of the Civil Code that a notice of completion or notice of cessation has been recorded within 10 days of Its recordation Notice shall be registered mall, certified mall, or first-class mail, evidenced by a certificate of mall. Failure to notify will extend the deadlines to record a lien. 5/31/2019 (714) 254-7054 `Dated: Sl ature 0 Member GoldStar Asphalt Products (951) 940-1610 Phone 1354 Jet Way (951) 355-0001 Fax Perris, Ca. 92571 IMPORTANT NOTICE PLEASE READ CAREFULLY Enclosed you will find a 20-Day Preliminary Notice that is being sent to you on behalf of Goldstar Asphalt Products. It is important to note that this notice is NOT A LIEN. This is a routine procedure to comply with certain state requirements that may exist and should not reflect in any way on the integrity or credit standing of any of the known interested parties associated with this job. Should you have any questions or concerns, please feel free to contact Goldstar Asphalt Products at 951-940-1610.